Stage strengthening from Km.29.200 to 38.000 (Total Length 8.80 Km.) of NH-127A in the State of Assam under Rangia NH Division under EPC Mode under AP 2019-20 (Job No.127A/AS/2019-20/197) | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Stage strengthening from Km.29.200 to 38.000 (Total Length 8.80 Km.) of NH-127A in the State of Assam under Rangia NH Division under EPC Mode under AP 2019-20 (Job No.127A/AS/2019-20/197)
Stage strengthening from Km.29.200 to 38.000 (Total Length 8.80 Km.) of NH-127A in the State of Assam under Rangia NH Division under EPC Mode under AP 2019-20 (Job No.127A/AS/2019-20/197)