Chennai Metro Rail project phase -II.

This Project Viewed 278 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: metro rail
  • Updated On: June 26 2026
  • Cost: Rs. 85,047.00 Crores

Location of the project

  • CityChennai
  • StateTamil Nadu
  • CountryIndia

Project Details

  • Chennai Metro Rail Limited's Phase II, historically listed at approximately ₹85,047 crore, reached a major commissioning milestone on 11 October 2026: the approximately 15 km Poonamallee–Vadapalani section opened with 11 elevated stations, a 3.7 km double-decker section and driverless-capable signalling. The reported ₹4,900 crore is this segment's cost, not new overall programme capex. Remaining civil, systems, integration, station fit-out and maintenance packages may offer procurement opportunities. Jakson emerged as the L1 by Chennai Metro Rail with a bid value quoted at Rs. 201.50 crore. Sep 2024: Twin tunnels to operate driverless metro trains from Venugopal Nagar to Kellys section are likely to be ready by December, 2026. The 18-km stretch, constructed by Tata Projects, is part of the 45.4 km Madhavaram Milk Colony Siruseri Sipcot Corridor-3 of the 116.1 km phase-II of Chennai Metro Rail. A 7.5 km tunnel was completed and seven tunnel boring machines are at work between Venugopal Nagar and Kellys. In terms of progress, more than 60 percent of work including diaphragm walls of three stations is completed and work on the fourth is nearing completion. six months to complete other work and the project. The stretch where tunnels have been built includes Venugopal Nagar to Madhavaram Milk Colony, Madhavaram Milk Colony to Madhavaram High Road, Aynavaram to Otteri and Aynavaram to Perambur. While TBMs are being operated between Madhavaram High Road and Moolakadai, tunnelling from Purasaiwalkam shopping hub to Kellys will begin in two weeks. Oct 2024: The Union Cabinet has given its nod to Chennai Metro rail project phase-II which comprises 3 corridors spread over 118.9 km with 128 stations. As per the update, the cost of the work is Rs.63,246 crore and is planned to be completed by 2027. 3 corridors include Madhavaram to SIPCOT having a length of 45.8 km with 50 metro stations and Lighthouse to Poonamalle Bypass across 26.1 km with 30 stations. Once phase II is fully operational, Chennai city will have a total metro Rail network of 173 KM. Nov 2024: Tech support firm Aurionpro has bagged an order from Chennai Metro Rail Corporation Limited (CMRL) to deliver automated fare collection (AFC) systems for Phase II. The firm will implement a robust, secured, and seamless AFC system capable of handling high passenger volumes while improving operational efficiency and traveler convenience. Jan 2025: Jackson Limited has bagged an order worth Rs. 171 crore from Chennai Metro Rail Limited (CMRL). The order comes with a completion deadline of 39 months from the date of award as per the details. The scope of the work involves Supply, Installation, Testing, Commissioning, and Training of Electrical, Plumbing, Fire Protection, VAC Works & BMS Systems from Madhavaram Milk Colony Station (Excluding) CH – 76.000 to Grain Market Station (Excluding) CH - 16399.716 for 6 Nos. Underground Stations and 10 Nos. Elevated Stations, Bored Tunnel, Cut & Cover Tunnel, U Section, Elevated Ramp, Elevated Viaduct in Corridor-5 of Chennai Metro Rail Project Phase-II. Feb 2025: The Chennai Metro Rail’s Phase-II project, spanning 118.9 km and costing Rs 63,246 crore, has achieved 40.41 percent physical progress and 32.74 percent financial progress. Apr 2025: Four companies have submitted bids for Chennai Metro Line-4’s underground electrical and mechanical (E&M), plumbing, and fire protection systems contract after Chennai Metro Rail (CMRL) opened the technical bids. The firms that have submitted bids for this specialised contract include Blue Star, IRCON International, Jakson, and Universal MEP Projects & Engineering Services, a subsidiary of Voltas.. June 2025: Chennai Metro Rail Limited (CMRL) has successfully erected the country’s first-ever 33.33-metre-long U-Girder at Ramapuram as part of Phase 2, Corridor 5 (ECV-02). This is the first such achievement in the history of Indian metro rail projects. The work was carried out in collaboration with General Consultant AEON and contractor Larsen & Toubro (L&T). Weighing 225 metric tonnes, this pioneering girder represents a significant engineering milestone and highlights the technical prowess, innovation, and execution capabilities of the project team. The erection was completed over… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares