Implementation of Nagpur Metro Phase-II.

This Project Viewed 115 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro Rail
  • Updated On: December 31 2025
  • Cost: Rs. 6,708 crore

Location of the project

  • CityNagpur
  • StateMaharashtra
  • CountryIndia

Project Details

  • Implementation of Nagpur Metro Phase-II. The corridors include one from Automotive Square to Kanhan – 13 km length and 12 stations. The corridor will cater to areas like Khasara, Lekha Nagar, Kamptee and Dragon Palace. The second corridor will be from Mihan to Butibori MIDC ESR – 18.7 km length and 10 stations. The corridor will have the catchment area of Jamtha, Dongargaon, Mohgaon, Butibori, Mhada Colony and Indorama Colony. The third corridor is from Prajapati Nagar to Transport Nagar – 5.5 km length and three stations. The corridor will cater to areas in the vicinity of Ambe Nagar, Kapsi, Transport Nagar and Asoli. The fourth corridor is Lokmanya Nagar to Hingna – 6.6 km length and seven stations. The corridor will pass through Nildoh, Gajanan Nagar, Rajiv Nagar, Lakshmi Nagar, Raipur, and Hingna village, including surrounding MIDC areas. The allocation for Phase-II has been made in the Union Budget for 2021-22 even though it has not been cleared by the Cabinet yet. The Union Ministry of Housing and Urban Affairs (MoHUA) has already cleared Phase-II. It had sent copies of the detailed project report (DPR) to other concerned ministries like finance, road transport, railways, home, environment, etc. MahaMetro will secure finance from foreign agencies immediately after the Cabinet approval and then float tenders for all four reaches of the Phase-II. Mar 2021: RITES has secured order for extension of general consultancy work for Nagpur Metro Rail project. Jul 2021: The Maharashtra Metro Rail Corporation (MMRCL) has floated tenders for design and construction of elevated Metro viaduct of length 9.550 km between ch 19,970 to 20,700 mtr and 21,296.917 mtr to ch 30,117 mtr in Reach-1A, construction of embankment for at-grade section of length 1.017 km (ch 19,550 mtr to ch 19,970 mtr and ch 20,700 mtr to 21,296.917 mtr), fabrication and launching of superstructure of railway span of length 70 mtr and construction of five Metro stations (four elevated and one at grade) in Reach-1A of NMRP Phase-2 of Maharashtra. The work will entail an Rs 470.3 crore. The scope of work also envisages design and construction of elevated Metro viaduct of length 4.856 km between ch (-)580 mtr to ch (-)5,436.085 mtr reach 4A and construction of three elevated Metro stations in Reach-4A of NMRP Phase-2 of Maharashtra entailing an investment of Rs 246.17 crore. Nov 2022 : Phase II will connect the satellite cities of Nagpur and will highly benefit a population of over 10 lakh residing in these areas. It is scheduled to be completed in 2026. Dec 2022: On 11 Dec 2022, Prime Minister Narendra Modi laid the foundation stone of Phase-II of the metro project in the city. Feb 2023 : Maharashtra Metro Rail Corporation Limited (MMRCL) has commencing preliminary work on phase II of the project. Apr 2023: Maharashtra Metro Rail has invited bids for Survey, Design, Engineering, Manufacture, Supply, Storage, Civil work, Erection, Testing & Commissioning of 1.5 MWp Rooftop and ground mounted Solar PV projects under RESCO Model including Operation and Comprehensive Maintenance (O&M) for a period of 25 years after commissioning at various locations in-and-around Futala Lake, Nagpur. June 2023: MMRCL has declared Rail Vikas Nigam as the lowest bidder (L1) for Phase-II. The work entails designing and constructing an elevated Metro viaduct of stretch 6.92 between ch 657.182 mtrs. to ch 7576.78 mtrs. in Reach 2A of Phase-II. The project, which has an estimated cost of Rs. 394.89 crore, is expected to be executed within 30 months from the commencement date. July 2023: Bids are invited for an elevated viaduct for Reach-3A of Nagpur Metro Rail Project (NMRP) Phase-II. Under the scope of work, the design and construction of elevated metro viaduct of length 6.414 km between ch 18218.586 m to ch 24633.194 m in Reach-3A will be carried out, in a 30-month work completion period. The project is valued at Rs. 380 crore. The bid submission deadline is 15 September, 2023. Aug 2023: Rail Vikas Nigam (RVNL) has been declared as the lowest bidder (L1) for construction of a multi-storied building at Tulsi School Land at Sitabuldi of NMRP Phase-II. Feb 2024: Bids are invited for the construction of elevated Metro stations. The work encompasses development of elevated Metro stations seven nos. in Reach 3A, namely, Hingna Mount View, Rajiv Nagar, Wanadongri, APMC, Raipur, Hingna Bus Station, Hingna. The work also includes three elevated Metro stations in Reach 4A, namely Pardi, Kapsi Khurd, Transport Nagar of NMRP Phase-II. The contract, amounting to Rs. 308 crore, is expected to be completed within 30 months. The due date to submit the bid is 08 March, 2024. Bid are invited for the construction of six elevated Metro Stations in Reach 2B of NMRP Phase-II. Under the scope, the stations are Cantonment, Kamptee Police Station, Kamptee Municipal Council, Dragon Palace, Golf Club and Kanhan River Metro Station between ch 7576.78 mtrs. to ch 13457.76 mtrs. in Nagpur. The work is to be completed in 30 months, at a cost of Rs. 203.76 crore. The last date to submit the bid is 15 March, 2024. Mar 2024: Bids are invited for work entails design and development of elevated viaduct in between ch (-) 7,577.056 m to ch (-) 13457.046 m of length 5.9 km in Reach 2B, between ch 18,218.586 m to ch 24,633.194 m of length 6.414 km in Reach-3A, and between ch (-) 289.668 m to ch (-) 5,622.577 m of length 5.333 km in Reach-4A. The contract is estimated to cost Rs. 1,010 crore and anticipated to be completed within 36 months from the date specified in the letter of award (LoA). The due date to submit the bid is 08 April, 2024. Apr 2024: Bids are invited for installation and commissioning of machine room-less elevators and escalators under Lot-1 and Lot-2 for Nagpur Metro Rail Project Phase-II. The works to be executed include the design, manufacture, installation, integrated testing and commissioning of Lot-1 (heavy duty machine room less elevators), Lot-2 (escalators). It also includes technical support and maintenance. The contract is valued at Rs. 153 crore. The closing date for bid submisison is 23 May, 2024. May 2024: Maharashtra Metro Rail Corporation Ltd has awarded Detailed Design Consultant (DDC) Package DDC-04 of the 43.8 km Nagpur Metro Phase 2 project to Structcon Designs. The contract is worth Rs. 24 lakh and involves DDC services for at-grade section of Reach-1A for the length of approx. 1669.417 m (Ch 19550 to Ch.20421.016 and Ch. 20498.516 to 21296.917) of Nagpur Metro Rail Project Phase-II. Rail Vikas Nigam (RVNL) has emerged as lowest bidder for construction of elevated Metro stations at Cantonment, Kamptee Police Station, Kamptee Municipal Council, Dragon Palace, Golf Club and Kanhan River Metro… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Not Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Not Available!

Project Finance Breakup

Project Finance Breakup Not Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares