Search Tips

Chenab Valley is implementing the Pakal Dul reservoir based Hydel Project

This Project Viewed 199 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Energy > Storage > Generation > Non-Conventional > Hydel
  • Status: ******
  • Capacity: ******
  • Product: Hydel power
  • Updated On: November 13 2026
  • Cost: Rs. 9,000.00 Crores

Location of the project

  • CityDoda
  • StateJammu & Kashmir
  • CountryIndia

Project Details

  • Chenab Valley Power Projects plans to implement the 1,000 MW (4x250 MW) Pakal Dul reservoir based Hydel Project on river Marusudar, the main right bank tributary of river Chenab in Kishtwar Tehsil of Doda District in Jammu & Kashmir on BOOT basis. The Project envisages construction of a concrete face rockfill dam across river Marusudar at village Drangdhuran and an underground Powerhouse at a location 2 km u/s of Dul dam, near village Trimuli. At Full Reservoir Level (EL1700 M), the gross storage of the reservoir is 125.4 Mcm. As per the agreement signed between the "Union and State governments, NHPC will construct and operate the power project and transfer it to the State government after recovering the investment. The project envisages an investment of Rs. 3,480.14 crore. J&K will been titled to receive 12 per cent of the generated power free of cost and an additional 15% from Centres unallocated share to meet the winter peak demand. The project will be implemented by New Joint venture formed by Jammu & Kashmir State Power Development Corporation (JKSPDC) and NHPC which will own 49 per cent stake each and remaining shareholding will be with PTC India. Nov 2013 : The project will have in its design the hydro-mechanical works such as diversion tunnel gate, spillway radial gates, fixed wheel vertical gate, Intake gates, Trash rack, Pressure Shaft steel liner and TRT gates. Feb 2014: The request for proposal for the project was floated in 2011. Patel Engineering has emerged as the lowest bidder among four bidders. Sept 2014: Cabinet clears Rs. 8,112.12 crore investment for h Pakal Dul reservoir based Hydel Project. Dec 2016: Project have obtained all statutory clearances such as accord of appraisal by CEA, forest clearance by the government of J&K and environment clearance by MOEF&CC, and the tendering is in process. Construction work on the project is likely to commence in 2017.… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares