Search Tips

Rel to explore gas in KG-D6 block.

This Project Viewed 167 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Energy > Oil & Gas > Exploration & Prod
  • Status: ******
  • Capacity: ******
  • Product: Exploration & Prod
  • Updated On: February 06 2026
  • Cost: Rs. 40000 crore

Location of the project

  • City-
  • StateAndhra Pradesh
  • CountryIndia

Project Details

  • Rel to explore gas in KG-D6 block. The size of KG-DG’s reserves, well pressure, and overall complexity made this one of world’s toughest hydrocarbons projects. Bechtel managed engineering, procurement, installation, and commissioning. KG-D6's initial capacity of 2.8 billion cubic feet of natural gas per day essentially doubled India’s output. The KG-D6 natural gas project entailed: Installing subsea equipment Laying pipelines Building and placing a riser platform Constructing an onshore terminal The project included routing seven pipelines up the Nilarevu River and erecting a large onshore gas terminal about 19 miles (some 30 kilometers) south of Kakinada to receive the natural gas from the offshore system, dehydrate it, compress it, and feed it into an onshore pipeline to Mumbai. KG-D6 called for 22 subsea wells in the Bay of Bengal at depths of up to some 4,000 feet (more than 1,200 meters). That far below the surface, pressure runs well over a hundred times atmospheric pressure up top. And temperatures come close to freezing. It's no surprise that robots handle construction and maintenance. McDermott will provide engineering, procurement, installation and pre-commissioning of subsea flowlines, vent lines, and a pipeline-end manifold for connection with six subsea wells in the R-cluster field at a water depth of up to 6,890 feet (2,100 meters), including in-field pipelines, Monoethylene Glycol (MEG) line, pipeline-end terminals, jumpers, risers, umbilicals system and the modification of the control riser platform to interface with the new facilities. Apr 2019: The development is on track for first gas in 2H/FY21. Four of the six planned wells that will produce gas from the field have been completed. The fifth well is currently being drilled. The first offshore installation campaign is underway and expected to be completed in Q1/FY20. June 2019 : All six wells have been drilled and gas from this project is on schedule and expected by mid-2020. MJ is expected to begin production in mid-2022, April 2020 : Work on project is under-process but still delay coronavirus outbreak and the nationwide lockdown. May 2020: Reliance Industries to produce new gas from KG-D6 block by June 2020-end. Dec 2020: Production from older fields in the KG-D6 block was stopped in February this year. Operations at R-Field were expected to start earlier this year but were delayed owing to the pandemic and Reliance Industries Ltd and Britain’s BP announced the commencement of gas production from ultra-deep-water gas field in block KG D6 R-Field of Krishna Godavari basin July 2021 ; Work on project is under implementation and likely to be completed by Dec 2023. Feb 2022: Construction work is going on and scheduled for completion in further next year Nov 2022 : Work on project is under-process and likely to be completed in further next year 2023. Feb 2023: Reliance Industries and UK major BP are nearing the commencement of production from their MJ deep-water project in the KG-D6 block, which will boost gas output from the east coast asset. The MJ field will come on stream and production is… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares