Search Tips

Navi Mumbai Metro Rail project.

This Project Viewed 333 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro Rail
  • Updated On: June 27 2023
  • Cost: Rs. 11,000.00 Crores

Location of the project

  • CityMumbai Suburban
  • StateMaharashtra
  • CountryIndia

Project Details

  • CIDCO has been exploring the viability of various alternative Mass Transit System which should be efficient, economically viable, environmentally friendly, etc. In this respect, feasibility study was carried out by M/s Delhi Metro Rail Corporation. The study recommended rail based MRT Corridor of Belapur-Kharghar-Taloja- Pendhar- Kalamboli- Khandeshwar as potentially developable corridor. It is further decided to take up Metro Rail Project from Belapur to Pendhar in the 1st Phase, Kalamboli to Khandeshwar as 2nd Phase and interlink between Pendhar and Kalamboli in 3rd Phase for implementation under Tramways Act, 1886. The present scope of the project is Execution of Metro rail from Belapur to Pendhar, (Line No. 1) under Package-I for the construction of Elevated Viaduct [civil] of 10.79 km length, Package-II for 11 nos. Stations of 140 M. each - Civil and Package III – For Balance Works which includes – Traction, Signaling, Electrification, Communication, Rolling Stock and Operation & Maintenance etc. [Total approx. cost of all three packages is Rs. 2,000 crores]. April 2011, Bids are invited for the project.: The project envisages design and construction of six nos. of elevated metro stations at Central Park of Kharghar, Pethapada, Sector-34 of Kharghar, Panchnand and Terminal Station at Pendhar for Navi Mumbai Metro Line-1 Project. Jan 2014: Ansaldo, an international transportation company, has emerged as the lowest bidder for carrying out systems work of Navi Mumbai's first Metro railway project. Work for the first phase of the Metro connecting Belapur to Pendhar will be completed by Dec 2014. Around 55% of project work is completed. July 2014: The first phase of Belapur CBD to Khandeshwar Metro project is now expected to begin operations only by 2017. The project deadline in 2014 is extended as the implementing body, Cidco, has decided to increase the width of the coaches so as to align with the Mumbai Metro. July 2014: J. Kumar Infraprojects secured an order for Rs. 67.99 crore for design and construction of Depot approach viaduct for Navi Mumbai Metro Line 1. Aug 2014: CIDCO plans to expand the proposed Belapur-Khandeshwar metro service up to Kalyan and Ulhasnagar to improve the connectivity between these suburbs and Navi Mumbai. July 2016: RITES is currently working on a Detailed Project Report (DPR) for extending the Navi Mumbai Metro line to connect with the proposed airport. The DPR is expected to be ready within two months and the construction work will start soon. At present, 90 percent of the civil works on viaducts has been completed in the first phase of the operations on the 11 km stretch from Belapur to Pendhar; while 60 percent station work has been completed and 60 percent work on the depot at Taloja is ready. Around 11 stations have been planned in the first phase of the Navi Mumbai Metro line. The extended lines of the Navi Mumbai metro line have been divided into phases. The second phase has been planned from Pendhar to Taloja; the third phase from Taloja to Khadeshwar and from Khadeshwar to NMIA. Once the DPR of the extended line is submitted by RITES, around five stations will be added to the existing 11 stations in the first phase of the metro line. Jan 2017: Navi Mumbai Metro Phase-I is expected to be completed in December 2017. Around 65 percent of work… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares