Dahisar-Mira-Bhayander Metro rail project (Metro 9).

This Project Viewed 129 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Rail-road
  • Status: ******
  • Capacity: ******
  • Product: Metro rail
  • Updated On: November 13 2025
  • Cost: ₹3,600 crore

Location of the project

  • CityMumbai
  • StateMaharashtra
  • CountryIndia

Project Details

  • Dahisar-Mira-Bhayander Metro rail project. The Dahisar–Mira-Bhayander corridor, which is also Metro 9 of the city is 10.5-km. The cabinet of Maharashtra recently cleared the project. Dec 2018: Prime Minister Narendra Modi laid the foundation stone for Dahisar-Mira-Bhayander Metro 9 corridor. Aug 2019: The Executive Committee of MMRDA has appointed the consortium of Systra (France), Consulting Engineers Group and Systra MVA Consulting (India) as general consultants for the Dahisar-East to Mira Bhayendar and Andheri-East to CSMIA Metro 9 corridor. Sept 2019: J Kumar Infraprojects has won a Rs19.98bn ($280.56m) contract for construction of one underground station for Mumbai Metro Line 9, two flyovers and an underground twin tunnel. Sept 2020 : In Aug Work on project is under -construction . Mar 2021: Red Line 7 is under construction, Yellow Line 2 is under construction. Green Line 10 is under Planning. June 2021: MMRDA has invited bids from eligible Bidders for Planning & Design of Multi Modal Integration at 11 Metro Stations of Mumbai Metro Line-7A & 9. Feb 2022: Ongoing work of the much awaited Metro-9 (Dahisar to Bhayandar) rail route has started gathering momentum, the Mumbai Metropolitan Region Development Authority (MMRDA) is facing a stiff resistance from villagers over the extension of the route and construction of the car shed in Rai village. Aug 2022: Work on two-deck flyover to carry road traffic and Metro Line-1 below it, is taking shape along Mumbai Metro Line-9 route between Dahisar and Mira Bhayander. Jan 2023: Jindal Steel & Power Ltd. (JSPL) won the contract to provide 6800 MT of head-hardened rails for the 11.38 km Red Line-9 and the 24.9 km Orange Line-5 of the Mumbai Metro (Dahisar East – Mira Bhayander). May 2023: Five firms have submitted bids to supply and install ballastless tracks on Mumbai Metro’s 11.38 km Line-9 which will connect Dahisar East and Mira Bhayandar through 8 stations. Bidders are- Apurvakriti Infrastructure Pvt. Ltd. ITD Cementation India Ltd. Paras Railtech Pvt. Ltd. Rahee Infratech Ltd. Texmaco Rail and Engineering Ltd. Sept 2023: Rahee Infratech was declared as the lowest bidder to supply and install ballastless tracks on Mumbai Metro’s 11.38 km Line-9 which will connect Dahisar East and Mira Bhayandar through 8 elevated stations. Oct 2023: MMRDA has firmed up plans to extend Mumbai Metro’s 11.38 km Line-9 (Red Line) to its train maintenance depot in Dongri, Thane District. Feb 2024: Bids are invited for development works for car depot at Dongri for Metro Line- 9 of Mumbai Metro Rail project. The scope of work includes depot land development works and construction of depot infrastructure comprising stabling yard, operation control centre, depot control centre, administrative building, maintenance, and inspection buildings, auxiliary substation, road, underground utility duct, architectural finishing, plumbing and PEB works. The contract, worth Rs. 626.69 crore, has a completion time period of 52 months (including monsoon). The bid submission deadline is 12 March, 2024. Jul 2024: Rithwik Projects has emerged as the lowest bidder (L1) for land development works related to car depot for Metro Line-9 of Mumbai Metro Rail Project. Awarded by the Mumbai Metropolitan Region Devp. Authority (MMRDA), The company was declared L1 with a bid value of Rs. 733.24 crore. Rithwik Projects will undertake the depot land development works and construction of Depot Infrastructures comprising stabling yard, operation control centre, Depot Control Centre, Administrative Building, maintenance and inspection buildings and auxiliary substation.… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares