Construction and Up-Gradation to 4 lane with Paved Shoulder configuration of existing 2 lane for Panchagram Bypass with 4-lane Bridge across Barak River on NH 44 old (NH 8 New) between Design Chainage Km 13.200 to Km 27.400 in the State of Assam. | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Construction and Up-Gradation to 4 lane with Paved Shoulder configuration of existing 2 lane for Panchagram Bypass with 4-lane Bridge across Barak River on NH 44 old (NH 8 New) between Design Chainage Km 13.200 to Km 27.400 in the State of Assam.
Construction and Up-Gradation to 4 lane with Paved Shoulder configuration of existing 2 lane for Panchagram Bypass with 4-lane Bridge across Barak River on NH 44 old (NH 8 New) between Design Chainage Km 13.200 to Km 27.400 in the State of Assam.