Construction of Two lane with paved shoulder from Km 80.800 to Km 120.125 (Satna-Maihar section) of NH 135BG (design length 39.325 km) under Bharatmala Pariyojana in Madhya Pradesh on EPC mode. | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Construction of Two lane with paved shoulder from Km 80.800 to Km 120.125 (Satna-Maihar section) of NH 135BG (design length 39.325 km) under Bharatmala Pariyojana in Madhya Pradesh on EPC mode.
Construction of Two lane with paved shoulder from Km 80.800 to Km 120.125 (Satna-Maihar section) of NH 135BG (design length 39.325 km) under Bharatmala Pariyojana in Madhya Pradesh on EPC mode.