Published On:April 3 2019
Story Viewed 1444 Times
NTPC’s installed capacity at 55,126 MW.
Public Sector power generator NTPC announced the increase of its total installed capacity to 55,126 MW with the commissioning of the first unit of 800 MW of Gadarwara Super Thermal Power Project (2x800 MW).
The Gadarwara Supercritical coal-based power project is located in Madhya Pradesh. In a statement issued recently, the company said it aims to achieve a total installed capacity of 130 GW by 2032.
HBL