Search Tips

Kanpur metro rail project.

This Project Viewed 218 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: metro rail
  • Updated On: March 13 2025
  • Cost: Rs. 13,721.00 Crores

Location of the project

  • CityKanpur Nagar
  • StateUttar Pradesh
  • CountryIndia

Project Details

  • Kanpur metro rail project. Jan 2015: Uttar Pradesh Cabinet recently cleared proposal for metro-rail in Varanasi along with Agra, Meerut and Kanpur. Dec 2015: The detailed project report (DPR) of Kanpur Metro has been prepared. Feb 2016: The Metro rail project in Kanpur, Uttar Pradesh, would be launched by March 2016. Aug 2016: Detailed Project Report for Kanpur has already been approved. Oct 2016: Uttar Pradesh Chief Minister Akhilesh Yadav along with Union Urban Development Minister M. Venkaiah Naidu laid the foundation stone of the Rs 13,721 crore Kanpur Metro Rail Project. Sept 2017: Varanasi metro rail project face hurdles after the Centre returned the proposal for the project and asked the authorities to re-evaluate them. Jan 2018: The Adani Group and IL&FS are among the few companies which have shown interest in the project. Feb 2019: Rs. 175 crore has been sanctioned in 2018-19 budget allocation for Metro project in Kanpur. April 2019 : Union Cabinet recently approved the Kanpur Metro Rail Project and likely to be completed in 5 years June 2019 : Uttar Pradesh Metro Rail Corporation (UPMRC) will be set up for execution and operations of metro rail projects across big cities of UP July 2019 : : LMRC invites tender for construction of Elevated track and stations. Sept 2019: Afcons Infrastructure has emerged as the lowest bidder (L1) for Rs 676 crore contract for construction of nine Metro stations of Kanpur Metro rail project. Oct 2019 : Kanpur Metro project gets going to start from Oct 2 with pillar construction. Nov 2019: Uttar Pradesh Chief Minister Yogi Adityanath launched the civil construction work for the Kanpur Metro's section, from IIT-Kanpur to Moti Jheel on 15 November 2019. April 2020 : Systra has to be completed stations design of kanpur metro rail and construction work is completely closed due to covid 19. May 2020: The construction work has resumed on Kanpur Metro Project in Uttar Pradesh. For now work has started only inside the barricaded casting yard. Aug 2020 : In July Total of 2,330 piles are to be prepared between IIT and Motijheel, out of which around 1,300 piles have been prepared so far. 45% of the work is yet to be completed. Construction of only eight piles is left between IIT Kanpur and Gurudev metro station and Kanpur Metro will become operational either by the end of 2021 or early 2022. Sept 2020: The European Investment Bank (EIB) on 31 August 2020 signed a contract for funding of Kanpur’s Metro project for EUR 650 million (Rs 5,552 crore) through a virtual signing ceremony. Jan 2021 : .Cyclosystem India Pvt. Ltd. New Delhi has bagged a contract for Design, Manufacturing, Supply, Installation, Testing & Commissioning of Fully Automatic Train Washing Plants for Kanpur Metro Depots. Feb 2021: L&T's Railways Strategic Business Group of Transportation Infrastructure business has secured an order from UPMRCL for design, installation, testing and commissioning of ballastless track of standard gauge for corridors in elevated as well as underground sections of Kanpur and Agra Metro projects along with supply of fastening systems and associated ballasted/ballastless tracks in four depots. Apr 2021: Afcons has fast-tracked the work on Kanpur metro rail project. The base of the metro track for about 5 km has been completed out of the total length of 9 km of Priority Corridor. May 2021: The Priority Corridor of Kanpur Metro, which is being built between IIT & Motijheel has attained the ISO certificates for environment & safety management. The corridor has been certified with ISO 14001 for environment management & ISO 45001 for safety management. July 2021: The Uttar Pradesh Metro Rail Corporation (UPMRC) has invited tender for the construction of tunnel and three underground metro stations for the 23.7 km long Line-1 of Kanpur Metro Rail Project. Oct 2021: The Uttar Pradesh Metro Rail Corporation has started work on the second leg of phase-I of Metro construction work between Chunniganj and Nayaganj where the work has started with the preparation of the diaphragm wall at the Naveen Market Metro Station. Nov 2021: Uttar Pradesh Chief Minister Yogi Adityanath flagged off the trial run of Kanpur Metro between IIT-Kanpur and Motijheel on 10 November 2021. Two 6.52m diameter TERRATEC Earth Pressure Balance (EPB) Tunnel Boring Machines have been delivered for Uttar Pradesh Metro Rail Corporation's Corridor-1 of Kanpur MRTS Project in India. Dec 2021: On 28 December 2021, Prime Minister Narendra Modi will inaugurate the completed section of Kanpur Metro Rail Project. Prime Minister Narendra Modi inaugurated the completed section of Kanpur Metro Rail Project. Mar 2022: Work on the balance length of the 23 km long elevated corridor is likely to be completed on this corridor by 2024. The second corridor of Kanpur Metro is to be constructed between CSA University and Barra-8. That corridor too is to be completed by 2024. June 2022: Kalpataru Power Transmission (KPTL) has bagged contract for construction of elevated viaduct and five elevated stations of Kanpur Metro Rail Project worth Rs. 459 crore. Oct 2022: UPMRC completed D-wall construction at Jhakarkati Metro Station of the underground section. Dec 2022: Kanpur Metro’s 1st TBM breakthrough recorded at Nayaganj Station’s site on Package KNPCC-05 of the 32.4 km Kanpur Metro Phase 1 project. Jan 2023: JMC Projects recently erected their first 27.90m U-Girder in Kidwai Nagar for Kanpur Metro Phase 1 project’s Package KNPCC-07 connecting Transport Nagar Ramp – Naubasta Station. Feb 2023: Uttar Pradesh Metro Rail Corporation (UPMRC) has invited bids for tunnelling works and ramps of Corridor-2 Kanpur MRTS project in Kanpur, Uttar Pradesh under package KNPCC-11. The work involves the design and construction of TBM tunnel, cut and cover tunnel, ramp after Double Pulia, ramps in Agriculture depot for main line and depot connections and three underground metro stations at Rawatpur, Kakadeo and Double Pulia, including architectural finishes in Corridor-2 of Kanpur MRTS project in Kanpur. The contract is valued at Rs. 1,025 crore, with a completion period of 30 months. The bid submission deadline is 05 April, 2023. Uttar Pradesh government has made special allocations towards metro rail, A budgetary outlay of Rs 585 crore has been earmarked towards the Kanpur Metro Rail Project. May 2023: Afcons Infrastructure with assistance from Herrenknecht recently completed factory acceptance tests (FAT) on tunnel boring machine S-640B for Kanpur Metro Phase 1’s second underground section (KNPCC-06) connecting Nayaganj Station – Transport Nagar Ramp. June 2023: Gulermak – Sam India Builtwell JV celebrated tunnel boring machine (TBM) S93’s breakthrough at Naveen Market Station of the 32.4 km Kanpur Metro Phase 1 project. Aug 2023: The 'Tatya' Tunnel Boring Machine (TBM) achieved a significant milestone in the Kanpur Metro Rail Project by being successfully 'dragged' up to 215 meters inside the… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares