Bangalore Metro Rail project Phase II.

This Project Viewed 386 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro Rail
  • Updated On: January 17 2026
  • Cost: Rs. 32,000 crore

Location of the project

  • CityBangalore
  • StateKarnataka
  • CountryIndia

Project Details

  • The second phase of Bangalore Metro will have a distance of 80 km and the cost is likely to be around Rs 18,000 crore. The Bangalore Metro Rail Corporation Limited (BMRCL) is presently awaiting the submission of a detailed project report (DPR) from its consultant. The DPR for the second phase of Bangalore Metro is presently under preparation by the Delhi Metro Rail Corporation Limited (DMRCL). They are expected to submit the report in the next two months. The BMRCL, as part of the second phase, is planning to take up the work between Byappanahalli, and Electronics City and Whitefield. These two lines are the busiest routes presently and connect the city centre with the IT hubs. The draft of the detailed project report under preparation by DMRCL is almost ready and they are waiting for some technical issues to be addressed like alignment at Whitefield. Once that is sorted out, the report will be submitted to the government. Jan 2014: The Union Cabinet approved the phase II of the Bangalore Metro Rail Project. May 2014: The tendering for 72 km phase II of the project would begin soon. Apr 2015: IL&FS Engineering and Construction Company Ltd. has bagged a Rs. 326.99-crore rail contract for construction of elevated structures (viaduct) of about 3.9 km length from Mysore road station to Pattanagere station, including four elevated metro stations in the west extension of the East-West Corridor of Bangalore metro rail project, phase-2. Aug 2015: Land acquisition is underway which will be completed by April 2016. Jan 2016: BMRCL is planning to raise Rs. 12,000 crore to fund the second phase of the metro project. May 2016 : The BMRCL, which missed several deadlines to complete the first phase, is confident that the second phase will be fully ready by December 2020. The second phase is estimated to cost Rs 26,405.14 crore. Phase 2, spread over 72.09 km, will have 61 stations, including 12 underground. Dec 2016: BMRCL has invited bids for construction of elevated structures (viaduct & stations) of length approx 8.039 km from Baiyappanahalli station (excl) to Visvesvaraya Industrial Area Station (incl) (Chainage 18,603.879 mtr to 26,643.032 mtr) including road widening & allied work and six numbers of elevated metro stations viz., Jyothipuram, K.R. Puram, Mahadevapura, Garudacharpalya, Doddanakundi Industrial Area, Visvesvaraya Industrial Area in the Extension of East side of E-W Corridor of Bangalore Metro Rail Project, Phase-II. Mar 2017: The 17-km stretch will be implemented under Metro Phase II (A). Work on 72-km Metro Phase II has started. BMRCL has invited bids for construction of elevated structures in Reach-6 line of the Bangalore metro rail project, Phase-II. June 2017: Phase-II of the Namma Metro project is under implementation. Oct 2017: The Government of India and European Investment Bank (EIB) have inked a finance contract for lending of EUR 300 million for Bangalore Metro Rail Project Phase-II Line R6. Nov 2017: The AIIB funding is for the Nagawara-Gottigere line of 21.25 km (Reach 6). This stretch will entail an investment of Rs 11,014 crore out of the Rs 26,405 crore project. Dec 2017: Bids are invited for design, supply, installation, testing and commissioning of ballastless track of standard gauge in elevated viaduct section and underground section, along with ballasted track in depots for Phase-II Aug 2018 : As of July Work on project is expected to be completed by end of 2022. Phase II is expected to have a daily ridership of 20 lakh people, and metro currently has a daily ridership of under 4 lakh. Oct 2018: The estimated cost of Bengaluru’s namma Metro Phase-II has been revised to Rs 32,000 crore. The Kengeri line (Reach 2 extension) and BIEC line (Reach 3 extension) will be completed by 2020 and the remaining works will be completed in 2021. Jan 2019: BMRCL has floated two separate tenders for Length 4.591 km (approx) from South of Tannery Road Station to North Ramp (ch 16822.521 mtr to 21413.298 mtr), including allied works and four UG metro stations (Reach-6 line). The work will entail an investment of Rs 1,549.42 crore. Length 3.655 km (approx) from South Ramp (including) to Vellara Junction Station (excluding) (ch 7521.162 mtr to 111.76.615 mtr), including allied works and three UG metro stations (Reach-6 line). The work will be carried out at a cost of Rs 1,262.33 crore. Feb 2019: BMRC has invited bids for construction of Metro rail depot structures, site development works, internal roads and drainage works in the Depot Area at Hebbagodi in Reach-5 line in the Bangalore Metro Rail Project (Phase-2) in Karnataka. Alstom has been awarded a contract by the BMRCL for providing power supply and traction electrification for Bangalore Metro Project under Phase-II. The work will be implemented on 33 km extension to Bangalore Metro under Phase-II. The work will entail an investment of EUR 71 million. Mar 2019: Larsen & Toubro (L&T) Construction has secured large contract for Package-2 and Package-3 of Metro Rail project Phase-2 from the Bangalore Metro Rail Corporation. June 2019: BMRCL will get a long-term loan of Rs. 2,300 crore (USD (335 million) from the Asian Infrastructure Investment Bank (AIIB) for Namma Metro Phase-II project. Aug 2019: Johnson Lifts has bagged contract to provide 225 escalators for Phase-II project of Bengaluru Metro Rail valued at Rs 210 crore. Sept 2019: BMRC announced lowest (L1) bidders for two major civil contract package RT-01 and RT-04 of Phase-II of Bangalore Metro Rail Project. After the opening of financial bids, Afcons Infrastructure and ITD Cementation India emerged as the lowest bidders (L1). Afcons Infrastructure emerged as the L1 bidder among four other bidders namely L&T Construction, ITD Cementation India, Patel-SMU JV and HCC-GULERMARK JV. However, Patel-SMU JV and HCC-GULERMARK JV were found disqualified in the technical bid. Oct 2019: Vascon Engineers has received letter of acceptance (LoA) construction of Metro rail depot structures, site development works, internal roads & drainage works in Depot Area at Kadugodi in Reach-1 extension of line of Bangalore Metro Rail Project, Phase-2. Nov 2019: ITD Cementation has received letter of award (LoA) for design and construction of underground structures (tunnels and four stations) of length 4.591 km from South of Tannery Road Station to North Ramp, including allied works in Reach-6 Line. Feb 2020 ; Bid invited for architectural work of phase 2 of Bangalore Metro Rail project and is expected to be ready in sections, only by 2024. Mar 2020: The Bangalore Metro Rail Corporation has invited bids for engineering, supply, erection, testing and commissioning of 33 kV distribution, 750 V DC third rail traction electrification including traction substations, auxiliary substations and SCADA system for Reach-5 and -6 (Phase-II) in Bengaluru district of Karnataka. May 2020: The underground section of Gottigere-Nagawara corridor is under progress. The Bangalore Metro Rail Corporation has invited bids for architectural finishing works and public health engineering works for 10 stations of Reach-5 (P1 & P2) namely Bommasandra, Hebbagodi, Huskur Road, Electronic City-I, Hosa Road, Basapura Road, Chikkabegur, Muneshwara Nagar, Oxford College, and HSR Layout. The estimated value of the project is Rs. 102.06 crore. Jul 2020: Construction of elevated structures (viaduct & stations) of length 15.011 km from Ch 21,500.000 mtr to 36,511.000 mtr and two elevated metro stations viz, Bettahalasuru & Doddajala including road widening utility diversion and allied works of Bengaluru Metro Rail Project Phase-2B. This length includes appoximately 718.18 mtr cut and cover portion in front of Yelahanka Air Force Station entailing an investment of Rs 620.88 crore. Construction of elevated structures (viaduct & stations) of length 11,678 km from Ch 10,072.00 mtr to 21,500.000 mtr & five elevated metro stations viz, Hebbal, Kodigehalli, Jakkur Cross, Yelahanka & Bagalur Cross including 250 mtrs, pocket track, road widening, utility diversion and allied works of Bengaluru Metro Rail Project (Phase 2B/P2/69(b)) for a cost of Rs 645.3 crore. Construction of elevated structures (viaduct & stations) of length 11.003 km (including 281.000 mtr of viaduct beyond Phase-2A) from Ch 0.000 mtr to 10,072.000 mtr and eight elevated metro stations viz, Kasturi Nagar, Horamavu, HRBR Layout, Kalyan Nagar, HBR Layout, Nagawara, Veerannapalya and Kempapura including 650.00 mtrs link line connectivity to Baiyappanahalli, road widening, utility diversion and lied works of Bengaluru Metro Rail Project (Phase 2B/P1/69(a) for a cost of Rs 639.95 crore. Oct 2020: The Biocon Foundation entered a memorandum of understanding with the Bengaluru Metro Rail Corporation (BMRCL) on 8 October 2020 to fund Rs 65 crore for construction of Hebbagodi Metro Station on Hosur Road in Bengaluru, Karnataka. Around 95 percent of civil work between Seetharampalya and Whitefield has been completed till October 2020. Nov 2020: Land acquisition hurdles between Byappanahalli and KR Puram are delaying the Byappanahalli-Whitefield corridor. Metro work on the Seetharampalya (Visvesvaraya Industrial Area)-Whitefield section is progressing fast. Jan 2021: Salasar Adorus Infra has entered into a work contract with Texmaco Rail and Engineering. The contract is for carrying out a portion of work of design, supply, installation, testing and commissioning of ballastless track of standard gauge in elevated viaduct section and underground section along with blasted track in depots for the Bangalore Metro Corporation Rail project. The value of the contract is approximately Rs. 252 crore. Jan 2021: Minister of State (I/C), Ministry of Housing and Urban Affairs, Hardeep Singh Puri; Union Minister for Chemicals and Fertilizers D V Sadananda Gowda; and Chief Minister of Karnataka, B S Yediyurappa, inaugurated six-km long southern extension line under Phase-2 of Namma Metro from Yelachenahalli to Silk Institute Metro stations by flagging off the train on 14 January 2021. Feb 2021: Union Minister of Finance Nirmala Sitharaman announced an allocation of Rs 14,788 crore for Phase-II of the Namma Metro project in Union Budget 2021-22. Mar 2021: Godrej Interio has secured contract for 12 stations for Bengaluru Reach 3 and Reach 5 connecting HSR Layout to Bommasandra. The scope of work includes carrying out civil finishes, cladding, block works, facade glazing, metal ceiling, aluminium louvers, structural steel works, plumbing, railing, horticulture. JICA has signed an agreement with the Government of India, to provide Japanese (ODA) loan amounting to Japanese Yen 52,036 million(approximately ₹3,717 crore) for the development of Phase 2 of ‘R6, 2A and 2B’ of Bangalore Metro Rail Corporation Limited (BMRCL)in Bengaluru. Apr 2021: The Central government has approved Phase-2 of Bangalore Metro Rail Project in the state of Karnataka. May 2021: The Metropolitan Planning Committee (MPC) has approved Bangalore Metro Rail Project Phase-2A from Central Silk Board Junction to K R Puram and Phase-2B from K R Puram to Kempegowda Airport via Hebbal Junction of total length 58.19 km. Afcons Infrastructure and Shankaranarayana Constructions have won contracts for the construction of elevated 18.3 km long Phase-2A corridor stretch of Bangalore Metro connecting Central Silkboard to K.R. Puram with 13 stations running along the Outer Ring Road. July 2021: Namma Metro in Bengaluru is likely to begin commercial operations on the extended Purple Line on Mysuru Road in August 2021. Aug 2021: G R Infraprojects has received letter of… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares