| Total 115 projects are covered in this issue. Updated between Mar 21- Mar 28 26 |
|
Road/Highway
|
|
|
4-lane greenfield highway between Mokama and Munger in Bihar.
4-lane greenfield highway between Mokama and Munger in Bihar.
Sept 2025:
The Cabinet Committee on Economic Affairs (CCEA) has approved the
project.
Union Minister...Read More
|
|
Construction of elevated rotary (flyover) and three Vehicular Underpasses (VUPs) at G Corner, Y-junction, Maruthi Nagar, and Sanjeevi Nagar along the Trichy–Chennai national highway.
Construction of elevated rotary (flyover) and three Vehicular Underpasses
(VUPs) at G Corner, Y-junction, Maruthi Nagar, and Sanjeevi Nagar along
Trichy–Chennai national...Read More
|
|
Construction of 6-lane access-controlled highway from ch 15+100 of Ambala–Chandigarh section of NH-205A and terminating at ch 2+500 of Zirakpur Bypass.
Construction of 6-lane access-controlled highway from ch 15+100 of
Ambala–Chandigarh section of NH-205A and terminating at ch 2+500 of
Zirakpur Bypass.
Ceigall India's...Read More
|
|
Metro Rail
|
|
|
Kochi Metro Rail project Phase II
There are currently proposals to extend the metro to Thrikkakara, Kakkanad,
Angamaly, Nedumbassery and west Kochi region, including Vypeen
islands.
On 11 September...Read More
|
|
BMRCL plans to develop Metro Phase III.
BMRCL plans to develop 133-km Metro Phase III.
Package 1 consist of
constructions between Silk Board and Bellandur (four Metro stations)
running to...Read More
|
|
Roadways
|
|
|
Hyderabad Metropolitan Development Authority is planning a Regional Ring Road
Hyderabad Metropolitan Development Authority is planning a
Regional Ring
Road (RRR) in dist. Hyderabad, Andhra Pradesh.
The RRR alignment has
been planned to run...Read More
|
|
Iron & Steel
|
|
|
Jay Bharat Steel Corporation plans to set up an integrated steel plant in dist. Kutch, Gujarat
Jay Bharat Steel Corporation plans to set up an integrated steel plant in
dist. Kutch, Gujarat
Jan 2015 : Work on project...Read More
|
|
Sri Venkatesh Iron & Alloy plans to set up a billet caster unit at Lapanga, Ramgarh in Hazaribagh
Sri Venkatesh Iron & Alloy (India) plans to set up a billet caster unit in
at Lapanga village, Ramgarh in Hazaribagh...Read More
|
|
Godawari Power and Ispat plans for integrated steel plant in Chhattisgarh.
.Godawari Power and Ispat plans for integrated steel plant in
Chhattisgarh.
The estimated capital outlay would be around Rs. 3,000 to
Rs. 4,000...Read More
|
|
Krishna Godavari Power Utilities plans for Integrated Ferro alloy & steel complex at Nalgonda dist, Telangana.
Krishna Godavari Power Utilities plans for Integrated Ferro Alloy & Steel
complex at Irikigudem village, Dhamarcharla Mandal, Nalgonda dist,
Telangana.
Environmental clearance is...Read More
|
|
Nirbhaya Industries is setting up expansion of existing plant by installing a DRI plant at Bhandara.
Nirbhaya Industries is setting up expansion of existing plant by installing
a DRI plant at Bhandara.
installing a DRI Plant with a...Read More
|
|
Electrosteel Castings plans to establish ductile iron pipe manufacturing plant in Dhenkanal, Odisha.
Electrosteel Castings plans to establish ductile iron pipe manufacturing
plant in Dhenkanal, Odisha.
The high-level clearance authority (HLCA)
meeting chaired by Chief Minister...Read More
|
|
Icon Steel India plans to set up a sponge iron unit in Chandrapur, Maharashtra.
Icon Steel India plans to set up a sponge iron unit in Chandrapur,
Maharashtra.
The Maharashtra government signed MoU with company on...Read More
|
|
Kay Ell Dee Metaliks is plans to set up proposed expansion of its steel manufacturing unit at Mandi Gobindgarh
Kay Ell Dee Metaliks is plans to set up proposed expansion of its steel
manufacturing unit at Mandi
Gobindgarh
from 84,000 TPA
to...Read More
|
|
Giridhan Metal is setting up Ferro Alloys Plant at Jamuria
Giridhan Metal is setting up Ferro Alloys Plant at Jamuria
proposed a
submerged arc furnace facility with a maximum capacity of
0.108616 MTPA
covering...Read More
|
|
WHR/Cogeneration
|
|
|
Jay Bharat Steel Corporation plans to set up WHR-based power project in Kutch
Jay Bharat Steel Corporation plans to set up WHR-based power project in
Kutch
Jan 2015: The work on project is still in...Read More
|
|
Minerals
|
|
|
Arpit Marble plans to set up an opencast limestone mining unit at Dhaniwara, Jamwa Ramgarh
Arpit Marble plans to set up an opencast limestone
mining unit at Village
Dhaniwara, Tehsil Jamwa Ramgarh, dist.
Jaipur, Rajasthan
May 2017 :
Project is...Read More
|
|
Cement
|
|
|
My Home Industries is setting up Grinding unit at Kalinganagar
My Home Industries is setting up Grinding unit at Kalinganagar. The company
has received State level clearance for the project.
May 2017...Read More
|
|
Nuvoco Vistas Corporation is setting up cement unit in Kutch.
Nuvoco Vistas Corporation is setting up cement capacity to around 35 MMTPA
unit in Kutch....Read More
|
|
Star Cement is setting up clinker mfg project at Umrangso, East Jaintia Hills.
Star Cement is setting up clinker mfg project at Umrangso, East Jaintia
Hills.
clinker manufacturing facility with a capacity of 8.0 million...Read More
|
|
Environmental
|
|
|
Musi beautification and rejuvenation project.
Musi beautification and rejuvenation project.
The project requires funds
worth Rs 4,000 crore. At present, only 50 percent of the 1,400 MLD...Read More
|
|
Port
|
|
|
JNPT plans Vadhavan Port in Palghar dist, Maharashtra.
JNPT plans Vadhavan Port in Palghar dist, Maharashtra.
The Port has
appointed Consultant for EIA study and preparation of Detailed Project
Report (DPR)...Read More
|
|
Building
|
|
|
Construction of a district correctional home at Nimtauri in Midnapore
Construction of a district correctional home at Nimtauri in Midnapore
district of West Bengal.
Nov 2018 : Work on project is
under-construction
April 2019...Read More
|
|
Modi’s Navnirman is setting up redevelopment of shri siddhivinayak towers in Malad.
Modi’s Navnirman is setting up redevelopment of shri siddhivinayak towers
in Malad.
Project is still in planning stage due to Environmental
clearances ,...Read More
|
|
Solid Waste recyling
|
|
|
Implementation of Jalandhar solid waste project in Jalandhar.
Implementation of Jalandhar solid waste project in Jalandhar.
The
project worth Rs. 73 crore received a final clearance under the Smart City
project...Read More
|
|
Construction of Waste Collection and Transport Services in MC Uchana
Construction of Waste Collection and Transport Services in MC
Uchana
Selection of agency for door-to-door collection and segregation
of municipal solid waste...Read More
|
|
Biotic Waste Limited is plans to set up Common Biomedical Waste Treatment Facility unit in C S Nagar Maharashtra
Biotic Waste Limited is plans to set up Common Biomedical Waste Treatment
Facility unit in C S Nagar Maharashtra
), which...Read More
|
|
Apartment
|
|
|
Brigade Group plans to develop 'Brigade Citadel' in Hyderabad, Telangana.
Brigade Group plans to develop Brigade Citadel, an 11-plus acre residential
project in Moti Nagar, Hyderabad, Telangana.
Brigade Citadel in
Hyderabad comprises over...Read More
|
|
Harivishva Developers is constructing residential complex 'Harivishva Infinia' in Pune district of Maharashtra.
Harivishva Developers is constructing a residential complex 'Harivishva
Infinia' in Pune district of Maharashtra.
The project will see
construction of three buildings...Read More
|
|
Rajhans Nutriments is planning to develop a residential complex Rajhans Zorista in Surat dist, Gujarat.
Rajhans Nutriments is planning to develop a residential complex Rajhans
Zorista at Vesu in Surat dist, Gujarat.
The project will include...Read More
|
|
Shree Krishna Realcon is setting up Quintessa project is coming up at Manicktala Kolkata.
Shree Krishna Realcon is setting up Quintessa project is coming up at
Manicktala Kolkata.
April 2024 : Project work is under construction
just...Read More
|
|
Wave Group plans a new luxury housing project township named 'Eden' in Ghaziabad, Uttar Pradesh.
Wave Group plans a new luxury housing project township named 'Eden' in
Ghaziabad, Uttar Pradesh.
The project named Eden would be...Read More
|
|
Textile
|
|
|
Construction of textile dyeing and printing centre at Nadukani, Kannur.
Construction of textile dyeing and printing centre at Nadukani,
Kannur.
Bids are invited for appointment of consultant for setting up a
brand new...Read More
|
|
Automobile
|
|
|
Ultraviolette Automotive plans a Electric Vehicle production facility in Karnataka.
Ultraviolette Automotive plans a Electric Vehicle production facility in
Karnataka.
Mar 2026: Company has plans a capacity of 1.5 lakh units...Read More
|
|
Pipe Line
|
|
|
Mumbai-Nagpur-Jharsuguda Gas Pipeline.
The Mumbai-Nagpur-Jharsuguda Gas is a natural gas pipeline in India.
The
pipeline runs from Mumbai to Nagpur (725 km), then from Nagpur...Read More
|
|
Metal
|
|
|
Ferro Alloys Corporation plans to set up an chrome ore beneficiation unit in Jajpur district, Odisha.
Ferro Alloys Corporation plans to set up an chrome ore beneficiation unit
in Jat Tomka village, Danagadi tehsil in Jajpur district...Read More
|
|
Dyes & Pigments
|
|
|
Brizza Chem Private Limited is set up Dye Intermediates unit in Bharuch
Brizza Chem Private Limited is set up Dye Intermediates unit in
Bharuch, Gujarat
total plot area...Read More
|
|
Jay Chem is setting up dyes and dyes intermediates mfg unit in Sirohi.
Jay Chem is setting up dyes and dyes intermediates mfg unit in Sirohi....Read More
|
|
Drugs & Pharma
|
|
|
Nolvox Pharma is setting up Pharmaceutical APIs, API Intermediates at Gangad, Tal: Bavla, Dist: Ahmedabad.
Nolvox Pharma is setting up Pharmaceutical APIs, API Intermediates and
Preservatives at Vill: Gangad, Tal: Bavla, Dist: Ahmedabad.
Total area
of the project...Read More
|
|
Sypram Healthcare is setting up API mfg unit in Banaskantha.
Sypram Healthcare is setting up API mfg unit in Banaskantha.
Sept 2025 :
Project is still in planning stage due to awaiting...Read More
|
|
Aarti Pharmalabs is setting up API and API intermediate mfg unit in Palghar.
Aarti Pharmalabs is setting up API and API intermediate mfg capacity from
14,688 TPA to 45,641.52 TPA at Palghar....Read More
|
|
Sugar
|
|
|
Shri Balaji Sugars & Chemicals plans to expand its sugar unit in Vijayapura dist, Karnataka.
Shri Balaji Sugars & Chemicals plans to expand its sugar unit at Yeragal
and Madari Village in Muddebihal Taluka, Vijayapura dist,...Read More
|
|
Water Supply
|
|
|
Andaman Public Works Department (APWD) is set up bachra pahar water supply scheme at Chouldari.
Andaman Public Works Department (APWD) is set up bachra pahar water supply
scheme at Chouldari in South Andaman Island
Aug 2023...Read More
|
|
Construction
|
|
|
Central Public Works Department is setting up upgradation works for GPRA Complex in New Delhi.
Central Public Works Department is setting up upgradation works for GPRA
Complex in New
Delhi.
(inclusive of Civil and Electrical Works) under
Service Centre...Read More
|
|
Indian Institute of Management Indore is setting up construction of multistorey hostel blocks at IIM Indore.
Indian Institute of Management Indore is setting up construction of
multistorey hostel blocks at IIM Indore.
Oct 2023 : The project is...Read More
|
|
Sudhapati Developers is setting up Aarya Elenzaa project in Vadodara.
Sudhapati Developers is setting up Aarya Elenzaa project in
Vadodara.
Project is still in planning stage due to govt approvals is
awaited.
March...Read More
|
|
Govt College of Engineering Karad is setting up construction of girls hostel building at Karad.
Govt College of Engineering Karad is setting up construction of girls
hostel building at Karad.
Project is still in planning stage due...Read More
|
|
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds project in Phulgaon.
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds
project in Phulgaon.
March 2025 : Project is still in...Read More
|
|
ITW India is Plans to set up Industrial Sheds at Sanaswadi
ITW India is Plans to set up Industrial Sheds at Sanaswadi
at plot No.
3, 3A and 3B
carved out of...Read More
|
|
Vishal Hegde is setting up construction of an additional college building in Deralakatte, Mangalore.
Vishal Hegde is setting up construction of an additional college building
in the existing Justice K.S. Hegde Medical Academy campus in...Read More
|
|
Dragonstone Realty is setting up building construction project in hotel, residential, and multi-level car parking at Thiruvananthapuram.
Dragonstone Realty is setting up building construction project that will
feature retail, office, hotel, residential, and multi-level car parking at
Thiruvananthapuram.
March 2026...Read More
|
|
U P Irrigation Department is setting up residential building construction under Ken- Betwa Link Project in Banda.
U P Irrigation Department is setting up residential building construction
under Ken- Betwa Link Project in Banda.
Project is still in planning
stage...Read More
|
|
Construction of new Court complex at the headquarters of Kota District Court, Kota.
Construction of new Court complex at
the headquarters of Kota District Court, Kota.
Bids are invited
for the project.
The seven-storey court complex will include modern
courtrooms, administrative spaces, and...Read More
|
|
Herbiside&Pesticide
|
|
|
Agastya Agro is setting up Pesticides mfg unit at Kadechur.
Agastya Agro is setting up pesticides mfg unit at Kadechur.
2161.8
TPA from any 4 technical grade pesticides and any 2...Read More
|
|
Indo Amines is setting up pesticides, pesticides intermediates products in Raigad.
Indo Amines is setting up pesticides, pesticides intermediates, synthetic
organic chemicals, hydrogen, inorganic and blending & formulation products
in Raigad.
March 2025 :...Read More
|
|
Iron & Steel
|
|
|
Jay Bharat Steel Corporation plans to set up an integrated steel plant in dist. Kutch, Gujarat
Jay Bharat Steel Corporation plans to set up an integrated steel plant in
dist. Kutch, Gujarat
Jan 2015 : Work on project...Read More
|
|
Sri Venkatesh Iron & Alloy plans to set up a billet caster unit at Lapanga, Ramgarh in Hazaribagh
Sri Venkatesh Iron & Alloy (India) plans to set up a billet caster unit in
at Lapanga village, Ramgarh in Hazaribagh...Read More
|
|
Godawari Power and Ispat plans for integrated steel plant in Chhattisgarh.
.Godawari Power and Ispat plans for integrated steel plant in
Chhattisgarh.
The estimated capital outlay would be around Rs. 3,000 to
Rs. 4,000...Read More
|
|
Krishna Godavari Power Utilities plans for Integrated Ferro alloy & steel complex at Nalgonda dist, Telangana.
Krishna Godavari Power Utilities plans for Integrated Ferro Alloy & Steel
complex at Irikigudem village, Dhamarcharla Mandal, Nalgonda dist,
Telangana.
Environmental clearance is...Read More
|
|
Nirbhaya Industries is setting up expansion of existing plant by installing a DRI plant at Bhandara.
Nirbhaya Industries is setting up expansion of existing plant by installing
a DRI plant at Bhandara.
installing a DRI Plant with a...Read More
|
|
Electrosteel Castings plans to establish ductile iron pipe manufacturing plant in Dhenkanal, Odisha.
Electrosteel Castings plans to establish ductile iron pipe manufacturing
plant in Dhenkanal, Odisha.
The high-level clearance authority (HLCA)
meeting chaired by Chief Minister...Read More
|
|
Icon Steel India plans to set up a sponge iron unit in Chandrapur, Maharashtra.
Icon Steel India plans to set up a sponge iron unit in Chandrapur,
Maharashtra.
The Maharashtra government signed MoU with company on...Read More
|
|
Kay Ell Dee Metaliks is plans to set up proposed expansion of its steel manufacturing unit at Mandi Gobindgarh
Kay Ell Dee Metaliks is plans to set up proposed expansion of its steel
manufacturing unit at Mandi
Gobindgarh
from 84,000 TPA
to...Read More
|
|
Giridhan Metal is setting up Ferro Alloys Plant at Jamuria
Giridhan Metal is setting up Ferro Alloys Plant at Jamuria
proposed a
submerged arc furnace facility with a maximum capacity of
0.108616 MTPA
covering...Read More
|
|
Alloys
|
|
|
Paavan Steel-Tech is setting up installation of ferro-alloys unit at MIDC Jalna.
Paavan Steel-Tech is setting up installation of ferro-alloys unit at MIDC
Jalna.
project is to set-up of 2000 TPD Billet and 1500...Read More
|
|
Chemical
|
|
|
Eskay Speciality Chemicals is plans to set up Chemical Production in Surat
Eskay Speciality Chemicals is plans to set up Chemical
Production in
Surat
amendment now seeks to increase the production capacity
of
Selenium Sulphide from...Read More
|
|
Henil Chemicals is plans to set up dye and dye intermediates Unit in Bharuch
Henil Chemicals is plans to set up dye and dye
intermediates Unit in
Bharuch
April 2024 : Project is still in planning stage...Read More
|
|
Construction of acetic acid facility at GNFC’s site in Bharuch, Gujarat.
Construction of acetic acid facility at GNFC’s site in Bharuch,
Gujarat.
Gujarat Narmada Valley Fertilizers & Chemicals (GNFC) has
signed a memorandum of...Read More
|
|
Chemforte Drugs is plans to set up API Manufacturing Unit in Gujarat
Chemforte Drugs is plans to set up API Manufacturing Unit in Gujarat
manufacturing
Active Pharmaceutical Ingredients (API) and intermediates
with a capacity of...Read More
|
|
Greenlam Industries is setting up resin mfg unit in Sabarkantha.
Greenlam Industries is setting up resin mfg
unit in
Sabarkantha.
existing
laminate facility at Oran, Prantij Taluka,
Sabarkantha District, Gujarat. The unit aims to produce
3,700...Read More
|
|
Navin Fluorine International is setting up specialty chemicals production at its existing plant in Bhestan, Chorasi Taluk, Surat District.
Navin Fluorine International is setting up specialty chemicals production
at its existing plant in Bhestan, Chorasi Taluk, Surat District.
Project
is still in...Read More
|
|
Global Calcium Private Limited is set up Expansion of API and Mineral Salts unit in Hosur,
Global Calcium Private Limited is set up Expansion of API and Mineral Salts
unit in Hosur, Krishnagiri District
proposed for a...Read More
|
|
Transworld Furtichem is setting up expansion of its chemical mfg plant at Kandla SEZ.
Transworld Furtichem is setting up expansion of its chemical mfg plant at
Kandla SEZ....Read More
|
|
Mechemco Industries is setting up synthetic resin mfg at Patalganga.
Mechemco Industries is setting up synthetic resin mfg at
Patalganga.
expansion of its existing synthetic resin (mixing
and
blending) manufacturing plant of 500 MT/M...Read More
|
|
SRF is setting up a resorcinol–formaldehyde resin in at Manali.
SRF is setting up a resorcinol–formaldehyde resin 25 MT per month in at
Manali....Read More
|
|
Distillary/Alcohol
|
|
|
Greenways Bioenergy plans to setup Grain Based Ethanol unit at Karimnagar in Telangana
Greenways Bioenergy plans to setup Grain Based Ethanol unit at Karimnagar
in Telangana
Ethanol of an alcoholic strength by volume...Read More
|
|
Vikalp Bio and Distillery is setting up CBG plant in Delhi.
Vikalp Bio and Distillery is setting up 12,000-Ton CBG plant in
Delhi.
will manufacture compressed biogas (CBG) with a
capacity of
12,000 tons. The...Read More
|
|
Sant Muktai Sugar is plans to set up grain-based distillery in Jalgaon,
Sant Muktai Sugar And Energy Limited is plans to set up grain-based
distillery in Jalgaon, Maharashtra
March 2025 : Project...Read More
|
|
Oasis Greenfuel is setting up distillery and power plant in Bundi.
Oasis Greenfuel is setting up 180 KLD distillery and 4.5 MW power plant in
Bundi.
Project is still in planning stage due...Read More
|
|
Greenathol Ebiz is setting up greenfield distillery and power project in Khagaria, Bihar.
Greenathol Ebiz is setting up greenfield distillery and power project in
Khagaria, Bihar.
rain-based distillery with a 4.5 MW cogeneration power
plant in...Read More
|
|
NSL Sugars is setting up xpansion of Distillery Project from 500 KLPD to 750 KLPD (Ethanol) at Beed.
NSL Sugars is setting up xpansion of Distillery Project from 500 KLPD to
750 KLPD (Ethanol) at Beed....Read More
|
|
Solar
|
|
|
Geotechnical investigation for the Raghunathpur Power Project Phase II
Geotechnical investigation for the Raghunathpur Power Project Phase
II
June 2024 : Project is still in planning stage due to green
clearances is...Read More
|
|
Development of 300 MW solar projects (Phase-II) across Maharashtra.
Development of 300 MW solar projects (Phase-II) across Maharashtra.
Bids
are invited for the project.
As per the tender, the projects must be
implemented...Read More
|
|
Commercial Complex
|
|
|
Classic Promoters & Builders is setting up solitaire world project at Bibwewadi, Pune..
Classic Promoters & Builders is setting up solitaire world project at
Pune.
Project is still in planning stage due to awaiting for...Read More
|
|
Engineering
|
|
|
Travancore Titanium Products is setting up engineering design of plaster of paris plant in Thiruvananthapuram.
Travancore Titanium Products is setting up engineering design of plaster of
paris plant in Thiruvananthapuram.
Project is still in planning stage
due to...Read More
|
|
Construction
|
|
|
Central Public Works Department is setting up upgradation works for GPRA Complex in New Delhi.
Central Public Works Department is setting up upgradation works for GPRA
Complex in New
Delhi.
(inclusive of Civil and Electrical Works) under
Service Centre...Read More
|
|
Indian Institute of Management Indore is setting up construction of multistorey hostel blocks at IIM Indore.
Indian Institute of Management Indore is setting up construction of
multistorey hostel blocks at IIM Indore.
Oct 2023 : The project is...Read More
|
|
Sudhapati Developers is setting up Aarya Elenzaa project in Vadodara.
Sudhapati Developers is setting up Aarya Elenzaa project in
Vadodara.
Project is still in planning stage due to govt approvals is
awaited.
March...Read More
|
|
Govt College of Engineering Karad is setting up construction of girls hostel building at Karad.
Govt College of Engineering Karad is setting up construction of girls
hostel building at Karad.
Project is still in planning stage due...Read More
|
|
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds project in Phulgaon.
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds
project in Phulgaon.
March 2025 : Project is still in...Read More
|
|
ITW India is Plans to set up Industrial Sheds at Sanaswadi
ITW India is Plans to set up Industrial Sheds at Sanaswadi
at plot No.
3, 3A and 3B
carved out of...Read More
|
|
Vishal Hegde is setting up construction of an additional college building in Deralakatte, Mangalore.
Vishal Hegde is setting up construction of an additional college building
in the existing Justice K.S. Hegde Medical Academy campus in...Read More
|
|
Dragonstone Realty is setting up building construction project in hotel, residential, and multi-level car parking at Thiruvananthapuram.
Dragonstone Realty is setting up building construction project that will
feature retail, office, hotel, residential, and multi-level car parking at
Thiruvananthapuram.
March 2026...Read More
|
|
U P Irrigation Department is setting up residential building construction under Ken- Betwa Link Project in Banda.
U P Irrigation Department is setting up residential building construction
under Ken- Betwa Link Project in Banda.
Project is still in planning
stage...Read More
|
|
Construction of new Court complex at the headquarters of Kota District Court, Kota.
Construction of new Court complex at
the headquarters of Kota District Court, Kota.
Bids are invited
for the project.
The seven-storey court complex will include modern
courtrooms, administrative spaces, and...Read More
|
|
Quary
|
|
|
Anupam Agarwal is setting up flagstone quarry project at Achholi village, Mahasamund.
Anupam Agarwal is setting up flagstone quarry project at Achholi village,
Mahasamund, Chhattisgarh.
The project involves a quarry lease area of
0.98...Read More
|
|
Devi Mines & Minerals is setting up production of decorative stone from the Toyaput decorative stone deposit.
Devi Mines & Minerals is setting up production of decorative stone from the
Toyaput decorative stone deposit in Orissa
over an area...Read More
|
|
Synthetic Chemicals
|
|
|
Pearl Colours Industries is setting up synthetic organic chemicals in Vapi, Tal.: Pardi, Dist.: Valsad.
Pearl Colours Industries is setting up synthetic organic chemicals in Vapi,
Tal.: Pardi, Dist.: Valsad.
March 2025 : Project is still in...Read More
|
|
Shekhawati Global Chemicals is setting up epoxy resin plant at RIICO Parbatsar.
Shekhawati Global Chemicals is setting up epoxy resin plant at RIICO
Parbatsar.
The project has a plot area of 4,030 sq m...Read More
|
|
Canals
|
|
|
Numaligarh Refinery is plans to set up EOT Cranes-Catalyst Handling at Golaghat, Assam
Numaligarh Refinery is plans to set up EOT Cranes-Catalyst Handling at
Golaghat, Assam
March 2026: Project is still in planning stage...Read More
|
|
Auto Ancillaries
|
|
|
Maruti Suzuki is plans to establish second car manufacturing plant at Khoraj Industrial Estate in Gujarat.
Maruti Suzuki is plans to establish second car manufacturing plant at
Khoraj Industrial Estate in Gujarat.
with a capacity to produce...Read More
|
|
Construction
|
|
|
Central Public Works Department is setting up upgradation works for GPRA Complex in New Delhi.
Central Public Works Department is setting up upgradation works for GPRA
Complex in New
Delhi.
(inclusive of Civil and Electrical Works) under
Service Centre...Read More
|
|
Indian Institute of Management Indore is setting up construction of multistorey hostel blocks at IIM Indore.
Indian Institute of Management Indore is setting up construction of
multistorey hostel blocks at IIM Indore.
Oct 2023 : The project is...Read More
|
|
Sudhapati Developers is setting up Aarya Elenzaa project in Vadodara.
Sudhapati Developers is setting up Aarya Elenzaa project in
Vadodara.
Project is still in planning stage due to govt approvals is
awaited.
March...Read More
|
|
Govt College of Engineering Karad is setting up construction of girls hostel building at Karad.
Govt College of Engineering Karad is setting up construction of girls
hostel building at Karad.
Project is still in planning stage due...Read More
|
|
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds project in Phulgaon.
Fulgaon Khule Phase I Industrial Park Llp is setting up industrial sheds
project in Phulgaon.
March 2025 : Project is still in...Read More
|
|
ITW India is Plans to set up Industrial Sheds at Sanaswadi
ITW India is Plans to set up Industrial Sheds at Sanaswadi
at plot No.
3, 3A and 3B
carved out of...Read More
|
|
Vishal Hegde is setting up construction of an additional college building in Deralakatte, Mangalore.
Vishal Hegde is setting up construction of an additional college building
in the existing Justice K.S. Hegde Medical Academy campus in...Read More
|
|
Dragonstone Realty is setting up building construction project in hotel, residential, and multi-level car parking at Thiruvananthapuram.
Dragonstone Realty is setting up building construction project that will
feature retail, office, hotel, residential, and multi-level car parking at
Thiruvananthapuram.
March 2026...Read More
|
|
U P Irrigation Department is setting up residential building construction under Ken- Betwa Link Project in Banda.
U P Irrigation Department is setting up residential building construction
under Ken- Betwa Link Project in Banda.
Project is still in planning
stage...Read More
|
|
Construction of new Court complex at the headquarters of Kota District Court, Kota.
Construction of new Court complex at
the headquarters of Kota District Court, Kota.
Bids are invited
for the project.
The seven-storey court complex will include modern
courtrooms, administrative spaces, and...Read More
|
|
Convention Centre
|
|
|
Development of Rajasthan Mandapam Convention Centre in Rajasthan.
Development of Rajasthan Mandapam Convention Centre in
Rajasthan.
Government-owned NBCC has bagged an order for the
development of the Rajasthan Mandapam Convention...Read More
|
|
Greenpark Hotels And Resorts is setting up additional convention centre at forum vijaya complex at Chennai.
Greenpark Hotels And Resorts is setting up additional convention centre at
forum vijaya complex at Chennai.
Project is still in planning stage
due...Read More
|
|
Agro Chemicals
|
|
|
Golden Sun Agro Foods is setting up melamine and urea formaldehyde resins and molding unit in Dhaturi, Sonipat District.
Golden Sun Agro Foods is setting up melamine
and urea formaldehyde resins
and molding compound mfg unit in Dhaturi, Sonipat District,
Haryana.
Environmental clearances...Read More
|
|
Battery
|
|
|
TDK Corporation has launched a lithium-ion battery manufacturing plant in Sohna, Haryana.
TDK Corporation has launched a lithium-ion battery manufacturing plant in
Sohna, Haryana.
This ₹3,000 crore facility is set to produce 200
million battery...Read More
|
|
Warehouse/Cold store
|
|
|
Finley Marine Products is plans to set up expansion of an industrial shed Unit at Tirunelveli
Finley Marine Products is plans to set up expansion of an industrial shed
Unit at Tirunelveli
expansion of an industrial...Read More
|
|
Vishal Vividh Karyakari Seva Sahakari Sanstha is setting up construction of a new warehouse at Latur.
Vishal Vividh Karyakari Seva Sahakari Sanstha is setting up construction of
a new warehouse at Latur.
Warehouse (1035 MT) and Shed (239.25...Read More
|
|
Industrial Gases
|
|
|
Giridhan Metal Private Limited is plans to set up Oxygen Plant at Jamuria
Giridhan Metal Private Limited is plans to set up Oxygen Plant at
Jamuria
proposed an oxygen plant with a capacity of 0.066...Read More
|
|
Transmission
|
|
|
UP Power Transmission Corporation is setting up 400 kV Banda–Chitrakoot Transmission Line.
UP Power Transmission Corporation is setting up 400 kV Banda–Chitrakoot
Transmission Line....Read More
|
|
Pump Station
|
|
|
Madhya Pradesh Urja Vikas Nigam is setting up Solar Water Pump Supply under PM-KUSUM.
Madhya Pradesh Urja Vikas Nigam is setting up Solar Water Pump Supply under
PM-KUSUM....Read More
|
|
Building Material
|
|
|
Giridhan Metal is setting up slag grinding unit at Paschim Bardhaman.
Giridhan Metal is setting up slag grinding unit with a capacity of 0.396
MTPA at Paschim Bardhaman.
Project is under-construction and expected...Read More
|
|
Generation
|
|
|
Sidhe Petrochemicals is setting up cogeneration power plant at Bhimasar, Kutch.
Sidhe Petrochemicals is setting up 14 MW cogeneration power plant at
Bhimasar, Kutch.
proposed synthetic organic
chemicals manufacturing
facility along with a 14 MW...Read More
|
|
Energy
|
|
|
NTPC has plans to set up a facility in Amaravati, Andhra Pradesh.
NTPC has plans to set up a facility in Amaravati, Andhra Pradesh.
The
firm has signed a lease agreement with Andhra Pradesh...Read More
|
|
TDK Corporation plans to establish a new Battery Energy Storage System (BESS) plant in Haryana.
TDK Corporation plans to establish a new Battery Energy Storage System
(BESS) plant in Haryana.
This investment strengthens the state’s
position in renewable...Read More
|
|
Medical & Surgicals
|
|
|
Polymatech Electronics plans to expand medical device manufacturing in SIPCOT Medical Devices Park, Oragadam, Chennai.
Polymatech Electronics plans to expand medical device manufacturing in
SIPCOT Medical Devices Park, Oragadam, Chennai.
Company has secured a
99-year lease for a...Read More
|
|
Energy
|
|
|
NTPC has plans to set up a facility in Amaravati, Andhra Pradesh.
NTPC has plans to set up a facility in Amaravati, Andhra Pradesh.
The
firm has signed a lease agreement with Andhra Pradesh...Read More
|
|
TDK Corporation plans to establish a new Battery Energy Storage System (BESS) plant in Haryana.
TDK Corporation plans to establish a new Battery Energy Storage System
(BESS) plant in Haryana.
This investment strengthens the state’s
position in renewable...Read More
|
|
Road/Highway
|
|
|
4-lane greenfield highway between Mokama and Munger in Bihar.
4-lane greenfield highway between Mokama and Munger in Bihar.
Sept 2025:
The Cabinet Committee on Economic Affairs (CCEA) has approved the
project.
Union Minister...Read More
|
|
Construction of elevated rotary (flyover) and three Vehicular Underpasses (VUPs) at G Corner, Y-junction, Maruthi Nagar, and Sanjeevi Nagar along the Trichy–Chennai national highway.
Construction of elevated rotary (flyover) and three Vehicular Underpasses
(VUPs) at G Corner, Y-junction, Maruthi Nagar, and Sanjeevi Nagar along
Trichy–Chennai national...Read More
|
|
Construction of 6-lane access-controlled highway from ch 15+100 of Ambala–Chandigarh section of NH-205A and terminating at ch 2+500 of Zirakpur Bypass.
Construction of 6-lane access-controlled highway from ch 15+100 of
Ambala–Chandigarh section of NH-205A and terminating at ch 2+500 of
Zirakpur Bypass.
Ceigall India's...Read More
|
|
Rail-road
|
|
|
New Jaipur–Rewari Rail Line Project.
New Jaipur–Rewari Rail Line Project.
The Railway Board has approved
the final location survey for a new rail line from Rewari to...Read More
|
|
Mining
|
|
|
Kolgaon Expansion Deep Open Cast (OC) Mine.
Kolgaon Expansion Deep Open Cast (OC) Mine.
Bids are invited for the
handling, transport, and other mining services at the Kolgaon Expansion
deep...Read More
|
|
Development of Itauri-Jharkua limestone block in Panna dist, Madhya Pradesh.
Development of Itauri-Jharkua limestone block in Panna dist, Madhya
Pradesh.
The block spans 350 hectares.
J K Cement Ltd has been
declared the "Preferred...Read More
|
|
Development of Dommarnandyala Block-3 limestone mining in YSR Kadapa dist, Andhra Pradesh.
Development of Dommarnandyala Block-3 limestone mining in YSR Kadapa dist,
Andhra Pradesh.
J K Cement Limited has been declared the preferred
bidder for...Read More
|
|
Infrastructure
|
|
|
Construction of double-decker elevated corridor between LB Nagar and Hayatnagar on NH-65 stretch.
Construction of double-decker elevated corridor between LB Nagar and
Hayatnagar on NH-65 stretch.
Telangana’s Roads and Buildings
Minister, Komatireddy Venkat Reddy,has...Read More
|
|
Railway
|
|
|
Construction of rail-over-rail (RoR) flyover to facilitate connectivity for the Kosamba–Umrapada gauge conversion section in Gujarat.
Construction of rail-over-rail (RoR) flyover to facilitate connectivity for
the Kosamba–Umrapada gauge conversion section in Gujarat.
The Ministry
of Railways has approved a...Read More
|
|
Development of rail bypass at Bhagalpur (Eastern Railway) in Bihar.
Development of rail bypass at Bhagalpur (Eastern Railway) in
Bihar.
Ministry of Railways has approved the project.
The Bhagalpur
rail bypass project, costing around...Read More
|
|
Railway
|
|
|
Construction of rail-over-rail (RoR) flyover to facilitate connectivity for the Kosamba–Umrapada gauge conversion section in Gujarat.
Construction of rail-over-rail (RoR) flyover to facilitate connectivity for
the Kosamba–Umrapada gauge conversion section in Gujarat.
The Ministry
of Railways has approved a...Read More
|
|
Development of rail bypass at Bhagalpur (Eastern Railway) in Bihar.
Development of rail bypass at Bhagalpur (Eastern Railway) in
Bihar.
Ministry of Railways has approved the project.
The Bhagalpur
rail bypass project, costing around...Read More
|
|
Speciality Chemicals
|
|
|
New Alliance Fine Chem is setting up synthetic and inorganic chemicals unit at Tarapur.
New Alliance Fine Chem is setting up synthetic and inorganic chemicals unit
at Tarapur.Maharashtra
.
project involves production of 1,119 TPM
synthetic organic...Read More
|
|
Education
|
|
|
JSS Mahavidya Peetha is setting up construction of a new academic and administrative block at Mysuru.
JSS Mahavidya Peetha is setting up construction of a new academic and
administrative block at Mysuru....Read More
|
|
Creative Education Foundation Moodbidri is setting up educational campus project with hostels and auditorium at Udupi.
Creative Education Foundation Moodbidri is setting up educational campus
project with hostels and auditorium at Udupi Karnataka.
Creative PU
College,
Creative Global School, hostels,...Read More
|
|
Sandip Foundation is setting up medical college and research centre at Nashik.
Sandip Foundation is setting up medical college and research centre at
Nashik.
Environmental clearance is sought...Read More
|
|
Sathyabama Institute Of Science And Technology Trust is setting up construction of educational institution buildings at Chennai.
Sathyabama Institute Of Science And Technology Trust is setting up
construction of educational
institution buildings at Chennai....Read More
|
|
School
|
|
|
Navrachana Education Society is setting up Navrachana University and School at Vadodara.
Navrachana Education Society is setting up Navrachana University and school
at Vadodara....Read More
|
|
Hospital
|
|
|
Directorate of Medical Education, Training & Research is setting up 100-bedded district hospital as per NMC norms at Papum Pare.
Directorate of Medical Education, Training & Research is setting up
100-bedded district hospital as per NMC norms at Papum
Pare.
Establishment of a...Read More
|
|
Ram Krishna Educational Trust For Youth is setting up medical college and hospital project at Patna.
Ram Krishna Educational Trust For Youth is setting up medical college and
hospital project at Patna.
Project is still in planning stage...Read More
|
|
College
|
|
|
PWD is setting up medical college and hospital /lab block at SKIMS Bemina
PWD is setting up college/lab block at SKIMS
Bemina
Project is still in
planning stage due to tendering process is going on....Read More
|
|
Sports Complex
|
|
|
Omaxe Group plans to develop massive sports hub in Dwarka, Delhi.
Omaxe Group plans to develop massive sports hub in Dwarka, Delhi.
The
developer is looking for a consultation with the Delhi government...Read More
|
|
Hotel
|
|
|
Infrasouk Llp is setting up hotel development project at Kant Kalwar.
Infrasouk Llp is setting up hotel development project at Kant
Kalwar.
The project is planned over a total
plot area of 24,081.11 sq...Read More
|
|
Hospitality
|
|
|
Shri Vinayaka Expo Plaza Llp is setting up hotel and commercial shops at Gautam Buddha Nagar.
Shri Vinayaka Expo Plaza Llp is setting up commercial complex comprising a
hotel and commercial shops at Gautam Buddha Nagar.