News On Projects
Products & Services
Projects Database
Tenders Database
E - Newsletter
EPXonline.com
Project Financing
Contracts & Awards
Energy
Electricity
Mining
Oil & Gas
Infrastructure
Airport
Port
Railway
Road
Freezone
Construction
Manufacturing
Cement
Engineering
Automobile
Plastic
Metal
Textile
Paper & Packaging
Leather
Sugar
Edible Oil
Electrical & Electro
Processing
Chemical
Drugs & Pharma
Fertiliser
I-C-T
Communication
IT
Telecom
Water
Pump Station
Water Treatment
Water Supply
Hospitality
Hotel
Restaurant
Resort
Entertainment
Sports
Multiplex
Theme Park
Food & Beverages
Hospital
Service
Social
Science
Irrigation
Government
Policy
Economic Indicators
Company News
Commerce
Miscellaneous
News Uploaded On : Tuesday, January 09, 2018 10:58:00 AM IND Back  |  Latest Projects  |  Latest Tenders
 
 E-mail this to a friend        Printable version       Story Viewed 2176 Times
Modernisation of railway workshop in Mysuru to commence this month.
The long-pending modernisation and upgrading of the railway workshop at Ashokapuram in the city is set to take shape with the physical engineering work of the project set to commence this month.

The upgrading entails creating new infrastructure at a cost of nearly ₹35 crore towards capacity augmentation of the workshop which undertakes Periodic Over Hauling (POH) of railway coaches.

POH of coaches is undertaken once in 12 or 18 months depending on the km clocked by the coach and is akin to servicing and maintenance with complete overhaul, including repairs and replacement of the parts that have a wear and tear. The Central Workshop in the city is one of the two of such facility in South Western Railways, the other being at Hubballi. The augmentation will shore up the workshop’s capacity to take up more coaches for POH.

At present, 70 coaches undergo POH each month and this will increase to 80once the new facilities are in place, Neeraj Jain, Chief Workshops Manager, Central Workshop, told The Hindu. He said the workshop undertakes POH of both ICF-designed coaches that are used in conventional trains besides the German-designed Linke Hofmann Busch (LHB) coaches used in the rakes of Shatabdi and Rajdhani trains. “The workshop at Mysuru is the only facility in the State to take up the POH of LHB coaches and the enhancement of the POH capacity also includes 14 AC and LHB coaches. Indian Railways has a long-term plan to switch over to LHB coaches completely and hence the workshop will also ramp up its capacity for POH of LHB coaches gradually,” he added.

The new infrastructure includes new sheds and heavy-duty 60 tonne cranes to lift and shift the coaches which will obviate the need for procuring loco every time a coach needs to be moved. It will also reduce the time taken for POH. Construction of new carriage lift, heavy corrosion repair shop of 20 coaches capacity with provision of 10 BG tracks with a spacing of 10 meters apart for a length of 80 meters each among others are other facilities to be created. In addition, a ₹18-crore proposal for a paint shop has also been submitted.

The workshop was established to cater to the erstwhile Mysore State Railway in 1924 and was expanded in 1932 for maintaining the metre gauge coaches. Consequent to the railways adopting a uni-gauge policy, the facility was converted to BG workshop and is now on its path to modernisation to service LHB coaches as well.

THE HINDU

Post your comments:

Your name: *
E-Mail Id:
E-mail ID will not be published
Comment: *
Maximum 500 Characters
    
Related Stories
Colaba-Bandra-SEEPZ route: Metro 3 will be delayed by six months, MMRC tells govt.
Monorail receives Commissioner of Rail Safety clearance.
Southern Rly completes 150 km of track doubling, gauge conversion.
Railway body invites proposal to modernise Chandigarh station.
High-speed train for Hyderabad Airport Metro.
CS wants railway projects to be expedited.
Four railway stations to be redeveloped.
Metro Rail to add 31 km to connect Hyderabad airport.
Six years on, rail overbridge at Elavur nears completion.
Plan to give Shenoy Nagar metro station a makeover awaits Tamil Nadu government nod.
RELATED PROJECTS & TENDERS
ADVERTISEMENT
MOST POPULAR STORIES NOW
For all enquiries please contact
Tel: 022 - 25961254, 25960909
Mobile: 9821464666/09751178830
Mail: marketing@newsonprojects.com

OUR OTHER PRODUCTS & SERVICES:    Projects Database   |   Project e-Newsletter   |   Tenders Database   |   Commissioned Power Plants   |   Company Index
About Us   |   Contact Us   |   Terms of Use   |   Advertise with Us   |   Privacy Policy   |   Disclaimer   |   Feedback