Fabrication, Supply, Erection, Trial Run and Commissioning of 2x 40/50 MVA, 132/33 kV substation which includes all the electrical outdoor and indoor equipment, lighting system, earthing system, lightning protection system, signalling and control system, DG set | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Fabrication, Supply, Erection, Trial Run and Commissioning of 2x 40/50 MVA, 132/33 kV substation which includes all the electrical outdoor and indoor equipment, lighting system, earthing system, lightning protection system, signalling and control system, DG set
Planning, Design, Engineering, Construction, Fabrication, Supply, Erection, Trial Run and Commissioning of 2x 40/50 MVA, 132/33 kV substation which includes all the electrical outdoor and indoor equipment, lighting system, earthing system, lightning protection system, signalling and control system, DG set, fire fighting system,structural and civil works, drinking water supply system etc. on Turnkey Basis at KusmundaOCP,SECL.