Search Tips

Bullet train for Ahmedabad-Mumbai-Pune stretch

This Project Viewed 397 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway
  • Status: ******
  • Capacity: ******
  • Product: Bullet train
  • Updated On: June 08 2026
  • Cost: Rs. 97,636.00 Crores

Location of the project

  • City-
  • StateMultiple
  • CountryIndia

Project Details

  • Indian Railways has decided to develop a bullet train for Ahmedabad-Mumbai-Pune stretch. The Department will soon take up the feasibility study for the train project. At present, distance of 650 km between the Ahmedabad and Pune is covered in 12 hours, making Mumbai just two hours away. The new train would reduce the travel time to around three hours. Also, a Japanese consultant has carried out the initial study for the project. As per the initial study, the train will run at 250 km per hour and cost of laying the track will be around Rs. 50 crore per km. Sept 2014: An interim report on the proposed Ahmedabad-Mumbai bullet train will be ready November 2014, while the feasibility report on its technical and commercial viability will be completed by July 2015. Dec 2014: The French Railways, SNCF is carrying out feasibility study for the high-speed "bullet" train between Mumbai and Ahmedabad. Jan 2015: The Maharashtra government is scouting for new land in Mumbai for the Ahmedabad-Mumbai bullet train project. This was after the Mumbai Metropolitan Region Development Authority (MMRDA) expressed inability to part with a 10-hectare plot in suburban Mumbai. Sept 2015: The Japan International Cooperation Agency (JICA) has agreed to fund the Mumbai-Ahmedabad bullet train project in which Nashik will be a part of the route. Dec 2015: India and Japan are set to firm up an agreement on highspeed train services. Feb 2016: Indian railways has approached the Maharashtra government for land allocation for the proposed Mumbai-Ahmedabad bullet train terminal at Bandra Kurla Complex. The Central government has created a new company called the National High Speed Corporation, formed as a joint venture company between the Ministry of Railways and states of Gujarat and Maharashtra. Apr 2016: The Indian Railways plans to start the construction work of the high speed train between Mumbai and Ahmedabad in 2017. The Special Purpose Vehicle (SPV) National High Speed Rail Corporation formed to implement the Mumbai-Ahmedabad high speed bullet train project. May 2016: The Maharashtra government stated that a 4,000 sq ft plot had been set aside at the BKC for the station with an underground terminal and a commercial structure on top. June 2016: Bullet train project between Ahmedabad and Mumbai has run into an unexpected roadblock. The Maharashtra government has denied the Railways permission to build the station — Mumbai. May 2017: Prime Minister Narendra Modi and his Japanese counterpart will together lay the foundation stone for the bullet train project in September 2017. Sept 2017: Prime Minister Narendra Modi and Japanese Prime Minister Shinzo Abe laid the foundation stone for the project. Feb 2018: The government of Maharashtra has allocated Rs 125 crore as first instalment for the bullet train project. Mar 2018: The Maharashtra government has begun the process of acquiring 353 ha of land for the project. May 2018: Prime Minister Narendra Modi has accorded in-principle approval for diversion of 77 ha of forest land for developing the upcoming bullet train project. Sept 2018: The Indian Railways will miss the deadline of making the Mumbai-Ahmedabad bullet train operational by August 2022. Around 1000 farmers from Gujarat whose lands will be acquired for project have filed their affidavits in the Gujarat High Court. Oct 2018: The land acquisition for the Mumbai-Ahmedabad bullet train corridor would be completed by the month of December 2018. Jan 2019: The Palghar district administration has acquired the first land parcel in the district for the project. Mar 2019: NHSRCL has floated tender for design and construction of civil and building works including testing and commissioning for double line high speed railway involving viaducts, bridges, maintenance depots, stations (Package no MAHSR C-4). Apr 2019: The Ministry of Environment, Forest and Climate Change (MoEF&CC) has accorded coastal regulation zone (CRZ) clearance for High Speed Railway Project across CRZ areas in Mumbai, Mumbai Suburban, Thane and Palghar districts in Maharashtra. June 2019: Larsen & Toubro (L&T), Ircon International and Tata Projects have evinced interest for civil works of the ‘bullet train’ project, between Ahmedabad and Mumbai. July 2019: The National High-Speed Rail Corporation is acquiring land for the rail link between Mumbai and Ahmedabad. Aug 2019: The Maharashtra government had sought for an exemption from the process of getting mandatory approvals from acquiring grazing land in Thane and Palghar, which comes in the alignment of the Mumbai-Ahmedabad bullet train project, on 6 March 2019. The request for the same is still pending with Maharashtra Governor Ch Vidyasagar Rao. Sept 2019: The Bombay High Court has given a go-ahead for construction of the ventilation shaft and distribution and traction sub-stations at Vikhroli for the Mumbai-Ahmedabad Bullet Train project. The Gujarat High Court has dismissed 120 petitions filed by farmers for acquisition of land for the ambitious Mumbai-Ahmedabad bullet train project. Oct 2019: NHSRCL has sought clearance from the Ahmedabad Municipal Corporation (AMC) to begin construction on the bullet train project along the corridor passing through the city. Nov 2019: The National High Speed Rail Corporation has floated tender for design and construction of civil and buildings works including testing and commissioning for double line high speed railway for Mumbai underground station, cut and cover tunnel and shaft-1 from MAHSR 0.255 km to 0.775 km at Bandra-Kurla complex for the project for construction of Mumbai-Ahmedabad high speed rail in Mumbai Suburban district of Maharashtra on design-build lump sum price basis. Feb 2020 ; in JAN Around 47 per cent of the land has been acquired for the project ,rest of the 53 per cent will be acquired in next six months, work of acquiring the land is in the advanced stage and it it will be available for the project soon and Construction is likely to begin by March 2020 have been already acquired so far and project is scheduled for completion by December 2023. The Central government has allocated Rs 5,000-crore for the Mumbai-Ahmedabad bullet train project in the Union Budget 2020-21. Jul 2020: NHSRCL has acquired 60 percent of the land required for the project. The company had floated nine civil work tenders in 2019, which would be opened by the end of July or early August 2020. Oct 2020: L&T set to bag ₹25k Cr Ahmedabad-Mumbai bullet train project and Mumbai-Ahmedabad bullet train corridor is being built at a cost of Rs 1.08 lakh crore with funding from the Japan International Cooperation Agency. Nov 2020: L&T Construction has secured contract for construction of 87.569 km stretch of the Mumbai-Ahmedabad High Speed Rail (MAHSR) project. Mar 2021: NHSRCL might open the Gujarat leg of the Ahmedabad-Mumbai bullet train first if it could not acquire land in Maharashtra in the next three months. NHSRCL has acquired 95 percent of the land for the 352 km stretch of the project in Gujarat, but has been able to acquire only 23 percent of land for the 156 km stretch in Maharashtra. A total of 73.64 lakh sq mtr of land needs to be acquired in eight districts for the project, of which 69.99 lakh sq mtr have already been acquired, and leaving 3.65 lakh sq mtr, or around five percent of total requirement. The land acquisition has been completed in Valsad and Kheda districts and is in progress in Navsari, Ahmedabad, Anand, Bharuch, Surat and Vadodara. Aug 2021: Goodluck India has been awarded Letter of Intent (LoI) by Larsen & Toubro (L&T) for Bullet Train project for supply and fabrication of special bridges on the national high-speed rail track between Mumbai (Maharashtra) and Vapi (Gujarat). Sept 2021: Nearly 97 percent of the land required for the project has been acquired in Gujarat for development of the project. Oct 2021: The work on the Mumbai-Ahmedabad Bullet Train project is underway. The bullet train between Surat and Bilimora will be operated in 2026. Nov 2021: NHSRCL has commenced the casting of the first full span pre-stressed concrete (PSC) box girder of 40 mtr span to expedite the construction of a viaduct for Mumbai-Ahmedabad High-Speed Rail Corridor (MAHSR), in a casting yard in Anand, Gujarat, on 28 October 2021. Dec 2021: Larsen & Toubro (L&T) emerged as the lowest bidder for the design and construction of an 8 km viaduct and the Vadodara station. Jan 2022: Larsen & Toubro has secured an order from the National High Speed Rail Corporation (NHSRCL) to design and construct Package No. - MAHSR-C- 5 of the Mumbai Ahmedabad High Speed Rail Project Mar 2022: Around 89 percent of land required for Mumbai–Ahmedabad High-Speed Rail Corridor (MAHSR) project has been acquired. Apr 2022: Zetwerk Manufacturing will supply 10,000 tonne fabricated girders for the Mumbai-Ahmedabad Bullet Train project. The company has been awarded a letter of intent (LoI) for an order worth Rs 126.55 crore by L&T. May 2022: Larsen & Toubro (L&T) Construction has secured a contract for construction of 116 route km of high-speed ballastless track works (Package No: T3) for the Mumbai-Ahmedabad High-Speed Rail (MAHSR) Project. Sept 2022: Maharashtra CM has directed the departments concerned to work on a war footing and get the necessary clearances as quickly as possible and complete the land acquisition process for the bullet train project by the end of Sept 2022. Jan 2023: MEIL-HCC has been announced as the lowest bidder to build the Bandra-Kurla Complex (BKC) station of the Mumbai-Ahmedabad bullet train project. The project is likely to be completed by 2027. Apr 2023: IRCON International – Dineshchandra R. Agrawal Infracon JV recently launched their 1st precast segment for 18.133 km civil Package C-7 of the 508.17 km Mumbai – Ahmedabad High Speed Rail (MAHSR Bullet Train) project. June 2023: Larsen & Toubro was declared as the lowest bidder to construct 135.45 km Package C-3 of the 508.17 km Mumbai – Ahmedabad High Speed Rail (MAHSR Bullet Train) project by National High Speed Rail Corporation Ltd. (NHSRCL). July 2023: Sarathy Geotech & Engineering Services Pvt Ltd. through a subcontract from Afcons Infrastructure has started geotechnical soil investigation work for 20.377 km underground Package C-2 of the 508.17 km Mumbai – Ahmedabad High Speed Rail Sept 2023: Zetwerk on a subcontract from Larsen & Toubro – IHI Infrastructure Systems recently completed trial assembly on a 130 meter long open web girder (OWG) bridge for the 508.17 km Mumbai – Ahmedabad High Speed Rail (MAHSR Bullet Train) project. Feb 2024: Work on India’s first high-speed bullet train is progressing well, with the aim to speed up… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares