Surat Metro Rail Project.

This Project Viewed 227 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: metro rail
  • Updated On: September 30 2024
  • Cost: Rs. 12,000 crore

Location of the project

  • CitySurat
  • StateGujarat
  • CountryIndia

Project Details

  • Surat Metro Rail Project. The DPR (detailed project report) of the 35-km-long metro rail is being prepared by Delhi Metro Rail Corporation (DMRC) and is likely to be ready by March 2017. Japanese funding agency Japan International Corporation Agency (JICA) has shown keen interest for financing the project. May 2018: The revised detailed project report (DPR) of Surat Metro rail project is likely to get an approval from local authorities by end of May 2018. Mar 2019: The government of India has given nod for Surat Metro Rail Project in Gujarat having two metro rail corridors with combined length of 40.35 km. July 2019: SMRC is in the process of finalising the alignment near Sarsana convention centre. Once the process is finalised, tenders for the work will be issued. The Surat Metro Rail Corporation (SMRC) held a meeting to resolve issues so that work can commence to lay the first 10 km of rail lines from Dream City to Kadarsha Ni Naal. Dec 2019 : Construction work set to start in June 2020 and the centre in March this year approved Phase-I of the Surat Metro project, under which two corridors will be constructed at an estimated cost of Rs 12,000 crore. Likely to be completed by June 2024 June 2020 : In May Surat metro design tenders invited and Gujarat Metro Rail Corp has called tenders for the design of two elevated sections of the first phase of a metro in Surat. The Gujarat Metro Rail Corporation (GMRC) has invited bids for construction of 11.6 km elevated viaduct from Kadarsha Ni Nal to Dream City Dead End, including ramp for depot entry near Dream City and 10 stations (excluding E&M architectural finishing and roofing) for Surat Metro Rail Project Phase-1, Package-CS1. The estimated value of the project is Rs 805.15 crore. July 2020: GMRC has floated tender for engagement of consultancy services for development of multi-modal integration plan for Corridor-1 from Sarthana (Ch 0.0) to Dream City (Ch 20,710.30) 20 stations and Corridor-2 from Bhesan (Ch 0.0) to Saroli (Ch 17,341.80) 18 stations. Aug 2020: Bids are invited for design, construction and completion of underground stations and tunnel including finishes from surat railway station to chowk bazar ramp from chainage 7160.6m to chainage 10720m, comprising twin bored underground tunnel between surat railway station and south ramp, all cut and cover portion including three underground stations viz. chowk bazar, maskati hospital and surat railway station with entry/exits & connecting subway by box pushing method and a portion of natm and launching and receiving chambers of tbm for surat metro rail project, phase-i. Tender value is Rs.942.16 cr. Oct 2020 : Tenders invited for Design Consultancy Services for corridor 1 & 2 Nov 2020 : Four Firms submit bids for Construction of Underground Line of Surat Metro. Jan 2021: J Kumar Infraprojects has received letter of acceptance (LoA) design, construction and completion of underground stations and tunnel from Surat Railway Station to Chowk Bazar Ramp worth Rs 866 crore. Sadbhav Engineering has received letter of acceptance (LoA) construction of 11.6 km of elevated viaduct from Kadarsha Ni Nal to Dream City Dead End including ramp for depot entry near Dream City and 10 stations (Excl E&M, architectural finishing and roofing) for Surat Metro Rail Project Phase-1, Package-CS1 in the name of SEL-SPSCPL Joint Venture. The contract is valued at Rs 779.73 crore. Jan 2021: GMRC has floated tender for development and construction of dream city depot including metro bhavan, OCC & associated E&M works under corridor C1, Sardhana to dream city, in connection with Surat Metro Rail (Phase-I) of Gujarat (Package DC-01). The work will be completed in a period of 20 months at a cost of Rs. 346 crore. Prime Minister Narendra Modi on 18 January 2021 conducted bhoomi pujan of Surat Metro project. Aug 2021 : Systra secures India’s Surat Metro Rail Project Phase I contract and project is expected to continue for 42 months, has received funding from the French Development Agency (AFD) and the German development bank KfW. Sept 2021 : Construction work for Phase-1 of the Rs 12,020-crore Surat Metro rail project has begun after tenders worth over Rs 3,002 crore for various civil works, including those for the underground section, were awarded by the Gujarat Metro Rail Corporation (GMRC). Nov 2021: RINA India Private Limited has won a contract for provision of detailed design consultancy (DDC) services for the Surat Metro Rail Project Phase-I. Jan 2022: The Gujarat Metro Rail Corporation has fast-tracked the Phase-I of the Surat Metro Rail Project comprising an underground 6.5km stretch from Kapodrato Chowk Bazar through Labheshwar Chowk, Central Warehouse, Surat Railway Station up to Maskati Hospital. June 2022: Dilip Buildcon through RBL-DBL joint venture (JV) has been declared as the lowest (L1) bidder for Surat Metro Rail… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares