| Total 138 projects are covered in this issue. Updated between Dec 14- Dec 21 24 |
|
Road/Highway
|
|
|
Jaipur Ring road Project.
Ring Road around Jaipur was conceived by PWD in December 2000 on BOT basis.
In Phase I & II, a road...Read More
|
|
Upgradation of Nashik Peth Road NH-848 in Ghat Section.
The project envisages upgradation of Nashik Peth Road NH No 848 in Ghat
Section of Forest Length (Km 38-970 to Km...Read More
|
|
Implementation of Amritsar-Jamnagar Economic Corridor.
Implementation of Amritsar-Jamnagar Economic Corridor.
G R Infraprojects
has emerged as the lowest (L1) bidder for development of six-lane
Amritsar-Bathinda greenfield section of...Read More
|
|
2-lane upgradation of Patranga to Bahuvan Madar Majha stretch of NH-227B (84 Kosi Parikrama Marg) in Uttar Pradesh.
2-lane upgradation of Patranga to Bahuvan Madar Majha stretch of NH-227B
(84 Kosi Parikrama Marg) in Uttar Pradesh.
Bids are invited for...Read More
|
|
MRT&H is setting up pgradation of Sidhi-Singrauli Road to a four- lane configuration at Sidhi.
Ministry of Road Transport and Highways is setting up pgradation of
Sidhi-Singrauli Road to a four- lane configuration at Sidhi....Read More
|
|
MOIL is setting up construction of Tar road in Camp Area Gumgaon Mine.
MOIL is setting up construction of Tar road in Camp Area Gumgaon
Mine.
Project is still in planning stage due to tendering...Read More
|
|
MRT&H is setting up construction of box drain and CC Drains on Washim Dastapur Karanja road NH 161E at Pusad Naka Dist Washim in
Ministry of Road Transport and Highways is setting up construction of box
drain and CC Drains on Washim Dastapur Karanja road...Read More
|
|
PWD Maharashtra is setting up Daulatabad T Point to Khultabad Section
PWD Maharashtra is setting up maintenance of Daulatabad T Point to
Khultabad section of NH 752 H Km 96 000 to...Read More
|
|
Kotputli-Agra Greenfield Expressway.
Kotputli-Agra Greenfield Expressway.
Union Road Transport and Highways
Minister Nitin Gadkari on 10 December has approved Rs. 6,800 crore for
Kotputli-Agra Greenfield Expressway...Read More
|
|
Widening and upgrading the Shangshak-Tengnoupal Road (Package-3) section of National Highway-102A.
Widening and upgrading the Shangshak-Tengnoupal Road (Package-3) section of
National Highway-102A.
The government has approved the project....Read More
|
|
2-lane configuration with a hard shoulder from Khonglo to Kasom-Khullen in Manipur.
2-lane configuration with a hard shoulder from from Khonglo to
Kasom-Khullen in Manipur.
The government has approved the project.
...Read More
|
|
Upgradation of 4-lane National Highway connecting the Jawale-Borgaon Kale section in Maharashtra.
Upgradation of 4-lane National Highway connecting the Jawale-Borgaon Kale
section in Maharashtra.
The Ministry of Road Transport and Highways
(MoRTH) has approved the...Read More
|
|
Metro Rail
|
|
|
Bhopal Metro Project phase I
The Bhopal Metro is a rapid transit proposed for the city of Bhopal, India.
The total system consists of 3 corridors...Read More
|
|
Solid Waste recyling
|
|
|
Satarem Ent plans to set up a integrated municipal SWM facility & a solid waste-based IPP
The project envisages a 1000 TPD integrated municipal
solid waste
management facility and a 2x14.5 MW municipal solid waste-based IPP at
Goruru Village,...Read More
|
|
Dharma Earth Care is setting up common bio medical waste treatment facility (CBMWTF) at Maddikunta
Dharma Earth Care is setting up common bio medical waste treatment facility
(CBMWTF) at Maddikunta village, Sangareddy.
d New Project of Common...Read More
|
|
Process Industries
|
|
|
RKS Techno Vision Engineering plans to set up Ethonal unit in Prakasam
RKS Techno Vision Engineering Pvt. Ltd. plans to set up ethonal unit in
Prakasam
Dec 2024 : Project is still in planning...Read More
|
|
Manufacturing
|
|
|
Premier Explosives plans to set up solid propellant unit in AP.
Premier Explosives plans to set up solid propellant unit in AP.
Premier
Explosives Ltd. has received a proposal for land allotment in...Read More
|
|
Construction of a cutting-edge manufacturing facility in Sri City, Andhra Pradesh.
Construction of a cutting-edge manufacturing facility in Sri City, Andhra
Pradesh.
With an estimated investment of 191 INR-Crore, the plant spans
an anticipated...Read More
|
|
Krones plans to set up a manufacturing facility at Vemagal Industrial Park Phase 2, in Kolar, Karnataka.
Krones plans to set up a manufacturing facility at Vemagal Industrial Park
Phase 2, in Kolar, Karnataka.
Company has signed a memorandum...Read More
|
|
Dam
|
|
|
Construction of Navnera Barrage (Dam) including HM works, across Kalisindh river
Construction of Navnera Barrage (Dam) including HM works, across Kalisindh
river, near village Abra, Tehsil Digod, Kota, Raj, under ERCP Phase...Read More
|
|
University
|
|
|
Construction of facilities at the Central University of Odisha (CUO).
Development of academic block, library and staff quarters at CUO in
Koraput.
Union Minister of Petroleum and Natural Gas & Steel...Read More
|
|
Distillary/Alcohol
|
|
|
Agribiotech Industries Limited is plans For Expansion Of Grain Based Distillery Unit At Sikar
Agribiotech Industries Limited is plans For Expansion Of Grain Based
Distillery Unit At Sikar, Rajasthan.
From 74 KLP To 120 KLPD And...Read More
|
|
Uddhavesh Urja Ethanol Products Private Limited is plans to set up grain based distilery along with co-gen unit in Satana
Uddhavesh Urja Ethanol Products Private Limited is plans to set up grain
based distilery along with co-gen unit in Satana Nashik...Read More
|
|
Haripriyaa Agro Energy is planning to set up a molasses/juice-based distillery in Satara dist, Maharashtra.
Haripriyaa Agro Energy is planning to set up a molasses/juice-based
distillery at Koregaon in Satara dist, Maharashtra.
The proposed unit
will spread over...Read More
|
|
YTT Industries plans to set up greenfield project of grain based distillery along with Co-generation power plants in Shahjahanpur Dist, Uttar Pradesh.
YTT Industries plans to set up greenfield project of grain based distillery
along with Co-generation power plantslocated at Village- Daranagar Arthari,
Pargana-Jalalabad,...Read More
|
|
A Infrastructure Limited is plans to set up Grain Basel Ethanol Plant alnog with Co- Gen unit in Jabalpur
A Infrastructure Limited is plans to set up Grain Basel Ethanol Plant alnog
with Co- Gen unit in Jabalpur Madhya...Read More
|
|
Yashraaj Ethanoll Processing is setting up grain based distillery from 45 KLPD to 120 KLPD for ethanol production at Satara.
Yashraaj Ethanoll Processing is setting up grain based distillery from 45
KLPD to 120 KLPD for ethanol production at Satara.
June 2024...Read More
|
|
Yogeshwari Sugar Industries is setting up Molasses based distillery at Parbhani.
Yogeshwari Sugar Industries is setting up 110 KLPD Molasses based
distillery at Parbhani.
June 2024 : Project is still in planning stage
and...Read More
|
|
Development of 400 KLPD Molasses/Sugarcane syrup based distillery at Solapur.
400 KLPD Molasses/Sugarcane syrup based distillery at Solapur.
Expansion
of existing Sugar plant from 6000 TCD to 12000 TCD, Cogeneration power
plant from...Read More
|
|
Energen Biotech LLP is plans to set up grain-based distillery at Bavla Gujarat.
Energen Biotech LLP is plans to set up grain-based distillery at Bavla
Gujarat.
June 2024 : Project is still in planning stage...Read More
|
|
Gayatri Sugars Limited is plans to set up Distillery unit in Kamareddy
Gayatri Sugars Limited is plans to set up Distillery unit in Kamareddy
District
proposed greenfield 1x100 KLPD Distillery unit
along with 3.3
MW Cogeneration...Read More
|
|
Malegaon Sahakari Sakha is plans to set up expansion Distillery unit at Shirwali
Malegaon Sahakari Sakha is plans to set up expansion Distillery unit at
Shirwali
The Malegaon Sahakari Sakhar Karkhana...Read More
|
|
Dhampur Sugar Mills Plans Major Expansion in Sambhal, UP
Dhampur Sugar Mills Limited is proposing a significant expansion of its
existing sugar unit in
Sambhal, Uttar Pradesh. The expansion includes
increasing...Read More
|
|
HPCL Renewable is plans to set up CBG and Ethanol Plant in Eluru
HPCL Renewable is plans to set up CBG and Ethanol Plant in Eluru
HPCL is proposing a greenfield project for a Compressed BioGas (CBG) plant and ethanol
production
facility in Denduluru, Eluru...Read More
|
|
Chemical
|
|
|
Aquapharm Chemicals plans to set up an proposed synthetic organic chemicals mfg unit in Mahad.
Aquapharm Chemicals plans to set up an proposed synthetic organic chemicals
manufacturing unit in Mahad.
proposed Unit will have a total...Read More
|
|
Virgo Laminates Ltd, is set up resin unit at Behra road, in Barwala,Haryana
Virgo Laminates Ltd, is set up resin unit at Behra road, in
Barwala,Haryana
Proposed Formaldehyde (300 TPD), Melamine Formaldehyde
Resin (25
TPD) and Cardanol...Read More
|
|
Ruga Lam is plans to set up expansion of chemicals manufacturing unit at Bhachau
Ruga Lam is plans to set up expansion of chemicals manufacturing unit at
Bhachau
June 2024: Project is still in planning stage...Read More
|
|
Pakka Limited is plans to set up Expansion of Paper Production Capacity at Village Parakhan
Pakka Limited is plans to set up Expansion of Paper Production Capacity at
Village Parakhan
Paper Production Capacity from 46,800 TPA to...Read More
|
|
Nagar Parishad Kannod is setting up water supply system including all chemicals in Dewas.
Nagar Parishad Kannod is setting up water supply system including all
chemicals (alum, chlorine, lime, etc. in Dewas.
Project is still in
planning...Read More
|
|
Iron & Steel
|
|
|
Impression Securities plans to set up steel billets/ingots unit Fatehgarh Sahib district of Punjab.
Impression Securities plans to set up steel billets/ingots unit Fatehgarh
Sahib district of Punjab.
H.R. Strips
of 1,40,000 TPA capacity with
two Rolling...Read More
|
|
SBF Ispat is setting up steel plant at Alwar.
SBF Ispat is setting up Steel Plant with existing facility of two induction
furnace (20 Ton each) and Reheating Furnace (30...Read More
|
|
Hindustan Coils is setting up MS billet and rerolled steel products in
Hindustan Coils is setting up induction furnace from Capacity 60,000 TPA to
1,58,400 TPA (MS Billet) and Rerolled Steel Products capacity...Read More
|
|
Satya Power & Ispat Limited is set up Expansion of steel plant capacity in Bilaspur
Satya Power & Ispat Limited is set up Expansion of steel plant capacity in
Bilaspur
expansion of Steel Plant–DRI Kilns
(Sponge...Read More
|
|
HRG Alloys & Steels Private Limited is set up Steel Plant Expansion at Koppal
HRG Alloys & Steels Private Limited is set up Steel Plant Expansion at
Koppal
Expansion of...Read More
|
|
Fedders Electric And Engineering Limited is set up New Iron Ore Beneficiation Plant Proposed in Sundargarh
Fedders Electric And Engineering Limited is set up New Iron Ore
Beneficiation Plant Proposed in Sundargarh
plant will be set...Read More
|
|
Action Ispat and Power Private Limited is set up expansion of Integrated Steel Plant in Jharsuguda
Action Ispat and Power Private Limited is set up
Expansion of
Integrated Steel Plant (from 0.5 MTPA to 7.65...Read More
|
|
Alaknanda Balmukund is plans to set up Expansion project of Sponge Iron plant at Bankura
Alaknanda Balmukund Ispat Private Limited is plans to set up Expansion
project of Sponge Iron plant at Bankura
expansion project of Sponge...Read More
|
|
Apartment
|
|
|
Venkata Praneeth Developers is developing residential villas Praneeth Pranav Grove in Hyderabad dist, Telangana.
Venkata Praneeth Developers is developing residential villas Praneeth
Pranav Grove in Hyderabad dist, Telangana.
The project will include 884
villas along with...Read More
|
|
PK Group is developing a residential-cum-commercial complex 'Hillcrest' in Pune dist, Maharashtra.
PK Group is developing a residential-cum-commercial complex 'Hillcrest' at
Pimple Saudagar in Pune dist, Maharashtra.
The complex will cover over
1.97 acres of...Read More
|
|
Ganguly Home Search is setting up Ganguly 4Sight Eminence project at Garia.
Ganguly Home Search is setting up Ganguly 4Sight Eminence project at
Garia.
Dec 2024 : Construction work is going on...Read More
|
|
Atri Group is setting up Atri Rays project 2, 3 BHK Apartment at Narendrapur, Kolkata.
Atri Group is setting up Atri Rays project 2, 3 BHK Apartment at
Narendrapur, Kolkata.
Dec 2024 : Project...Read More
|
|
Nivasti Developers LLP is setting up Avisaa project in Navi Mumbai.
Nivasti Developers LLP is setting up Avisaa project in Navi
Mumbai
with 37 floors each and just 70 units
Dec 2024 : Project
is...Read More
|
|
Development of Leisure Valley Phase-II residential apartments in Greater Noida, Uttar Pradesh.
Development of Leisure Valley Phase-II residential apartments in Greater
Noida, Uttar Pradesh.
Bids are invited for the project.
The scope of
work covers design,...Read More
|
|
Construction of a multistoried commercial-cum-residential building in Indore, Madhya Pradesh.
Construction of a multistoried commercial-cum-residential building in
Indore, Madhya Pradesh.
Bids are invited for the project.
The
building will come up on CMR-4 at...Read More
|
|
Construction
|
|
|
Romell Group plans a high rise residential complex 'Romell Aria' at Goregaon in Mumbai.
Romell Group plans a high rise residential complex 'Romell Ariana' at
Goregaon in Mumbai.
The project will spread over 1.53 acre of...Read More
|
|
Sun Buildcon Projects LLP is setting up suryansh sanidhya - shivalaya project at Fatewadi.
Sun Buildcon Projects LLP is setting up suryansh sanidhya - shivalaya
project at Fatewadi village, Ahmedabad.
Dec 2024 : Project...Read More
|
|
Fenkin Buildpro Llp is setting up Fenkin 9 commercial building project at Wagle Estate.
Fenkin Buildpro Llp is setting up Fenkin 9 commercial building project at
Wagle Estate.
Dec 2024 : Work on project is...Read More
|
|
Power Grid Corporation of India is setting up construction of multipurpose hall at Arrah District.
Power Grid Corporation of India is setting up construction of multipurpose
hall at Arrah District.
June 2024 : Project is still in...Read More
|
|
ITI Limited is plans to set up Steel Structural Tower Construction at site Tenga RR Hill,
ITI Limited is plans to set up Steel Structural Tower Construction at site
Tenga RR Hill, Arunachal Pradesh
Steel Structural Tower for...Read More
|
|
AIISH is setting up amphitheatre construction at Main Campus, Mysore.
AIISH is setting up amphitheatre construction at Main Campus, Mysore.
...Read More
|
|
Sugar
|
|
|
Meham Co-operative Sugar Mills plans for modernisation & expansion of sugar plant in Rohtak dist, Haryana.
Meham Co-operative Sugar Mills plans for modernisation & expansion of sugar
plant in Rohtak dist, Haryana.
Bids are invited for engineering,
procurement and...Read More
|
|
Biligi Sugar Mill is setting up expansion of the sugar cane crushing unit in Bagalkot.
Biligi Sugar Mill is setting up expansion of the sugar cane crushing unit
from 5000 TCD to 10000 TCD and 30...Read More
|
|
Rope-way / Cable Car
|
|
|
Damodar Ropeways And Infra is setting up Passenger Ropeway at Chauth Mata Temple, Rajasthan
Damodar Ropeways And Infra is setting up Passenger Ropeway at Chauth Mata
Temple, Rajasthan .
June 2024 : Project is still...Read More
|
|
Solid Waste Mgmt
|
|
|
AV Biomedical Waste Service is setting up bio medical waste treatment facility at Sandila, District-Hardoi.
AV Biomedical Waste Service is setting up bio medical waste treatment
facility at Sandila, District-Hardoi.
proposed amendment aims to
secure
approval for the...Read More
|
|
V.M. Techno-Soft is setting up common bio-medical waste treatment facility in Raigarh.
V.M. Techno-Soft is setting up common bio-medical waste treatment facility
in Raigarh.
with capacity of 200 kg/hr Induction plasma Pyrolysis, 200
kg/batch...Read More
|
|
Brundhavana Foundation is szet up New Biomedical Waste Treatment Facility in karnataka
Brundhavana Foundation is szet up New Biomedical Waste Treatment Facility
in karnataka
Environmental clearance is sought for the proposed
establishment of...Read More
|
|
Bio World Waste is setting up common bio medical waste treatment facility in Agra.
Bio World Waste is setting up common bio medical waste treatment facility
in Agra.
Project is still in planning stage due to...Read More
|
|
Uzhavoor Grama Panchayat is setting up Wastewater treatment plant construction for KRNMS Hospital.
Uzhavoor Grama Panchayat is setting up Wastewater treatment plant
construction for KRNMS Hospital.
Project is still in planning stage due
to tendering stage.
...Read More
|
|
Construction
|
|
|
Romell Group plans a high rise residential complex 'Romell Aria' at Goregaon in Mumbai.
Romell Group plans a high rise residential complex 'Romell Ariana' at
Goregaon in Mumbai.
The project will spread over 1.53 acre of...Read More
|
|
Sun Buildcon Projects LLP is setting up suryansh sanidhya - shivalaya project at Fatewadi.
Sun Buildcon Projects LLP is setting up suryansh sanidhya - shivalaya
project at Fatewadi village, Ahmedabad.
Dec 2024 : Project...Read More
|
|
Fenkin Buildpro Llp is setting up Fenkin 9 commercial building project at Wagle Estate.
Fenkin Buildpro Llp is setting up Fenkin 9 commercial building project at
Wagle Estate.
Dec 2024 : Work on project is...Read More
|
|
Power Grid Corporation of India is setting up construction of multipurpose hall at Arrah District.
Power Grid Corporation of India is setting up construction of multipurpose
hall at Arrah District.
June 2024 : Project is still in...Read More
|
|
ITI Limited is plans to set up Steel Structural Tower Construction at site Tenga RR Hill,
ITI Limited is plans to set up Steel Structural Tower Construction at site
Tenga RR Hill, Arunachal Pradesh
Steel Structural Tower for...Read More
|
|
AIISH is setting up amphitheatre construction at Main Campus, Mysore.
AIISH is setting up amphitheatre construction at Main Campus, Mysore.
...Read More
|
|
Apartment
|
|
|
Venkata Praneeth Developers is developing residential villas Praneeth Pranav Grove in Hyderabad dist, Telangana.
Venkata Praneeth Developers is developing residential villas Praneeth
Pranav Grove in Hyderabad dist, Telangana.
The project will include 884
villas along with...Read More
|
|
PK Group is developing a residential-cum-commercial complex 'Hillcrest' in Pune dist, Maharashtra.
PK Group is developing a residential-cum-commercial complex 'Hillcrest' at
Pimple Saudagar in Pune dist, Maharashtra.
The complex will cover over
1.97 acres of...Read More
|
|
Ganguly Home Search is setting up Ganguly 4Sight Eminence project at Garia.
Ganguly Home Search is setting up Ganguly 4Sight Eminence project at
Garia.
Dec 2024 : Construction work is going on...Read More
|
|
Atri Group is setting up Atri Rays project 2, 3 BHK Apartment at Narendrapur, Kolkata.
Atri Group is setting up Atri Rays project 2, 3 BHK Apartment at
Narendrapur, Kolkata.
Dec 2024 : Project...Read More
|
|
Nivasti Developers LLP is setting up Avisaa project in Navi Mumbai.
Nivasti Developers LLP is setting up Avisaa project in Navi
Mumbai
with 37 floors each and just 70 units
Dec 2024 : Project
is...Read More
|
|
Development of Leisure Valley Phase-II residential apartments in Greater Noida, Uttar Pradesh.
Development of Leisure Valley Phase-II residential apartments in Greater
Noida, Uttar Pradesh.
Bids are invited for the project.
The scope of
work covers design,...Read More
|
|
Construction of a multistoried commercial-cum-residential building in Indore, Madhya Pradesh.
Construction of a multistoried commercial-cum-residential building in
Indore, Madhya Pradesh.
Bids are invited for the project.
The
building will come up on CMR-4 at...Read More
|
|
Building Material
|
|
|
Sarveshwari Infratech is setting up sandstone mining project at Sukrit village Robertsganj.
Sarveshwari Infratech is setting up sandstone mining project
at Sukrit
village Robertsganj , District-Sonbhadra, Uttar Pradesh.
May 2024 :
Project is still in...Read More
|
|
Bulk Drug
|
|
|
Vaasavaa Pharmaceuticals is setting up API & intermediates at MIDC-Chincholi.
Vaasavaa Pharmaceuticals is setting up API & intermediates at
MIDC-Chincholi.
July 2023 : They apply for EC. Awaiting for
approvals.
Dec 2024 :...Read More
|
|
Development of bulk drugs and drug Intermediates unit at Piraman.
Bulk Drugs and Drug Intermediates unit at Piraman.
Environmental
clearance is sought for the proposed Bulk Drugs and Drug Intermediates
manufacturing unit in...Read More
|
|
Sano Pharma is setting up bulk drugs mfg unit at Kadechur.
Sano Pharma is setting up bulk drugs mfg unit at Kadechur.
Dec 2024 :
Construction work is going on....Read More
|
|
Railway
|
|
|
Construction of Bengaluru suburban rail project Phase 2.
Construction of Bengaluru suburban rail project Phase 2.
The Karnataka
Rail Infrastructure Development Company (K-RIDE) has put forward a proposal
to extend the...Read More
|
|
Kernex Microsystems India is setting up train collision avoidance systems in Chennai.
Kernex Microsystems India is setting up train collision avoidance systems
in Chennai.
s railway safety technology, has won a substantial
contract
from Integral Coach...Read More
|
|
Construction of rail flyover connecting Rajathgarh, Radhakishorepur, and Machhapur railway stations in Cuttack.
Construction of rail flyover connecting Rajathgarh, Radhakishorepur, and
Machhapur railway stations in Cuttack.
The Ministry of Railways has
sanctioned ₹268.92 crore, for the...Read More
|
|
Construction of rail flyover at Singapur Road Station in Rayagada dist, Odisha.
Construction of rail flyover at Singapur Road Station in Rayagada dist,
Odisha.
The Ministry of Railways has sanctioned ₹240 crore project has
been...Read More
|
|
Doubling of track between Kumbalam and Turavur stations in Ernakulam, Kerala.
Doubling of track between Kumbalam and Turavur stations in Ernakulam,
Kerala.
Bids are invited for the project.
As per work specification,
earth work in...Read More
|
|
Bridge
|
|
|
Construction of High-Level RCC Bridge for Karunya Institute in Karunya Nagar
Construction of High-Level RCC Bridge
for Karunya Institute in Karunya
Nagar
Karunya Institute of Technology and Sciences,
Coimbatore, for the
construction of a...Read More
|
|
Construction of an intermediate lane steel motor bridge over Birahi Ganga river in Badarinath constituency of Chamoli dist, Uttarakhand.
Construction of an intermediate lane steel motor bridge over Birahi Ganga
river in Badarinath constituency of Chamoli dist, Uttarakhand.
Bids are
invited for...Read More
|
|
PWD Maharashtra is setting up reconstruction of substandard major bridges in Aravali-Kante Section on NH-66
PWD Maharashtra is setting up reconstruction of substandard major bridges
in Aravali-Kante Section on NH-66....Read More
|
|
MRT&H is setting up upgradation of BSNL office to railway crossing in Bhandara City
MRT&H is setting up upgradation of BSNL Office to Railway Crossing in
Bhandara City from Chainage Km 168/180 to Km 168/920...Read More
|
|
Department of Water Resources is setting up reconstruction of Head Regulator cum Bridge of Mavi Minor
Department of Water Resources is setting up RD 32480-44720 including
reconstruction of
Head Regulator cum Bridge of Mavi Minor at RD 40180...Read More
|
|
Department of Water Resources is setting up reconstruction of the Fall cum Head Regulator cum Bridge in Karhali Disty.
