Search Tips

Bhopal Metro Project phase I

This Project Viewed 193 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro Rail
  • Updated On: July 31 2025
  • Cost: Rs. 8,000.00 Crores

Location of the project

  • CityBhopal
  • StateMadhya Pradesh
  • CountryIndia

Project Details

  • The Bhopal Metro is a rapid transit proposed for the city of Bhopal, India. The total system consists of 3 corridors covering a distance of 28.5 km. This project will cost INR8,000 crore (US$1.51 billion) approximately. Three corridors have been proposed by DMRC. Kapil Nagar to Habibganj (10.5 km, 10 stations) Suruchi Nagar to BHEL (9km, 9 stations) Lalghati to Platinum Plaza (9km, 9 stations) DPR would be prepared in next six-seven months and the Centre and the state will bear its cost in the ratio of 50:50. The urban administration department will float a tender to select a company for preparing the DPR In October 2012: Center approves for the preparation of DPR August 2018: Dilip Buildcon Ltd (DBL) has been declared L-1 bidder for Bhopal Metro rail project, Phase -I, valued at Rs. 247.06 Crore by the Urban Administration and Development Department Madhya Pradesh Metro Rail Co. Limited, Bhopal (M.P). The project is for Design and construction of Elevated Viaduct of length 6.225KM between AIIMS and Subhash Nagar (Excluding stations) including entry and exit to Depot for Bhopal Metro Rail Project Phase-1. The construction period of the project is 27 months. June 2019 : In May Asian Development Bank (ADB) gave in-principle approval to fund the Bhopal Metro project. and Union Government will stand as guarantor for the loan. Aug 2019: Madhya Pradesh Metro Rail Corporation (MPMRC) signed an MOU with the Central government for Metro Rail project in Bhopal. July 2020 : In May Bhopal Metro rail project — was on hold due to the nationwide lockdown over the COVID-19 pandemic is back on track. first phase of construction of the project is underway and Construction work has begun in three locations 30 percent workforce has been developed near AIIMS Bhopal, Subhash Nagar and the casting yard Kanhasaiyan, for girders and may start in further after 3 months. Oct 2020: A detailed survey report for the proposed Metro station and shopping complex near Roshanpura intersection is also likely to be submitted soon. Land acquisition process started for Bhopal Metro rail project. Nov 2021: The government of Madhya Pradesh has announced that the Bhopal Metro will start operating by September 2023. May 2022 : KEC International-SAM India JV has won the contract for the construction of Subhash Nagar Metro Depot. The firm is likely to commence groundwork in April 2022, the construction work of Depot involving an estimated cost of Rs. 323 crores.[27] Segment launching near Rani Kamlapati Railway station is continuing at a very slow pace. No concrete work yet visible for the construction of 8 metro stations in the priority corridor. June 2022: Gulermak–Kalpataru Power Transmission joint venture (JV) has been awarded 750 V DC third rail electrification contract of Bhopal Metro’s Phase-1. June 2023: Bids are invited for construction of thirteen elevated Metro rail stations and an elevated viaduct for the Bhopal Metro Rail Project. The scope of work includes part design and construction of the elevated viaduct, thirteen elevated Metro rail stations viz. Bhadbhada Chauraha, Depot Chauraha, Jawahar Chowk, Roshanpura Chauraha, Kushabhau Thakre Hall, Parade Ground, Prabhat Chauraha, Govindpura, Govindpura Industrial Area, JK Road, Indrapuri, Piplani and Ratnagiri Tiraha (excluding an elevated passenger Interchange Metro rail station), between ch 50+000 and 62+915, and access to depot between ch 00+155 and 01+100 for Blue Line for Bhopal Metro Rail Project. The project cost is Rs. 1,122 crore, and stipulates a completion period of 36 months. The bid submission due date is 20 July, 2023. Aug 2023: The elevated Package BH-03 of the 27.87 km Bhopal Metro Phase 1 project has received offers from 8 construction companies, when Madhya Pradesh Metro Rail Corporation Ltd. (MPMRCL) launched technical bids. This 5.34 km long civil package on the Orange Line of the Bhopal Metro is divided into two separate parts, with a total of six elevated stations situated on either side of the underground Package BH-04 (Sindhi Colony - AishBagh), for which bidding is now open. 1) Southern Section (approx. 1.62 km): Subhash Nagar Underpass Station to Aishbagh Ramp with 2 stations at PulBogda (interchange with 12.9 km Blue Line) and Aishbagh 2) Northern Section (approx. 3.72 km): Sindhi Colony Ramp to Karond with 4 stations at Sindhi Colony, DIG Bungalow, KrishiUpajMandi and Karond MPMRCL had invited tenders for Package BH-03’s construction in April 2023 with a Rs. 647.47 crore estimate and 1092 days (3 year) deadline. Sept 2023: Madhya Pradesh Metro Rail Co Ltd (MPMRCL) recently received their first Alstom Movia train-set for the… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares