Published On:March 16 2017
Story Viewed 4947 Times

Model Roads project: Corporation begins work on D.B. Road.

Coimbatore Corporation and the Institute for Transportation and Development Policy (ITDP) have commenced the Model Roads Project work a few days ago at the southern end of the D.B. Road in R.S. Puram.

According to sources, the two agencies have begun the work near the Corporation’s water tank on a 50-metre stretch, where they would be studying the alignment of the utility lines and the passage of power cables and telephone lines in the area. Thereafter, they would provide ducts to conceal the cables and lines, cover the road, then take up pedestrian pathway development. The work on the median would be the last.

The Corporation is executing the Model Roads project on 1.80 km stretch of D.B. Road and 1.20 km of T.V. Swamy Road. The telephone and power cables would go underground, the pedestrian pathway would be of uniform width and height so that pedestrians could seamlessly walk from one end to another and the carriage way too would be of uniform width.

As part of the project, the two agencies would also work to remodel road junctions so that the turning radius is uniform and bus movement is not hindered. The Corporation along with ITDP is also taking up the project on M.K. Palayam Road, Race Course and Sanganoor Road.

THE HINDU


OUR OTHER PRODUCTS & SERVICES: Projects Database | Tenders Database | About Us | Contact Us | Terms of Use | Advertise with Us | Privacy Policy | Disclaimer | Feedback

This site is best viewed with a resolution of 1024x768 (or higher) and supports Microsoft Internet Explorer 4.0 (or higher)
Copyright © 2016-2026

Technology Partner - Pairscript Software