Department of Water Resources is setting up RD 20650-32480, including the
reconstruction
of the Fall cum Head Regulator cum Bridge of Balbera...Read More
|
|
Water
|
|
|
Madurai City Corporation is setting up development of storm water drainage system in Madurai.
Madurai City Corporation is setting up development of storm water drainage
system in Madurai.
June 2024 : Project is still on planning...Read More
|
|
Development of a water body in SEZ Area of GIFT City, Gandhinagar.
Development of a water body in SEZ Area of GIFT City, Gandhinagar.
Bids
are invited for appointment of a consultant for the...Read More
|
|
Commercial Complex
|
|
|
Siya Lifespaces is setting up residential cum commercial development project at Vishwaraja at Kharghar.
Siya Lifespaces is setting up residential cum commercial development
project at Vishwaraja at Kharghar.
Dec 2024 : Construction work is
going on...Read More
|
|
Pride Purple Group is setting up Park Titan project at Hinjewadi.
Pride Purple Group is setting up Park Titan project at Hinjewadi.
Total
project area is 17 acres. 2, 3 BHK Apartment
configuration. The...Read More
|
|
Mayuri Landmarks is setting up Mayuri Adinath residential project in Pune.
Mayuri Landmarks is setting up Mayuri Adinath residential project in
Pune.
Project is still in planning stage due to awaiting for govt
permission...Read More
|
|
Township
|
|
|
Valuable Properties is setting up integrated township at village Lonivali and Wangani of Panvel Taluka.
Valuable Properties is setting up integrated township at village Lonivali
and Wangani of Panvel Taluka.
Project is still in planning stage due...Read More
|
|
Mining
|
|
|
Dhalawat Mineral is setting up marble mining project in Udaipur.
Dhalawat Mineral is setting up marble mining project in Udaipur.
Marble
(Minor Mineral) mining project (M.L.No.-5/2023, Ref. No. 20221000071670)
covering an area of...Read More
|
|
Jaswant Singh is setting up enhancement of production capacity in Rhyolite mining project at Jodhpur.
Jaswant Singh is setting up enhancement of
production capacity in Rhyolite
mining project at Jodhpur.
Dec 2024 : Project is still in...Read More
|
|
V.D.H Eco Energy is set up Marble Mining Project at Banswara
V.D.H Eco Energy is set up Marble Mining Project at Banswara
The
company is seeking environmental clearance for the Marble Mining...Read More
|
|
Platina Granites is setting up Granite Mining Project at Jhallara village in Udaipur
Platina Granites is setting up Granite Mining Project at Jhallara village
in Udaipur
Dec 2024 : Project is still in...Read More
|
|
Industrial Estate
|
|
|
Rajasthan State Industrial Development & Investment Corporation is setting up development of bichoon Industrial area at Jaipur.
Rajasthan State Industrial Development & Investment Corporation is setting
up development of bichoon Industrial area at Jaipur.
June 2024 : Project
is still...Read More
|
|
IT
|
|
|
TCS Expands Noida ITSEZ Campus at Sector-157
TCS is undertaking the expansion of TCS Noida ITSEZ Campus at Plot No.- 1,
Sector-157, Noida, U.P
Dec 2024 :...Read More
|
|
Warehouse/Cold store
|
|
|
Windson Land Development is set up Warehouse/ Industrial/Logistics/Assembling Park Project in Pune
Windson Land Development is set up Warehouse/
Industrial/Logistics/Assembling Park Project
The environmental
clearance is sought for the Warehouse/ Industrial/...Read More
|
|
Infrastructure
|
|
|
Prayagraj Smart City is setting up surveillance and crowd management system for Prayagraj Maha Kumbh 2025
Prayagraj Smart City is setting up surveillance and crowd management system
for Prayagraj Maha Kumbh 2025
June 2024 : Project is still...Read More
|
|
Establishment of a massive industrial project in Butibori industrial area near Nagpur, Maharashtra.
Establishment of a massive industrial project in the Butibori industrial
area near Nagpur, Maharashtra.
The project worth over Rs. 25,000 crore
involves the...Read More
|
|
Restoration works of Chaurasi Kutiya Swargashram in Gauhari Range Rishikesh.
Restoration works of Chaurasi Kutiya Swargashram in Gauhari Range
Rishikesh.
Bids are invited for the project.
The work specification
includes clearing and grubing, excavation...Read More
|
|
Drugs & Pharma
|
|
|
Construction of API and its intermediates manufacturing plant at Paithan Aurangabad, Maharashtra
Bioaltus Laboratories Private Limited is set up API and its intermediates
manufacturing plant at
Paithan Aurangabad, Maharashtra
June 2024 :
Project is under-construction...Read More
|
|
Quary
|
|
|
Harkood Shri Minerals and Suppliers is setting up laterite stone quarry in Bidar District.
Harkood Shri Minerals and Suppliers is setting up laterite stone quarry in
Bidar District.
June 2024 : Environmental clearances govt approvals is
received...Read More
|
|
Speciality Chemicals
|
|
|
Chemspec Chemicals is plans to set up Specialty Chemicals project at MIDC Mahad
Chemspec Chemicals Private Limited is plans to set up Specialty Chemicals
project at MIDC Mahad
Dec 2024 : Project is still...Read More
|
|
Electrical Products
|
|
|
CMP&DIL is setting up comprehensive civil and electrical maintenance at CMPDI RI-VI, Jayant Singrauli.
CMP&DIL is setting up comprehensive civil and electrical maintenance at
CMPDI RI-VI, Jayant Singrauli.
June 2024 : Project is still in planning
stage...Read More
|
|
Hindustan Shipyard is setting up repairs and maintenance of 47 Nos electrical Cranes as per scope of work at Visakhapatnam.
Hindustan Shipyard is setting up repairs and maintenance of 47 Nos
electrical Cranes as per scope of work at Visakhapatnam.
Project is
still...Read More
|
|
Plastic
|
|
|
Inventaa industries is setting up cultivation of white button mushroom unit in Krishna.
Inventaa industries is setting up cultivation of white button mushroom unit
in Krishna.
