Survey, Investigation, Design And Construction Of C.M. Piped Water Supply Scheme At Village - Lingapani Block Seoni Distt. Seoni Based On Tube Wells Including Installation Of Electric Submersible/Centrifugal Water Motor Pump | News On Projects | Tenders - Powering Businesses With New Projects News
Summary:Survey, Investigation, Design And Construction Of C.M. Piped Water Supply Scheme At Village - Lingapani Block Seoni Distt. Seoni Based On Tube Wells Including Installation Of Electric Submersible/Centrifugal Water Motor Pump
Survey, Investigation, Design And Construction Of C.M. Piped Water Supply Scheme At Village - Lingapani Block Seoni Distt. Seoni Based On Tube Wells Including Installation Of Electric Submersible/Centrifugal Water Motor Pump, Construction Of 50 Kl R.C.C. Oht 12 Mtr. Staging, Laying And Jointing Of Rising Main And Distribution Pipe Line System, Household Tap Connections, Construction Of Pump House, Site Development Around Oht, Electric Power Connections At Tube Wells Including Cost Of All Material And Labour With 30 Days Trial Run/Commissioning Period And 24 Months Operation And Maintenance Of Entire Scheme
Location Seoni - Madhya Pradesh