SUPPLY AND LAYING OF MS 700 MM DIAMETER DEDICATED PIPE FOR REMOVAL OF RESIDUAL OVERFLOW WATER FROM SLUDGE POND OF GRWW UPTO APPROACH ROAD OF SANTOSHPUR RAILWAY STATION ALONG NEW SANTOSHPUR ROAD. | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:SUPPLY AND LAYING OF MS 700 MM DIAMETER DEDICATED PIPE FOR REMOVAL OF RESIDUAL OVERFLOW WATER FROM SLUDGE POND OF GRWW UPTO APPROACH ROAD OF SANTOSHPUR RAILWAY STATION ALONG NEW SANTOSHPUR ROAD.
SUPPLY AND LAYING OF MS 700 MM DIAMETER DEDICATED PIPE FOR REMOVAL OF RESIDUAL OVERFLOW WATER FROM SLUDGE POND OF GRWW UPTO APPROACH ROAD OF SANTOSHPUR RAILWAY STATION ALONG NEW SANTOSHPUR ROAD.