June 2024 :Project is under-construction and expected to be
completed...Read More
|
|
Dyes & Pigments
|
|
|
Centre Point Industries is plans to set up Expansion of Dyes Intermediates at Valsad
Centre Point Industries is plans to set up Expansion of Dyes Intermediates
at Valsad
June 2024 : Project is still in planning...Read More
|
|
Fertiliser
|
|
|
Patel Phoschem Ltd is plans to set up expansion of chemical fertilizer plant in khemli,
Patel Phoschem Ltd is plans to set up expansion of chemical fertilizer
plant in khemli,
A chemical fertilizer plant in Khemli,...Read More
|
|
Solar
|
|
|
Rajasthan SolarPark Development Company is setting up construction of Civil and Miscellaneous works for Infrastructure development of Pugal Solar Parks at Dist Bikaner.
Rajasthan SolarPark Development Company is setting up construction of Civil
and Miscellaneous works for Infrastructure development of Pugal Solar Parks
at Dist...Read More
|
|
Border Security Force is setting up solar water heaters at Border outposts in Rajasthan.
Border Security Force is setting up solar water heaters at Border outposts
in Rajasthan....Read More
|
|
Establishment of ground-mounted Solar PV Project at Bidadi in Ramanagara dist, Karnataka.
Establishment of ground-mounted Solar PV Project at Bidadi in Ramanagara
dist, Karnataka.
Bids are invited for the project.
The scope of work
covers complete...Read More
|
|
Roadways
|
|
|
The Fertilisers And Chemicals Travancore is setting up repairing and resurfacing of roads in FACT Udyogamandal Township at Kochi.
The Fertilisers And Chemicals Travancore is setting up repairing and
resurfacing of roads in FACT Udyogamandal Township at Kochi....Read More
|
|
DRDO is setting up special repairs to road at new site orange project in Dundigal.
DRDO is setting up special repairs to road at new site orange project in
Dundigal.
Project is still in planning stage due...Read More
|
|
Road/Highway
|
|
|
Jaipur Ring road Project.
Ring Road around Jaipur was conceived by PWD in December 2000 on BOT basis.
In Phase I & II, a road...Read More
|
|
Upgradation of Nashik Peth Road NH-848 in Ghat Section.
The project envisages upgradation of Nashik Peth Road NH No 848 in Ghat
Section of Forest Length (Km 38-970 to Km...Read More
|
|
Implementation of Amritsar-Jamnagar Economic Corridor.
Implementation of Amritsar-Jamnagar Economic Corridor.
G R Infraprojects
has emerged as the lowest (L1) bidder for development of six-lane
Amritsar-Bathinda greenfield section of...Read More
|
|
2-lane upgradation of Patranga to Bahuvan Madar Majha stretch of NH-227B (84 Kosi Parikrama Marg) in Uttar Pradesh.
2-lane upgradation of Patranga to Bahuvan Madar Majha stretch of NH-227B
(84 Kosi Parikrama Marg) in Uttar Pradesh.
Bids are invited for...Read More
|
|
MRT&H is setting up pgradation of Sidhi-Singrauli Road to a four- lane configuration at Sidhi.
Ministry of Road Transport and Highways is setting up pgradation of
Sidhi-Singrauli Road to a four- lane configuration at Sidhi....Read More
|
|
MOIL is setting up construction of Tar road in Camp Area Gumgaon Mine.
MOIL is setting up construction of Tar road in Camp Area Gumgaon
Mine.
Project is still in planning stage due to tendering...Read More
|
|
MRT&H is setting up construction of box drain and CC Drains on Washim Dastapur Karanja road NH 161E at Pusad Naka Dist Washim in
Ministry of Road Transport and Highways is setting up construction of box
drain and CC Drains on Washim Dastapur Karanja road...Read More
|
|
PWD Maharashtra is setting up Daulatabad T Point to Khultabad Section
PWD Maharashtra is setting up maintenance of Daulatabad T Point to
Khultabad section of NH 752 H Km 96 000 to...Read More
|
|
Kotputli-Agra Greenfield Expressway.
Kotputli-Agra Greenfield Expressway.
Union Road Transport and Highways
Minister Nitin Gadkari on 10 December has approved Rs. 6,800 crore for
Kotputli-Agra Greenfield Expressway...Read More
|
|
Widening and upgrading the Shangshak-Tengnoupal Road (Package-3) section of National Highway-102A.
Widening and upgrading the Shangshak-Tengnoupal Road (Package-3) section of
National Highway-102A.
The government has approved the project....Read More
|
|
2-lane configuration with a hard shoulder from Khonglo to Kasom-Khullen in Manipur.
2-lane configuration with a hard shoulder from from Khonglo to
Kasom-Khullen in Manipur.
The government has approved the project.
...Read More
|
|
Upgradation of 4-lane National Highway connecting the Jawale-Borgaon Kale section in Maharashtra.
Upgradation of 4-lane National Highway connecting the Jawale-Borgaon Kale
section in Maharashtra.
The Ministry of Road Transport and Highways
(MoRTH) has approved the...Read More
|
|
Railway
|
|
|
Construction of Bengaluru suburban rail project Phase 2.
Construction of Bengaluru suburban rail project Phase 2.
The Karnataka
Rail Infrastructure Development Company (K-RIDE) has put forward a proposal
to extend the...Read More
|
|
Kernex Microsystems India is setting up train collision avoidance systems in Chennai.
Kernex Microsystems India is setting up train collision avoidance systems
in Chennai.
s railway safety technology, has won a substantial
contract
from Integral Coach...Read More
|
|
Construction of rail flyover connecting Rajathgarh, Radhakishorepur, and Machhapur railway stations in Cuttack.
Construction of rail flyover connecting Rajathgarh, Radhakishorepur, and
Machhapur railway stations in Cuttack.
The Ministry of Railways has
sanctioned ₹268.92 crore, for the...Read More
|
|
Construction of rail flyover at Singapur Road Station in Rayagada dist, Odisha.
Construction of rail flyover at Singapur Road Station in Rayagada dist,
Odisha.
The Ministry of Railways has sanctioned ₹240 crore project has
been...Read More
|
|
Doubling of track between Kumbalam and Turavur stations in Ernakulam, Kerala.
Doubling of track between Kumbalam and Turavur stations in Ernakulam,
Kerala.
Bids are invited for the project.
As per work specification,
earth work in...Read More
|
|
Food Processing
|
|
|
Goyal Salt plans to to set up a large salt manufacturing plant at Gandhidham in Kutch dist, Gujarat.
Goyal Salt plans to to set up a large salt manufacturing plant at
Gandhidham in Kutch dist, Gujarat.
Company plans to invest...Read More
|
|
Rail Over Bridge
|
|
|
Construction of Railway Over Bridge (ROB) in Lieu of L.C. No. 195 on Khirkiya Charua MDR Road in Khirkiya City, Harda dist, Madhya Pradesh.
Construction of Railway Over Bridge (ROB) in Lieu of L.C. No. 195 on
Khirkiya Charua MDR Road in Khirkiya City, Harda...Read More
|
|
Infrastructure
|
|
|
Prayagraj Smart City is setting up surveillance and crowd management system for Prayagraj Maha Kumbh 2025
Prayagraj Smart City is setting up surveillance and crowd management system
for Prayagraj Maha Kumbh 2025
June 2024 : Project is still...Read More
|
|
Establishment of a massive industrial project in Butibori industrial area near Nagpur, Maharashtra.
Establishment of a massive industrial project in the Butibori industrial
area near Nagpur, Maharashtra.
The project worth over Rs. 25,000 crore
involves the...Read More
|
|
Restoration works of Chaurasi Kutiya Swargashram in Gauhari Range Rishikesh.
Restoration works of Chaurasi Kutiya Swargashram in Gauhari Range
Rishikesh.
Bids are invited for the project.
The work specification
includes clearing and grubing, excavation...Read More
|
|
Synthetic Rubber
|
|
|
Innova Rubbers is setting up rubber-to-metal bonded parts, including bushings, mountings, hoses, bump stoppers, and coupling in Nashik.
Innova Rubbers is setting up rubber-to-metal bonded parts, including
bushings, mountings, hoses, bump stoppers, and coupling in
Nashik.
manufacture rubber-to-metal bonded parts, including
bushings,
mountings,...Read More
|
|
Water Treatment
|
|
|
Delhi University is setting up operation and maintenance of sewage and effluent treatment plants
Delhi University is setting up peration and Maintenance of 130 KLD Capacity
Sewage Treatment Plant (STP) and 10 KLD Capacity Effluent...Read More
|
|
Delhi Metro Rail Corporation is setting up STP plant DMRC shastri park and boys hostel in Delhi.
Delhi Metro Rail Corporation is setting up STP plant capacity 220 KLD at
DMRC Shastri Park Staff quarters and 100 KLD...Read More
|
|
PWD Puducherry is setting up 3 MLD sewage treatment plant with SBR Technology at Kanuvapet.
PWD Puducherry is setting up 3 MLD sewage treatment plant with SBR
Technology at Kanuvapet.
t utilizing Sequencing Batch Reactor (SBR)
technology, with...Read More
|
|
RRVUNL is setting up 100 KLD sewage treatment plant at Kota.
RRVUNL is setting up 100 KLD sewage treatment plant at Kota.
Project is
still in planning stage due to tendering stage....Read More
|
|
Cantonment Board Ferozepur is setting up construction of 7.0 MLD water treatment plant at Ferozepur.
Cantonment Board Ferozepur is setting up construction of 7.0 MLD water
treatment plant
at Ferozepur.
Construction of 7.0 MLD Water Treatment
Plant and other...Read More
|
|
Construction and commissioning of all the components of Rajnandgaon Sewage Master Plan in Chhattisgarh.
Construction and commissioning of all the components of Rajnandgaon Sewage
Master Plan in Chhattisgarh.
Bids are invited for the project.
The
scope covers survey,...Read More
|
|
Solar
|
|
|
Rajasthan SolarPark Development Company is setting up construction of Civil and Miscellaneous works for Infrastructure development of Pugal Solar Parks at Dist Bikaner.
Rajasthan SolarPark Development Company is setting up construction of Civil
and Miscellaneous works for Infrastructure development of Pugal Solar Parks
at Dist...Read More
|
|
Border Security Force is setting up solar water heaters at Border outposts in Rajasthan.
Border Security Force is setting up solar water heaters at Border outposts
in Rajasthan....Read More
|
|
Establishment of ground-mounted Solar PV Project at Bidadi in Ramanagara dist, Karnataka.
Establishment of ground-mounted Solar PV Project at Bidadi in Ramanagara
dist, Karnataka.
Bids are invited for the project.
The scope of work
covers complete...Read More
|
|
Sub-station
|
|
|
IREL (INDIA) is setting up 132/11KV, substation in Ganjam.
IREL (INDIA) is setting up 132/11KV, substation in Ganjam.
Project is
still in planning stage due to tendering process is going on....Read More
|
|
Cable & Wire
|
|
|
Goldmedal Electricals is setting up wire and cable mfg unit in Palghar.
Goldmedal Electricals is setting up wire and cable mfg unit in Palghar,
Maharashtra....Read More
|
|
Auto Ancillaries
|
|
|
L.G. Balakrishnan & Bros is setting up automotive component mfg facility at Coimbatore.
L.G. Balakrishnan & Bros is setting up automotive component mfg facility at
Coimbatore.
the expansion involves an increase in built up area...Read More
|
|
L.G. Balakrishnan & Bros is setting up automotive component mfg facility at Sriperumbudur.
L.G. Balakrishnan & Bros is setting up automotive component mfg facility at
Sriperumbudur.
expansion involves an incrasev in built up area...Read More
|
|
Others
|
|
|
Municipal Corporation Greater Jaipur is setting up Biometric device installation for Nagar Nigam Jaipur.
Municipal Corporation Greater Jaipur is setting up Biometric device
installation for Nagar Nigam
Jaipur.
Project is still in planning stage
due to tendering process...Read More
|
|
Energy
|
|
|
Haryana Power Generation Corporation is setting up AMC for maintenance of boiler and auxiliaries at PTPS Panipat.
Haryana Power Generation Corporation is setting up AMC for maintenance of
boiler and auxiliaries at PTPS Panipat.
Project is still in planning
stage...Read More
|
|
The W B Power Development Corporation is setting up overhauling of boiler and pressure parts at BTPS Unit 2.
The West Bengal Power Development Corporation is setting up overhauling of
boiler and pressure parts at BTPS Unit 2.
Project is still...Read More
|
|
Amarkantak Thermal Power Station (Unit-6, 1x660 MW) in Anuppur dist, Madhya Pradesh.
Amarkantak Thermal Power Station (Unit-6, 1x660 MW) in Anuppur dist, Madhya
Pradesh.
Bharat Heavy Electricals Ltd. (BHEL) has emerged as the...Read More
|
|
Bridge
|
|
|
Construction of High-Level RCC Bridge for Karunya Institute in Karunya Nagar
Construction of High-Level RCC Bridge
for Karunya Institute in Karunya
Nagar
Karunya Institute of Technology and Sciences,
Coimbatore, for the
construction of a...Read More
|
|
Construction of an intermediate lane steel motor bridge over Birahi Ganga river in Badarinath constituency of Chamoli dist, Uttarakhand.
Construction of an intermediate lane steel motor bridge over Birahi Ganga
river in Badarinath constituency of Chamoli dist, Uttarakhand.
Bids are
invited for...Read More
|
|
PWD Maharashtra is setting up reconstruction of substandard major bridges in Aravali-Kante Section on NH-66
PWD Maharashtra is setting up reconstruction of substandard major bridges
in Aravali-Kante Section on NH-66....Read More
|
|
MRT&H is setting up upgradation of BSNL office to railway crossing in Bhandara City
MRT&H is setting up upgradation of BSNL Office to Railway Crossing in
Bhandara City from Chainage Km 168/180 to Km 168/920...Read More
|
|
Department of Water Resources is setting up reconstruction of Head Regulator cum Bridge of Mavi Minor
Department of Water Resources is setting up RD 32480-44720 including
reconstruction of
Head Regulator cum Bridge of Mavi Minor at RD 40180...Read More
|
|
Department of Water Resources is setting up reconstruction of the Fall cum Head Regulator cum Bridge in Karhali Disty.
Department of Water Resources is setting up RD 20650-32480, including the
reconstruction
of the Fall cum Head Regulator cum Bridge of Balbera...Read More
|
|
Service
|
|
|
PWD Haryana is setting up CCTV, EPABX, and Display Systems for 100-Bed Hospital at Tohana.
PWD Haryana is setting up CCTV, EPABX, and Display Systems for 100-Bed
Hospital at Tohana.
Project is still in planning stage due...Read More
|
|
Special Branch, Police Headquarters MP is setting up CCTV Surveillance System for High Courts in Jabalpur.
Special Branch, Police Headquarters MP is setting up CCTV Surveillance
System for High Courts in Jabalpur.
Project is still in planning stage
due...Read More
|
|
Director General Of Police, Maharashtra is setting up master system integrator for baramati safe city project.
Director General Of Police, Maharashtra is setting up master system
integrator for baramati
safe city project.
Tendering stage....Read More
|
|
Building
|
|
|
Construction of High Court building in Amravati, Andhra Pradesh.
Construction of High Court building in Amravati, Andhra Pradesh.
The
High Court building will be a G+7 55 metre-high structure, with a...Read More
|
|
Construction of General Administration Department (GAD) building in Amravati, Andhra Pradesh.
Construction of General Administration Department (GAD) building in
Amravati, Andhra Pradesh.
The GAD tower would have G+47 floors, with a
total area of...Read More
|
|
Energy
|
|
|
Haryana Power Generation Corporation is setting up AMC for maintenance of boiler and auxiliaries at PTPS Panipat.
Haryana Power Generation Corporation is setting up AMC for maintenance of
boiler and auxiliaries at PTPS Panipat.
Project is still in planning
stage...Read More
|
|
The W B Power Development Corporation is setting up overhauling of boiler and pressure parts at BTPS Unit 2.
The West Bengal Power Development Corporation is setting up overhauling of
boiler and pressure parts at BTPS Unit 2.
Project is still...Read More
|
|
Amarkantak Thermal Power Station (Unit-6, 1x660 MW) in Anuppur dist, Madhya Pradesh.
Amarkantak Thermal Power Station (Unit-6, 1x660 MW) in Anuppur dist, Madhya
Pradesh.
Bharat Heavy Electricals Ltd. (BHEL) has emerged as the...Read More
|
|
Railway
|
|
|
Construction of Bengaluru suburban rail project Phase 2.
Construction of Bengaluru suburban rail project Phase 2.
The Karnataka
Rail Infrastructure Development Company (K-RIDE) has put forward a proposal
to extend the...Read More
|
|
Kernex Microsystems India is setting up train collision avoidance systems in Chennai.
Kernex Microsystems India is setting up train collision avoidance systems
in Chennai.
s railway safety technology, has won a substantial
contract
from Integral Coach...Read More
|
|
Construction of rail flyover connecting Rajathgarh, Radhakishorepur, and Machhapur railway stations in Cuttack.
Construction of rail flyover connecting Rajathgarh, Radhakishorepur, and
Machhapur railway stations in Cuttack.
The Ministry of Railways has
sanctioned ₹268.92 crore, for the...Read More
|
|
Construction of rail flyover at Singapur Road Station in Rayagada dist, Odisha.
Construction of rail flyover at Singapur Road Station in Rayagada dist,
Odisha.
The Ministry of Railways has sanctioned ₹240 crore project has
been...Read More
|
|
Doubling of track between Kumbalam and Turavur stations in Ernakulam, Kerala.
Doubling of track between Kumbalam and Turavur stations in Ernakulam,
Kerala.
Bids are invited for the project.
As per work specification,
earth work in...Read More
|
|
Cement
|
|
|
Khyber Industries is setting up expansion of cement plant at Tulpow, Khonmoh.
Khyber Industries is setting up expansion of Cement Plant located in
Jammu-Kashmir.
Project is still in planning stage due to govt permission
is...Read More
|
|
Synthetic Chemicals
|
|
|
Richa Intermediates is setting up synthetic organic chemical in Bharuch.
Richa Intermediates is setting up synthetic organic chemical in Panoli,
Taluka: Ankleshwar, Dist: Bharuch.
Project is still in planning stage
due to govt...Read More
|
|
Karnavati Veneers is setting up synthetic organic chemicals mfg unit at SabarKantha.
Karnavati Veneers is setting up synthetic organic chemicals mfg unit at
SabarKantha.
Project is still in planning stage due to govt permission
is...Read More
|
|
J&K Lake Conservation and Management Authority is setting up provision of chemicals in Srinagar.
J&K Lake Conservation and Management Authority is setting up provision of
chemicals, for three FAB-based sewerage treatment plants (STPs) of JKLCMA:
1....Read More
|