Colaba-Bandra-Seepz Mumbai Metro 3 project.

This Project Viewed 427 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro 3
  • Updated On: October 08 2025
  • Cost: Rs. 33,406 crore

Location of the project

  • City-
  • StateMaharashtra
  • CountryIndia

Project Details

  • The Mumbai Metropolitan Region Development Authority (MMRDA), is to construct line-3 of 'Colaba-Bandra-Seepz'. This will be 34 long under ground line on BOOT basis. Foundation stone for the project will be laid on August 26 in the presence of Maharashtra chief minister Prithviraj Chavan, union minister of urban development M Venkaiah Naidu. Sept 2014: MMRC has finalised a list of nine consortia eligible for financial bidding. The MMRC will issue Requests for Proposals (RFP) to the nine pre-qualified firms soon. Dec 2014: The consortium, led by Hong Kong's AECOM Asia, includes other companies such as Japan's Padeco, US-based Louis Berger Group and France's Egis Rail. Feb 2015: The construction work on the project is likely to start by March 2016. The land acquisition for the project is at an advanced stage of completion. May 2015: Nine consortiums have bid for the project. The nine consortiums are Afcons Infrastructure -Kyivmetrobud, Continental Engineering Corporation-ITD Cementation India-Tata Projects, DOGUS-SOMA, IL&FS Engineering and Construction Company-China Railway 25th Bureau Group, J Kumar Infraprojects-China Railway No.3 Engineering GroupL&T-Shanghai Tunnel Engineering, OSJC Moscow Metrostroy-Hindustan Construction, Pratibha Industries-Guandong Yuantian Engineering and Unity Infraprojects-IVRCL-China Railway Tunnel Group. Oct 2015: Mumbai Metro Rail Corporation (MMRDC) has received 31 bids from nine consortiums for the metro project. The L1 bidders include L&T-Shanghai Tunnel Engineering, HCC-OSJC, J Kumar-China Railway No 3 Engineering Group, Continental Engineering-ITD and DOGUS-Soma. Feb 2016: The Colaba-Bandra-Seepz Metro-3 project has received approval from Airport Economic Regulatory Authority for the construction of two stations on the Metro-3 corridor. Maharashtra Govt will hand over three hectares of land at Aarey Colony for Metro-III car shed. May 2016: Work on the project is likely to commence soon. July 2016 : The joint venture of J Kumar Infra and CRTG has received a worl order from Mumbai Metro Rail Corporation worth Rs 5012 crore contract of Mumbai metro line 3. MMRC is speeding up land acquisition Sep 2018: MMRC will complete the first tunnel of underground Metro-3 corridor (Colaba-Bandra-SEEPZ) by 23 September 2018. Dec 2018: A Tunnel Boring Machine (TBM) deployed at the Colaba-Bandra-SEEPZ Metro-3 corridor achieved a breakthrough, making it the second TBM to reach the milestone. Feb 2019: The MMRC has completed 20 km i.e. 38 percent of the total tunnelling work of the fully underground Metro-3. MMRC has completed 35 percent of the overall civil work. Apr 2019: MMRCL has completed 45 percent tunneling work on Metro-3. June 2019: MMRC has completed 50 percent of the total tunnelling work. The remaining 28 km of the tunneling will be completed before June 2020. Aug 2019: MMRCL has awarded the contract for the tunnel ventilation system and environmental control system works to Voltas. The work awarded is for the section Mumbai Central (excluding) to Cuffe Parade (including) for its Colaba-Bandra-SEEPZ Metro-3 corridor. Nov 2019: MMRCL has commenced work on subway which will connect Mantralaya, Vidhan Bhavan and the new administrative building to Metro-3 (Colaba-Bandra-Seepz) station at Nariman Point. The MMRC has achieved 70 percent tunneling work for Colaba-Bandra-Seepz Metro-3 Corridor. Dec 2019: MMRC has completed 100 percent tunnelling for Mumbai Metro 3 Package-7 (Colaba-Bandra-SEEPZ) corridor. Jan 2020: The Corporation expects to complete 70 per cent of civil work and get the first rolling