Amaravati (Vijayawada) Metro Rail.

This Project Viewed 374 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: metro rail
  • Updated On: December 05 2024
  • Cost: Rs. 20,000.00 Crores

Location of the project

  • CityKarwar
  • StateAndhra Pradesh
  • CountryIndia

Project Details

  • CRDA plans for Vijayawada Metro Rail. The DMRC has prepared the design for a 26-km stretch covering both Bandar and Eluru Roads, connecting key junctions. It has planned 21 stations, including one main station at Pandit Nehru Bus Station (PNBS). The authorities have also planned a metro coach depot at Nidamanuru. Apr 2015: DMRC has finalised the Detailed Project Report (DPR) for Vijayawada Metro Rail. The DPR envisages two corridors from the Pandit Nehru Bus Station (PNBS), one up to Penamaluru over MG Road and the other till Nidamanuru over Eluru Road. The works on the first phase is expected to begin by June 2015. Aug 2015 : Work on project is under-construction and scheduled to be completed in further 2018. Vijayawada Metro Rail is a proposed rapid transit system in the Indian city of Vijayawada. The system is proposed to reduce traffic congestion, and will consist of two corridors in phase-I which covers 26 km, one from to Pandit Nehru Bus Station via Mahatma Gandhi road and the other from Nidamanuru to Pandit Nehru Bus Station via BRTS road and Railway Station. A detailed project report is under progress. Aug 2015: 31.039 hectares of land would be required for the project -- 29.444 hectares of private land and 1.595 hectares of government land. Sept 2015: The NAD Junction-Gajuwaka corridor, which was originally proposed in the second phase but will now be taken up in the first, the total distance worked out to 42.5 km, and the cost to Rs. 12,725 crore. Nov 2015: The Amaravati Metro Rail Corporation (AMRC) has urged the government to take immediate measures for release of funds of Rs 500 crore to compensate the land-losers while commencing the process of land acquisition for construction of Corridor-2 rail project. Dec 2015: Amaravati Metro Rail Corporation has prepared a preliminary project report for bilateral financial cooperation with the help from the consultants Delhi Metro Rail Corporation. Feb 2016: The Vijayawada metro rail project is still awaiting clearances from the Ministry of Urban Development. Aug 2016 : The AMRC has decided to complete the construction of a station at Nidamanuru of Vijayawada rural mandal by February, 2019, to conduct first trail run of metro rail through Eluru road corridor. Nov 2016: DMRC has invited bids in design & construction of the elevated viaduct (Ch km (-) 0.155 to km 13.210), depot connection and thirteen elevated stations of Pandit Nehru Bus Stand-Nidamanuru Corridor. The estimated cost of the package is Rs. 969 crore. The second package includes design & construction of elevated viaduct (Ch km (-) 0.155 to km 12.390) & eleven elevated stations of… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Not Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares