Widening and Strengthening to 2 lane with paved shoulders from Km. 8.0 Design Ch. Km 7.870 to 25.0 Design Ch. Km 24.890 of Sironcha to Mahadevpur Section of NH 353C in the State of Telangana under Annual Plan 2021-22 on EPC Mode. | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Widening and Strengthening to 2 lane with paved shoulders from Km. 8.0 Design Ch. Km 7.870 to 25.0 Design Ch. Km 24.890 of Sironcha to Mahadevpur Section of NH 353C in the State of Telangana under Annual Plan 2021-22 on EPC Mode.
Widening and Strengthening to 2 lane with paved shoulders from Km. 8.0 Design Ch. Km 7.870 to 25.0 Design Ch. Km 24.890 of Sironcha to Mahadevpur Section of NH 353C in the State of Telangana under Annual Plan 2021-22 on EPC Mode.