Project basic details

  • Industry: Infrastructure > Airport > Terminal
  • Status: ******
  • Capacity: ******
  • Product: Terminal
  • Updated On: January 03 2024
  • Cost: Rs. 1100 crore

Location of the project

  • CityTiruchirappalli
  • StateTamil Nadu
  • CountryIndia

Project Details

  • The proposed two-level terminal building would come up adjoining the existing one at this non metro airport with an elevated road along with an array of facilities. It would come up on an area exceeding 61,634 square metres on the site owned by the AAI adjoining the existing terminal building with basement and air-side corridor. The new building would come up at an estimated cost exceeding Rs. 621 crore. It would be a composite work which also includes IT and electromechanical works. The blueprint has been drawn up by a French consultant engaged by the Airports Authority of India which has also provided the necessary logistical support in giving shape to the structural design of the new building. In June 2018, The Public hearing was conducted. Feb 2019 : Work on project has been laid foundation stone for the project and expected to be completed by 18 October 2021. May 2020 : In April Civil works had been proceeding on a brisk pace until the lockdown was announced late last month and current lockdown could be made up once it was lifted., project was scheduled for completion in October 2021. Oct 2020: More than 40 percent of the construction work for the terminal building is completed and the project will be ready by March 2022. Jan 2021 : Nearly 47 % of the works for… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares