Search Tips

Pune metro railway project.

This Project Viewed 511 Times

Buy this Project @ 250 Cold Call Support @ 250

Project basic details

  • Industry: Infrastructure > Railway > Metro Rail
  • Status: ******
  • Capacity: ******
  • Product: Metro Rail
  • Updated On: June 24 2026
  • Cost: Rs. 11,400.00 Crores

Location of the project

  • CityPune
  • StateMaharashtra
  • CountryIndia

Project Details

  • The Pune Municipal Corporation (PMC) has decided to develop Pune metro railway project on public-private partnership model at a cost of Rs Rs 17,935 crore. The first route of 16.58 km will start from Chinchwad and runs along Pimpri, Shivajinagar up to Swargate entailing an investment of Rs 4,930 crore. The second route with a proposed length of 14.92 km spans over Paud road, Deccan Gymkhana, Shivajinagar, Bundgarden, Yerawada up to Kalyani Nagar will entail investment of Rs 2,217 crore. Also, the construction of metro hub, corridors on elevated surface and taxes will add up to a total investment of Rs 9,534 crore. Aug 2014: Government gave in-principle nod for Pune Metro Jan 2015: Work on the much-awaited Metro rail project is likely to start in 2015. Mar 2015: The state will ask the Union Government to give the go ahead to begin work on Corridor-I (from Nigdi to Swargate). June 2015: The Metro will have mixed - underground and elevated - corridors and the Centre's nod is expected soon for it. According to the project report prepared for Pune Metro by Delhi Metro Rail Corporation, the city should have the first phase corridor (Swargate to Nigdi) underground on the route going through congested areas while the second (Vanaz to Ramwadi) could be an elevated one. Sept 2015: Pune Metro project gets Centre's green light. May 2016: All formalities for the proposed Pune Metro Rail project have been completed and it will be cleared by the Centre in June 2016. June 2016: Recently pre-public investment board (PIB) meeting cleared the project. Sept 2016: The World Bank and the Asian Infrastructure Investment Bank recently approved a loan of Rs 6,325 crore for the project. Oct 2016: Nagpur Metro Rail Corporation (NMRCL) will plan and execute the Pune Metro project. Dec 2016: On 6 December, 2016, the Prime Minister's office (PMO) approved the Pune metro rail project. The PM will inaugurate the Pune Metro project on on 24 December, 2016. On 7 December, 2016, the Union Cabinet approved the development of Pune Metro Rail Project Phase-I. PM Modi laid foundation stone for the project. Jan 2017: The western zone bench of the National Green Tribunal (NGT) issued an interim stay on a proposed portion of the metro rail route passing through the Mula-Mutha riverbed in the city recently. Mar 2017: 35 per cent of topography survey and geo-tech investigation work is completed. The work on first 10 kms route between Pimpri Chinchwad Municipal Corporation (PCMC) to Shivaji Nagar will start by April 2017. Maharashtra Metro Rail Corpn has invited bids for construction of the metro corridor of 10.795 km length. Mar 2017: Nine companies namely Larsen & Toubro, Afcons Infrastructure, IL&FS Engineering and Construction, J Kumar Infra Projects, Tata Projects, NCC, Soma Enterprises, ITD Cementation India, and IMC Projects India attended the bidders’ conference have shown interest in the Pimpri-Chinchwad elevated stretch in the Pune Metro project. Pune Metropolitan Region Devp Authority has invited pre-qualifications for short listing of bidders for Hinjewadi-Shivajinagar-Pune metro rail project in Pune. Apr 2017: Afcon Infrastructure, Simplex Infrastructure, NCC, and Gayatri Projects have been shortlisted for the next round. Technical scrutiny of the bids are underway. May 2017: NCC has secured a Rs. 499 crore bid to construct the elevated metro rail viaducts for a stretch of 10.75 km of the metro line. July 2017: EIB will fund EUR 600 million for the first phase of Pune metro rail. Nov 2017: Maharashtra Metro Rail Corporation has awarded Pune Metro Rail project contract to Hindustan Construction Company (HCC) joint venture with AL FARA’A. Jan 2018: The Maharashtra state cabinet has approved the third line ( 23.3 km Line-3 will link the IT hub of Hinjewadi to the Pune city centre at Shivajinagar). Aug 2018 : Mahametro has started civil work on both lines Vanaz-Ramwadi and Pimpri-Swargate. MahaMetro has planned work in two stages. Phase -1 Shivajinagar station Phase-2 Budhwar Peth Metro station to Swargate Oct 2018: A joint venture of Tata Realty Infrastructure and Siemens has won the bid for the third line of the Pune metro project, the line will run from the IT hub of Hinjewadi to Shivaji Nagar in central Pune. J. Sagar Associates (JSA) advised and assisted Pune Metropolitan Region Development Authority as legal advisor. Jan 2019 ; Project cost of the first phase of Rs11,400 crore project with a total length of 31.25 km is scheduled to be completed in 2021. Mar 2019: Pune metro railway project 2nd order win by HCC contractor joint venture with AL FARA'A. Rs. 484 crore (HCC share 51% which is Rs. 247 crore). July 2019: The contract of HCC-Al Fara’a was terminated due to “inconsistency” and “slow progress” of the work and was given to the Shapoorji Pallonji Group. The seven km of first route of Pune Metro will be operational by December 2019. Aug 2019: MahaMetro has received approval from the European Investment Bank (EIB) for loan of EUR 600 million. Titagarh Firema (TFA) has emerged as the lowest (L1) bidder for design, manufacture and supply of 102 Metro Coaches for Pune Metro Rail. Sept 2019: PMRDA has inked a formal concession agreement for the third Pune Metro line (Hinjawadi- Shivajinagar) project. The agreement has been signed with the consortium of TRIL Urban Transport (a subsidiary of Tata Realty and Infrastructure) and Siemens Project Ventures. The Phase-I of eight km, from Hinjewadi to Balewadi, will be completed by 2020. Jan 2020: Cabinet Minister of Urban Development, government of Maharashtra, Eknath Shinde inaugurated second tunnel work by tunnel boring machine (TBM) at College of Agriculture, Pune. Feb 2020: The European Investment Bank (EIB) has inked a loan agreement of Rs 1,600 crore with the Maharashtra Metro Rail Corporation (Maha Metro) for Pune Metro Rail project. March 2020 : Pune metro’s first line from Tukaram Nagar to Phugewadi is scheduled for April. This stretch, part of the Pimpri-Chinchwad to Swargate Line-1 is set to be functional by March 2020, all three lines of the metro are likely to be functional by 2022 and likely to be completed by 2023. Apr 2020: The Pune Metro rail project have stopped the major construction tasks due to the COVID-19 lockdown. May 2020: MMRC has resumed work on the Pune Metro Rail project after green signal from the government of Maharashtra and the civic body, easing of restrictions imposed during the lockdown. Jul 2020: The Government of Maharashtra has approved the transit-oriented development (TOD) zone for the Hinjewadi to Shivajinagar Metro corridor. Oct 2020: Pune Metro project in Maharashtra has reached 44 percent and by mid-2021, the 13 km route consisting of two lines will be commercially operational. Apr 2021 ; Pune Metro’s Phase 1 project is on track to rollout for testing in May 2021 and get dispatched by August 15, 2021. MahaMetro has put into service the two tunnel boring machines (TBM) to excavate towards the Kasba Peth station. May 2021: Pune Metro Rail project Reach-1 by the Pune Mahanagar Metro Rail Corporation is under progress. The Pune Mahanagar Metro Rail Corporation has undertaken development of Pimpri-Chinchwad to Swargate Metro (Line 1) of Pune Metro Project Phase-I in Maharashtra. The government of India (GoI) and the European Investment Bank (EIB) on 7 May 2021 signed the finance contract for second tranche of EUR 150 million (about Rs 1,350 crore) for Pune Metro Rail project in Maharashtra. EIB had approved a total loan of EUR 600 million (about Rs 5,400 crore) to fund the Metro project. June 2021: The standing committee of Pune Municipal Corporation (PMC) has approved handing over of land for the Hinjewadi-Shivajinagar Metro project (Corridor-3). Jul 2021: Pune Metro