Vizag Refinery-cum-petrochemical complex project.

This Project Viewed 416 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Energy > Oil & Gas > Refinery
  • Status: ******
  • Capacity: ******
  • Product: refinery
  • Updated On: September 27 2022
  • Cost: Rs. 40,000.00 Crores

Location of the project

  • CityVisakhapatnam
  • StateAndhra Pradesh
  • CountryIndia

Project Details

  • Hindustan Petroleum Corporation (HPCL) in partnership with France’s Total S.A., L.N. Mittal Group company, GAIL and Oil India is planning to build a refinery-cum-petrochemical plant at Visakhapatnam in Andhra Pradesh. The cost of the project is estimated to be about $10 billion. The consortium has acquired about 2,500 acres of land near HPCL’s existing 8.5-million tonnes refinery at Visakhapatnam. During April/May 2009, HPCL along with the consortium partners will examine the supply-demand balance and carry out techno-economic evaluation of this project. After the successfull completion of the techno-economic study, the consortium partners will agree to proceed with the next phase of FEED study of the project. The partners will award Front End Engineering and Design (FEED) contract only after establishing that there is a market for the products. The refinery is mainly developed to process sour and heavy crude, which are cheaper than low-sulphur sweet crude oil, the petrochemical plant may use the naphtha produced in the refinery as feedstock. The fuel produced by the refinery would be exported to markets in Southeast Asia and West Asia. The proposed export-oriented plant is likely to have a 350 mw captive power plant besides aromatics and olefin plants to produce value added products such as paraxylene and benzene in a phased manner.” The project is expected to be completed in five years. HPCL plans to procure utility boiler package for its existing refinery at Visakhapatnam in Andhra Pradesh. HPCL has therefore invited tenders from prospective companies for the above package. The selected entity’s scope of work envisages design, engineering, manufacturing, installation, testing, painting, packing, delivery at site, erection including all civil works like demolition, piling and foundation, proving mechanical and performance guarantee. The last date of submission of applications is 9 April 2010. In October 2010: IVRCL has bagged Piling works for pipe-racks and equipment foundations for diesel hydro-treater project at Visakh refinery in… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares