Construction of Approach Roads with Avalanche Protection Works to East Portal (Length 0.66 km) and West Portal (Length 8.05 km) of Proposed Zojila Tunnel in the UT of Jammu and Kashmir and Ladakh (Package-3) | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Construction of Approach Roads with Avalanche Protection Works to East Portal (Length 0.66 km) and West Portal (Length 8.05 km) of Proposed Zojila Tunnel in the UT of Jammu and Kashmir and Ladakh (Package-3)
Construction of Approach Roads with Avalanche Protection Works to East Portal (Length 0.66 km) and West Portal (Length 8.05 km) of Proposed Zojila Tunnel in the UT of Jammu and Kashmir and Ladakh (Package-3)