stock by December 2020. MMRC has achieved 100 percent excavation on 13 of 26 underground stations on Mumbai Metro-3 corridor. As of January 2020, 52.15 percent work on the underground station at Cuffe Parade. Feb 2020: MMRC has completed tunnelling below the main Mithi channel for Mumbai Metro-3. By the end of March 2020, the twin tunnels will be ready across the entire 1.2 km wide river. Mar 2020: Cuffe Parade underground station part of Metro 3 (Colaba-Bandra-Seepz) project in Mumbai, Maharashtra, will have a pay-and-park facility for 192 cars. MMRCL due to Corona virus pandemic is only carrying out unavoidable activities, especially at tunnelling sites, such as monitoring of buildings and ground operations of tunnel boring machines in slow mode. Japan International Cooperation Agency (JICA) has signed an agreement with the Government of India to provide an Official Development Assistance (ODA) loan. Mumbai Metro Line-3 Project (III) has been extended the balance Rs. 2,480 crore. Work on the project has recommenced. Aug 2020: Blue Star has bagged an order valued at Rs 149 crore for electrical and mechanical works for Mumbai Metro Line III from Dogus-Soma joint venture (JV). The order has been bagged for Package UGC-03 for five underground stations — Mumbai Central, Mahalaxmi, Science Museum, Acharya Atre Chowk and Worli. Feb 2021 ; Mumbai's Colaba-Bandra-SEEPZ Metro-3 to be ready by December 2021. The MMRC has also reduced the length of the phase-1 corridor. June 2021: The cost of the underground Mumbai Metro 3 project has escalated by over Rs 10,000 crore to Rs 33,406 crore from the original estimate of Rs 23,136 crore. Dec 2021 ; Work on project is under construction. Trial runs of prototype rakes for the underground Metro 3 corridor (Colaba-Bandra-Seepz) are being planned for early next year. Jan 2022 : Around 97% of tunnelling and 82% of civil work has been completed for availability of more than 16,000 worker so far. Mar 2022: The first train of the 32-km-long Colaba-Seepz underground Metro-3 corridor is expected to arrive in the city by March end. Maharashtra government has sanctioned Rs 250 crore for Metro Line-3 project. Apr 2022: Mumbai Metro Colaba-SEEPZ Line-3 may take another two to two-and-a-half years to be completed. Various works, including some part of the tunnel boring work as well construction of stations other than the depot, are still pending. July 2022: MMRC has targeted opening Phase-I of the Metro 3 Corridor between Aarey and BKC by December 2023. Aug 2022: Trial runs of the first prototype train arrived for Metro 3 (Colaba-Bandra-Seepz) underground corridor is likely to begin from 15 August 2022. Sept 2022: Nine rakes required to commence Phase-I services (Aarey-BKC) will be brought by June 2023. Jan 2023: The job of tunneling this 33.5 km line was completed 100 per cent. MMRC is likely to commission the first phase of Metro 3 by the end of 2023. June 2023:State Cabinet has given the nod to the handing over of 33,000 sq. ft. land in Dharavi locality of Mumbai to the Mumbai Metro Rail Corporation (MMRCL) for ancillary activities. The underground station is at the T-junction between Dharavi and the road bridge connecting it to the Bandra-Kurla Complex. The plot was initially given over to the Mumbai Metropolitan Region Development Authority (MMRDA), which then handed it over to MMRCL, for the construction of the Dharavi Metro station, as part of the 33-km underground Metro Line-3 extending from Aarey Colony to Cuffe Parade in Mumbai. MMRCL has constructed an electric substation on the plot as well as various other ancillaries. Dharavi is set to be redeveloped as an integrated township, and the Metro station would serve as an important mass transit for the area. Oct 2023: Tunneling works on 33.5 km Mumbai Metro Aqua… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares