Search Tips

Mumbai Trans Harbour Link project.

This Project Viewed 321 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Roadways > Road/Highway
  • Status: ******
  • Capacity: ******
  • Product: Road Highway
  • Updated On: November 29 2023
  • Cost: Rs. 17,843 Crores

Location of the project

  • CityMumbai
  • StateMaharashtra
  • CountryIndia

Project Details

  • The 22-km project will connect Sewri in the island city to Nhava in Navi Mumbai. The project will be implemented through public-private partnership on a design, build, finance, operate and transfer (DBFOT) basis. The phase-I of the project will comprise six-lane dual carriageway, which will link between Sewri in Mumbai and Nava-Sheva across the creek in Navi Mumbai. The phase-II, will consist of a double track rail link that will run parallel to the road link on the north side which is expected to be added in 2015 -18. Jan 2016: The Sewri-Nhava Sheva Mumbai Trans Harbour Link has finally got the approval from the Union Ministry of Environment and Forests (MoEF) granting the project an in-principle approval. Jan 2016: The ministry of environment and forest has accorded CRZ clearance to Mumbai Trans Harbour link project (MTHL). MMRDA invited RfQs for MTHL project on design-build basis on EPC in three separate packages. July 2016: The formal agreement for the Rs 15,000 crore loan will be signed between Japan and the state soon. Nov 2016: MMRDA has appointed consortium formed by AECOM Asia Co-DAR-Al-Handsah-T Y Lin International as a general consultant for the project. Dec 2016: On 24 December, 2016 Prime Minister Narendra Modi will lay foundation stone for Mumbai Transharbour link. Jan 2017: The shortlisted companies include Larsen & Toubro (L&T), Bridge Engineering Group Co, AFCONS Infrastructure, Simplex Infrastructures, etc. J. Kumar Infraprojects has been qualified for construction of a 3.813 km road. The companies qualified for the final stage of bidding have to submit the requests for proposal (RFP) by 5April, 2017. The contract is likely to be awarded by June 2017, and work on the same is expected to start by October 2017. The project is expected to be completed by 2019 end. May 2017: The bids date for the Mumbai Trans-Harbour link project has been extended to 5 June, 2017, from the earlier submission date of 5 April, 2017. MMRDA has received clearances to take over nearly 47 ha of mangrove land. MMRDA will soon begin with the compensatory afforestation on the Raigad side. sept 2017: Tata Projects Ltd. (TPL) has announced that its joint venture with Daewoo of Korea has been declared the lowest bidder in two packages of the Mumbai Trans Harbour Link (MTHL) project. Nov 2017: For the first package, L&T and IHI put in a bid of Rs 7,637 crore while the TPL-Daewoo placed a combine bid of Rs 5,612 crore. For the third package, L&T emerged the lowest bidder with a bid of Rs 1,013 crore. Dec 2017: MMRDA has signed the agreements with Larsen & Toubro (L&T) and Japan-based IHI Infrastructure Systems Co for 10.38 km Package-1. MMRDA entered into a separate agreement with L&T for 3.61 km Package-3. MMRDA will soon enter into an agreement for Package-2 of 7.807 km with Daewoo and Tata Projects. Feb 2018: The construction of the Mumbai Trans Harbour Link (MTHL) is likely to begin by end of February 2018 and will be open for public use by 2021. May 2018: The Mumbai Trans Harbour Link (MTHL) will have the longest steel deck spanning 180 mtr. The contractors have completed around 50 to 70 percent of soil testing, along the alignment, and… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares