Potholes filling with W.B.M. and patch repair work with 75 mm Bituminous Macadam along with 20 mm Premix Carpet & Seal Coat Type-B of Rampur - Kathgodam section of NH-87 (km. 0.00 to km. 88.00) in total length of 35.635 kms. in the State of U.P. and Uttarakhand. | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Potholes filling with W.B.M. and patch repair work with 75 mm Bituminous Macadam along with 20 mm Premix Carpet & Seal Coat Type-B of Rampur - Kathgodam section of NH-87 (km. 0.00 to km. 88.00) in total length of 35.635 kms. in the State of U.P. and Uttarakhand.
Potholes filling with W.B.M. and patch repair work with 75 mm Bituminous Macadam along with 20 mm Premix Carpet & Seal Coat Type-B of Rampur - Kathgodam section of NH-87 (km. 0.00 to km. 88.00) in total length of 35.635 kms. in the State of U.P. and Uttarakhand.