Stage strengthening of road stretches from Km 0.00 to Km 3.50 along with provision for both sides covered drain and construction drain and construction of one culvert at Km 0.00 of NH 512 in the district of Malda on EPC mode. | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Stage strengthening of road stretches from Km 0.00 to Km 3.50 along with provision for both sides covered drain and construction drain and construction of one culvert at Km 0.00 of NH 512 in the district of Malda on EPC mode.
Stage strengthening of road stretches from Km 0.00 to Km 3.50 along with provision for both sides covered drain and construction drain and construction of one culvert at Km 0.00 of NH 512 in the district of Malda on EPC mode.