Search Tips

Khurja Super Thermal Power Project in Bulandshahar district of Uttar Pradesh.

This Project Viewed 191 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Energy > Storage > Generation > Conventional > Coal
  • Status: ******
  • Capacity: ******
  • Product: Thermal Power
  • Updated On: September 09 2023
  • Cost:

Location of the project

  • CityBulandshahar
  • StateUttar Pradesh
  • CountryIndia

Project Details

  • Khurja Super Thermal Power Project in Bulandshahar district of Uttar Pradesh. The project will be set up over 1,400 acre of land. Around 1,200.8 acre has already been acquired by Uttar Pradesh State Industrial Development Corporation and has been handed over to the company. The Ministry of Environment & Forests (MoEF) has accorded environment clearance to Khurja Super Thermal Power Project. Sep 2018: THDC India has floated global tender for installation of turbine generator and associated packages for Khurja Super Thermal Power Project (2x660 MW) located at Dushahara village in Khurja taluka of Bulandshehar district in Uttar Pradesh. Mar 2019: The Cabinet Committee on Economic Affairs (CCEA) has sanctioned investment approval for two x 660 MW Khurja Super Thermal Power Plant (STPP). May 2019: THDC India has invited bids for water system package for Khurja Super Thermal Power Project (STPP) (two x 660 MW) at Dushahara village, Khurja tehsil in Bulandshehar district of Uttar Pradesh. THDC India has invited bids for switchyard package for Khurja super thermal power project (STPP) (2x660 MW). The work will entail an investment of Rs 120.08 crore. Aug 2019: L&T-MHPS Boilers (LMB) has bagged an order from THDC India for design, engineering, manufacture, supply, erection and commissioning of Steam Generator and associated packages, including site levelling for the project. Oct 2019: BHEL has secured an order for turbine generator (TG) and associated packages for the greenfield two x 660 MW Khurja Super Thermal Power project in Bulandshahr. April 2020 : Work on project is not yet started and he first unit expected to be completed by November 2022 and the… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares