Ernakulam - Shoranur section - Proposed construction of Limited Use Subway in lieu of existing level crossing No. 12 at KM. 20/6-7 between Wadakkancherry and Mulangunnathukavu stations - Construction of 9.25x 4.0 M RCC box by pushing technique, RCC retaining wall, approach works etc; ( MINALUR GATE) | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Ernakulam - Shoranur section - Proposed construction of Limited Use Subway in lieu of existing level crossing No. 12 at KM. 20/6-7 between Wadakkancherry and Mulangunnathukavu stations - Construction of 9.25x 4.0 M RCC box by pushing technique, RCC retaining wall, approach works etc; ( MINALUR GATE)
Ernakulam - Shoranur section - Proposed construction of Limited Use Subway in lieu of existing level crossing No. 12 at KM. 20/6-7 between Wadakkancherry and Mulangunnathukavu stations - Construction of 9.25x 4.0 M RCC box by pushing technique, RCC retaining wall, approach works etc; ( MINALUR GATE)