Restoration of flexible pavement at Km106.60 and Construction of Slope Protection work by Reinforced Earth Structure at 03 locations (i.e. Km68.80, Km71.50 and Km 71.55), on NH-4, on item rate basis, in the UT of AN Islands. | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Restoration of flexible pavement at Km106.60 and Construction of Slope Protection work by Reinforced Earth Structure at 03 locations (i.e. Km68.80, Km71.50 and Km 71.55), on NH-4, on item rate basis, in the UT of AN Islands.
Restoration of flexible pavement at Km106.60 and Construction of Slope Protection work by Reinforced Earth Structure at 03 locations (i.e. Km68.80, Km71.50 and Km 71.55), on NH-4, on item rate basis, in the UT of AN Islands.