Widening/Improvement to 4 Lane with Paved Shoulder from km 81.000 to km 95.400 (Design Chainage 80.930 to 96.400) of Loring Thepi Ganapath Gaur Gaon Section (Package-4) of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Widening/Improvement to 4 Lane with Paved Shoulder from km 81.000 to km 95.400 (Design Chainage 80.930 to 96.400) of Loring Thepi Ganapath Gaur Gaon Section (Package-4) of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode
Widening/Improvement to 4 Lane with Paved Shoulder from km 81.000 to km 95.400 (Design Chainage 80.930 to 96.400) of Loring Thepi Ganapath Gaur Gaon Section (Package-4) of NH-29 in the state of Assam under Bharatmala Pariyojana on EPC mode