New Garia-airport metro link project.

This Project Viewed 157 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: metro link
  • Updated On: August 29 2023
  • Cost:

Location of the project

  • CityColachel
  • StateWest Bengal
  • CountryIndia

Project Details

  • Kolkatta Metro Rail is planning a 32-km New Garia to Airport metro link in Kolkata. The project proposed to be completed in 2015, this is the longest metro link in the city. The Rs 3,951-crore project will connect Kolkata airport in the North to New Garia in the South. Kolkata currently has one metro line running. Two more lines – Airport-Howrah and Joka-BBD bag – are under construction. Of the five legs of New Garia to Airport stretch, contracts were awarded for four legs covering an estimated 25 km. These contracts have been awarded to three infrastructure companies – Afcons Infrastructure Ltd, L&T and Gammon India. Contracts for the last 4 km of the line connecting airport is pending as AAI is yet to approve the plan. The railway had already revised the route plan from an elevated stretch to underground line to suit the requirements of Kolkata airport. Mar 2014: IL&FS Engineering and Construction Company Limited has been awarded a Rs. 299.76-crore contract by Rail Vikas Nigam Ltd., Kolkata. This entails construction of seven elevated metro stations from Sub CBD-1 to Titumir in the New Garia-Airport Metro Corridor of Kolkata Metro Line in West Bengal. Apr 2018: Rail Vikas Nigam has floated tenders for construction of viaduct including related works for 2.025 km length from Ch 15442.610 to 17027.740 between WBSETCL substation, Salt Lake (P429) to Mahisbathan Bridge (CP481) (near NKDA office), P575 to P579 and P650 to CPP667 excluding station areas in new Garia-Airport Corridor of Kolkata Metro Railway Line. July 2019: Rail Vikas Nigam has floated tender for construction of seven stations from SUBCBD-1 to Titumir, including all related works (architectural, electrical and mechanical (E&M), heating, ventilation and air-conditioning (HVAC), fire detection and fire suppression system and public health engineering (PHE) works) of New Garia-Airport Metro Project, Kolkata. The work will entail an investment of Rs 239.32 crore. Feb 2020 : The New Garia-NSCBI Airport link, slated to be completed by June 2021 June 2020 : In May Rail Vikas Nigam Limited and Kolkata Metro Rail Corporation Limited have been granted permission to resume work on the New Garia-Airport Metro link. Jul 2020: The Railway Board has approved Rs 527 crore worth funds for Kolkata Metro’s longest corridor ‘New Garia-Airport’. The funds have been approved for modified alignment of its last 3.6 km stretch from City Centre-II to the Airport. The tender for the work will be opened on 30 July 2020. Oct 2020: Rail Vikas Nigam has floated tenders for Kolkata Metro Railway under two packages. Engineering, supply, erection, testing and commissioning of 33 kV power distribution, traction substation, auxiliary substations and 750 V DC… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Not Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares