4-laning of existing 2-laning stretch from Wakhri at Km 44.700 to Khudus at Km 77.800 (Pkg 2) on Mohol-Alandi section (design length 33.100 km) of NH-965 in the state of Maharashtra on EPC Mode. | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:4-laning of existing 2-laning stretch from Wakhri at Km 44.700 to Khudus at Km 77.800 (Pkg 2) on Mohol-Alandi section (design length 33.100 km) of NH-965 in the state of Maharashtra on EPC Mode.
4-laning of existing 2-laning stretch from Wakhri at Km 44.700 to Khudus at Km 77.800 (Pkg 2) on Mohol-Alandi section (design length 33.100 km) of NH-965 in the state of Maharashtra on EPC Mode.