project is likely to operationalise its first two stretches before the end of 2021. A tunnel-boring machine (TBM), which started excavation from the Swargate underground Metro station site, has arrived at the Mandai station site and will continue digging a tunnel till the Budhwar Peth station site in Kasba Peth for Pimpri Chinchwad Municipal Corporation (PCMC)-Swargate Metro Corridor. Sept 2021: Work at Harris Bridge has also been expedited. The construction work of the pillars across the river has been completed and the installation of girders from both ends of the bridge has started in full swing. The construction of a viaduct after the Dapodi Metro station up to Harris Bridge has been completed. The work on Hinjewadi-Shivajinagar Metro corridor will commence soon. The land acquisition process is nearly complete for the corridor and the Pune Municipal Corporation (PMC) has given an in-principle approval to the University flyover plan, clearing the decks for the project’s concessionaire — Tata-Siemens to begin the project. Dec 2021: The pre-engineering work and geotechnical investigation have been completed, while 70% of the work sites have been barricaded; soil testing, structural design, and work at the casting yard have also begun. PMRDA has informed that construction work on the 23km long elevated Hinjewadi -Shivajinagar Metro corridor has been initiated at an investment of ₹8,000. Jan 2022: The Pune Metro’s PCMC-Phugewadi elevated stretch has received authorisation from the Commissioner of Metro Rail Safety (CMRS). Mar 2022: On 6 March 2022, Prime Minister Shri Narendra Modi inaugurated 12 km stretch of the total 32.2 km Pune Metro Rail Project, being built at a total project cost of Rs 11,400 crore. Two elevated routes of the project were opened for passengers; one from Vanaz to Garware College (5 km stretch with 5 stations) and the second from PCMC to Phugewadi (7 km elevated stretch with 5 stations). The Pune Metro rail from Swargate to Pimpri Chinchwad and Vanaz to Ramwadi in Pune is nearing completion. The Pune Metropolitan Region Development Authority has started work on the Pune Metro Line 3 project connecting Rajiv Gandhi IT Park in Hinjewadi to Shivajinagar with a length of 23 km. Apr 2022: Approval was given for renaming of Metro Line-3 as the Maan-Hinjewadi-Shivajinagar Metro Line. Sept 2022: Tata Sons has planned to invest ₹975 crore in Pune IT City Metro Rail for the contract to construct, operate, and maintain the project connecting Shivaji Nagar and Hinjewadi. Maha Metro has started trials of Pune Metro rail project with the communication base train control signalling system (CBTC). Nov 2022: NCC Ltd. on October 31 celebrated launching the final box segment for 10.795 km Reach-1 (PCMC – Range Hills) section of Pune Metro’s 16.589 km Purple Line which will connect PCMC – Swargate through 14 stations. Aug 2023: The Pune Unified Metropolitan Transport Authority (PUMTA) has decided to consolidate all three metro lines into a single building at the Civil Court station. With the support of both Pune Metropolitan Region Development Authority (PMRDA) and Maharashtra Metro Rail Corporation (Maha Metro), the three lines of Pune Metro, namely PCMC to Swargate, Vanaz to Ramwadi, and Hinjewadi to Shivajinagar, will now interchange at the Civil Court Station. PMRDA and Maha Metro have offered to cover the additional cost. The PCMC to Swargate line station is situated underground, while the Vanaz to Ramwadi line station is elevated at Civil Court Station. The station for the… More

Contact Details

Contact Details Available!

Consultant Details

Consultant Details Available!

Contractor Details

Contractor Details Available!

Architector Details

Architector Details Not Available!

Milestone

Milestone Details Available!

Project Finance Breakup

Project Finance Breakup Details Available!

Post your comments:
E-mail ID will not be published
Maximum 500 Characters
Top
OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Refund & Cancellation Policy | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Ruban Softwares