Northern Railway is implementing Udhampur-Srinagar-Baramulla rail link project in Jammu & Kashmir

This Project Viewed 118 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Rail-road
  • Status: ******
  • Capacity: ******
  • Product: Railway
  • Updated On: June 07 2025
  • Cost:

Location of the project

  • CityJammu
  • StateJammu & Kashmir
  • CountryIndia

Project Details

  • Northern Railway is implementing the Udhampur-Srinagar- Baramulla rail link project in Jammu and Kashmir. July 2016: Hindustan Construction Company (HCC) has received a contract worth Rs 1749.59 crore from IRCON International to construct two tunnels and a bridge on Katra-Banihal section of Udhampur-Srinagar-Baramulla new BG railway line project. Oct 2016: Ircon International has invited bids for construction of the cable-stayed bridge including its approaches across Anji Khad river between Tunnel T2 and T3 on Katra-Banihal section of Udhampur Srinagar-Baramulla Rail Link Project in Jammu & Kashmir (PKG-BR-Anji Khad-BRIDGE). May 2017: Around two-thirds of the 326 km Jammu-Udhampur-Srinagar-Baramulla rail link is ready. Dec 2018 ; Work on project is under way. project is delay because of some technical issues. work on project is restart after 2 month. About two-thirds of the 326 km Jammu-Udhampur-Srinagar-Baramulla rail link is ready. the project remaining work is 111 km stretch between Katra in Jammu and Banihal to be completed in further 2020. June 2019: Ircon International has invited bids for design, supply, erection, testing and commissioning of electro mechanical (E&M) system which includes 33/11 kV and 11/0.433 kV GIS substations, 33 kV and 11 kV power cable network, DG sets, ventilation and control system, CCTV and PA system leaky cable, lighting, UPS system, fire fighting system and SCADA system, etc and associated works complete in all respect as required for Tunnel T-74R & T-77 on Dharam-Qazigund Section of USBRL project (Package T-74R & T-77). The estimated value of the project is Rs 368.34 crore. Aug 2019: Of the 272 km Udhampur-Baramulla rail line, nearly 111 km stretch between Katra and Banihal is incomplete. This stretch has around 97 km of tunnels and includes a 359 mtr high bridge on Chenab. Around 80 percent of the Chenab bridge is complete. Oct 2019: Work is in progress for the 53.6 km stretch of Udampur Srinagar Baramulla Rail Link (USBRL) project. Excavation work for 10.26 km tunnel has been completed. Dec 2019 : Udhampur-Baramulla railway line is likely to be completed by 2020 and expected to be completion by 2022. Mar 2020: The Konkan Railway Corporation has invited bids for provision of E&M system which includes supply, erection, testing and commissioning of 33 kV and 11 kV HT power cable network, GIS substation, DG sets, tunnel ventilation system, tunnel lighting, SCADA system and firefighting system, etc for tunnel T-3 and T-5 between 39 km to 52 km on Katra-Dharam section of Udhampur-Srinagar-Baramulla rail link project. The estimated cost of the work is Rs 389.69 crore. Aug 2020 : Union Territory (UT) of Jammu and Kashmir (J&K)'s newly appointed (22 August) reviewed the progress of 272 kilometres long railway line project connecting Udhampur, Srinagar and Baramulla at a cost of Rs 27,949 crore and Indian Railways has already commissioned 161 kilometres of the total 272 kilometres route length. the remaining portionl by 15 August 2022 Dec 2020: Northern Railway has expedites Udhampur-Srinagar-Baramulla rail line which is being constructed at an investment of ₹2,7249 crore and northern railway has decided to complete the 272-km long line by the end of December 2022. Mar 2021: The Northern Railway will be completing 111 km long section of the Udhampur-Srinagar-Baramulla rail link by December 2022. Sept 2021: Reviewed the progress of Udhampur Srinagar-Baramulla Rail Link project in Jammu and Kashmir and deliberated ways for early execution and had set the target for completion prestigious project will be completed by the end of 2022. Mar 2022 : Project work is under way. July 2022: The construction work on around 10 km long escape tunnel between Sumber and Sangaldan station in the Katra-Banihal section of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) was completed… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Not Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares