2-phase Ahmedabad - Gandhinagar Metro rail project in Gujarat.

This Project Viewed 212 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro Rail
  • Updated On: January 12 2026
  • Cost: Rs. 5,500 crore

Location of the project

  • CityGandhinagar
  • StateGujarat
  • CountryIndia

Project Details

  • The project envisages planning of 2-phase Ahmedabad - Gandhinagar Metro rail project in Gujarat. The project comprises two corridors of total length of 28.254 km i.e. Corridor 1 from Motera Stadium to Mahatma Mandir for a length of 22.838 km and Corridor 2 from Gujarat National Law University to GIFT City for a length of 5.416 km. Feb 2019: The Union Cabinet chaired by Prime Minister Narendra Modi has approved implementation of Ahmedabad Metro Rail Project Phase-II. Aug 2019 ; Work on project is in planning stage. project is approved by the govt. Nov 2019: The construction for the Phase-II of the Metro rail project between Motera in Ahmedabad and Mahatma Mandir in Gandhinagar, Gujarat will begin in June 2020. Jan 2020: The Gujarat Metro Rail Corporation (GMRC) has floated tenders for Package-C1 and Package-C2 on Ahmedabad Metro Rail Project Phase-II in Gujarat. Oct 2020: In Sept Work orders for the stretch between Motera to Mahatma Mandir are likely to be issued shortly. On site work will begin in in December or by early 2021 and the entire work of Ahmedabad and Gandhinagar metro will be over by early 2024. Jan 2021: On 18 January 2021, Prime Minister Narendra Modi will lay the foundation stone for the Metro project’s Phase-II, connecting Ahmedabad with Gandhinagar and GIFT City. Prime Minister Narendra Modi on 18 January 2021 conducted bhoomi pujan of Ahmedabad Metro’s Phase-II. GMRC has in Phase-II decided to drop direct connectivity to the airport that was planned earlier. July 2021 : In June Gujarat Metro Rail Corporation (GMRC) Limited invites open RFP tenders under a single-stage, three packet system for the work of a selection of General Engineering Consultant for Phase-2 of Ahmedabad Metro Rail Project ,Last Date and time of submission of E-Tender – 19-07-2021 and Completion Period of work – 36 Months. Sept 2021: GIFT City at Gandhinagar in Gujarat will get metro rail connectivity under the ₹5,384 crore Phase-2 of the Ahmedabad Metro project destined to be completed in the next two years. Mar 2022 : The construction of the 28.25 km long Phase-2 connecting Ahmedabad with Gandhinagar was started. May 2022: 10 firms / consortia have submitted bids to Gujarat Metro Rail Corporation (GMRC) for the construction of Ahmedabad Metro Phase 2 project’s 7.553 km Sector-1 – Mahatma Mandir section in Gandhinagar. Bidders are- Afcons Infrastructure Dilip Buildcon Ltd. (DBL) GR Infraprojects JMC Projects KEC – CVCC JV Kalthia – Ashoka Buildcon Ltd JV RVNL – DRA Infra JV Ranjit Buildcon Ltd. (RBL) URC Constructions (URCC) YFC – MCL JV The bids have now been sent for technical bid evaluation which can take a couple months to complete. The first 2 sections of Phase 2 are well under construction with both contractors commencing U-girder launching activity in Q4 2021 Sept 2022: Dilip Buildcon has emerged as the lowest (L1) bidder for Ahmedabad Metro Rail Project Phase- 2 for the tender floated by the Gujrat Metro Rail Corporation (CMRC). The scope of work includes construction of 7.553 km elevated viaduct and seven stations incl. E&M, architectural finishing, roofing, plumbing, signage, etc. from Sector- I to Mahatma Mandir (ch 31945.443 mtr to 39498.302 mtr, Package-C3) in connection with Ahmedabad Metro Rail Project Phase-2. The estimated value of the project is Rs. 723.45 crore with completion period of 24 months. Jan 2023: Siemens-RVNL JV was recently declared as the lowest bidder for the 750 V DC Third Rail electrification system (EP-2) of the Ahmedabad Metro Phase 2 project. Mar 2023: Ranjit Buildcon Ltd. (RBL) recently launched the first pair of 27.90m long U-girders for Ahmedabad Metro Phase 2 project‘s Package C3 connecting Sector-1 – Mahatma Mandir in Gandhinagar. Aug 2023: On 29 August, 2023, Titagarh Rail Systems (TRSL) received a letter of acceptance (LoA) from the Gujarat Metro Rail Corporation (GMRC) to supply 30 standard gauge cars for the Ahmedabad Metro Rail Phase-II project. On 29 August, 2023, Titagarh Rail Systems (TRSL) received a letter of acceptance (LoA) from the Gujarat Metro Rail Corporation (GMRC) to supply 30 standard gauge cars for the Ahmedabad Metro Rail Phase-II project. Oct 2023: Ranjit Buildcon Ltd. (RBL) recently celebrated the launch of their final of 354 U-girders for civil Package C2 of the 28.254 km Ahmedabad Metro Phase 2 project. Dec 2023: Afcons Infrastructure, the construction contractor for Ahmedabad Metro Phase 2, has reached a significant milestone by launching the last precast box segment for the Sabarmati River Bridge near Gandhinagar. The bridge, a crucial part of Phase 2's Package C1, spans approximately 810 meters and… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Not Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares