Removal/Cleaning Of Deposited Silt, Sludge, Slush, Trash Etc. In All Kinds Of Soil Including Saturated Or Unsaturated Soil And Disposal Of And Neatly Dressed (Lift + 38 Mtr. And Average Up To Dumping Area) Including Dewatering The Pumps Of Suitable Capacity To Keep De-Sanding Cable, T & P, Pipes Including Safety Equipment Charges And To Perform All Other Activities Required The Same Up To Required Level And Lift, Disposed Soil To Be Levelled Manual Lead Up To + 170 Mtr. & Mechanical Transport + 3.00 Km. Seepage/Leakage Water Entering The Chamber By Providing Chamber:No.-I Water Free Till Completion Of Work, Scaffolding , To Workers. Illumination, Electricity Charges Including Installation To Carryout The Job Complete In All Respect.