Construction of Road Tunnel, viaduct and Churhat Bypass of Rewa Sidhi Section of NH 75E from Chainage 33.200 to Chainage 55.400 (Design Length 15.350 km.) as Cement Concrete Pavement configuration in the State of Madhya Pradesh on design, build, operate and transfer | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Construction of Road Tunnel, viaduct and Churhat Bypass of Rewa Sidhi Section of NH 75E from Chainage 33.200 to Chainage 55.400 (Design Length 15.350 km.) as Cement Concrete Pavement configuration in the State of Madhya Pradesh on design, build, operate and transfer
Construction of Road Tunnel, viaduct and Churhat Bypass of Rewa Sidhi Section of NH 75E from Chainage 33.200 to Chainage 55.400 (Design Length 15.350 km.) as Cement Concrete Pavement configuration in the State of Madhya Pradesh on design, build, operate and transfer (the “DBOT Annuity” or “Hybrid Annuity”) basis