Search Tips

Kolkta East West Metro Rail and Project: Foundation stone laid

This Project Viewed 157 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro Rail
  • Updated On: April 13 2022
  • Cost: Rs. 4,676.00 Crores

Location of the project

  • City-
  • State-
  • CountryIndia

Project Details

  • The project involves, * East-West Line will have passenger integration: 1. With Existing North - South Metro line at Central Station. 2. With Suburban & long distance Rail services at Howrah & Sealdah Major Stations. 3. With Bus Depot at Howrah and Sealdah Stations 4. With Ferry services at Howrah. 5. With Karunamoyee International Bus Terminal at Salt Lake City. * There are already adequate terminal facilities (Parking etc.) as well as modal integration for different modes of public transportation like Bus, Taxi, Auto Rickshaw etc. at Howrah & Sealdah Major Railway Stations. * In Mahakaran Station,(CBD Area of kolkata) where a large number of commuters will be traveling every day. It is proposed that the SPV would run a shuttle bus operation all along the corridors of B.B.D. Bag, from this station on regular intervals, say every 15 minutes on free of cost basis. * Similar bus facilities will be given at the three elevated stations at Salt Lake- City Centre, Central Park and Karunamoyee stations. In Marhc 2011, Project management, design, installation and commissioning work, plus personnel training and maintenance throughout the three-year warranty period in Kolkatta. ( Siemens awarded) In the first phase, KMC will dig two tunnels, one each for the up and down lines. This will start from Subhash Sarobar and terminate at the existing Central Station. Afcons-Transtonnelstroy is constructing the underwater tunnel between Howrah Maidan and the proposed Mahakaran metro station near Writers Building. The length of the section will be 1.7 km from Howrah Maidan to the Ganga bank. May 2017: The entire project is 16.6 km long, out of which 10.8 km runs under the ground. Of this 10.8 km, 502 metres is under the water. The project connects Howrah to the west and Salt lake to the east. The boring of tunnel under the Hooghly river for establishing metro link between Howrah and Kolkata has been completed.… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Not Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares