In this issue

>Metro Rail
>Airport
>Chemical derivatives
>Runway & Terminal
>Iron & Steel
>Tunnel
>Rail-road
>Education
>Formulation
>Coke
>Environmental
>Chemical
>Apartment
>Infrastructure
>Solar
>Distillary/Alcohol
>Synthetic Chemicals
>Water Treatment
>Drugs & Pharma
>Park
>Construction
>Bulk Drug
>Herbiside&Pesticide
>Building
>Mining
>Quary
>Machine Tools
>Dyes & Pigments
>Solid Waste recyling
>Cement
>Hydel
>Plywood
>Metalic ore
>Water Supply
>Road/Highway
>Hospital
>Plastic
>Irrigation
>Commercial Complex
>Commercial Complex
>Geothermal
>Construction
>Solar
>Elevator
>Energy
>Construction
>Building
>Township
>Railway
>Natural Gas
>Packaged Food
>Engineering
>Roadways
>Electrical Products
>Transformer
>Auto Ancillaries
>Rail Electrificat
>Refinery
Latest News

"TN Cabinet Greenlights ₹44,125 Crore Investment Proposals"

"TN Cabinet Greenlights ₹44,125 Crore Investment Proposals" ...Read More


"Avaada Group to Invest ₹14,000 Crore in Two Pumped Storage Power Projects"

"Avaada Group to Invest ₹14,000 Crore in Two Pumped Storage ...Read More


"Godrej Properties to Launch ₹21,000 Crore Housing Projects by March"

"Godrej Properties to Launch ₹21,000 Crore Housing Projects by March" ...Read More

More News


L&T wins construction orders

SAIL to increase crude steel capacity

GMR to start MRO unit by next year

TVH India to set up value homes project

Railways to increase track laying capacity

Bhushan Steel to set up a Rs.28K cr value-added steel plant in Karnataka

Coastal AP and Gujarat to get nuclear power plants

ABB wins $22 million power orders in India

Thermax - Babcock & Wilcox Joint Venture for Supercritical Boilers

L&T bags Rs 1,000 crore project from ONGC
Total 144 projects are covered in this issue. Updated between Aug 07- Aug 14 24
Metro Rail

East-West Kolkata Metro corridor project.

The Kolkata Metro Rail Corporation (KMRC), a joint venture company with
equal equity participation from the Centre and the State Government,...Read More

Colaba-Bandra-Seepz Metro 3 project.

The Mumbai Metropolitan Region Development Authority (MMRDA), is to
construct line-3 of 'Colaba-Bandra-Seepz'. This will be 34 long under
ground line...Read More

Construction of 12.8-km long Wadala to Chhatrapati Shivaji Maharaj Terminus Metro-11 corridor.

Construction of 12.8-km long Wadala to Chhatrapati Shivaji Maharaj Terminus
Metro-11 corridor. As per Line-11’s Detailed Project Report (view
DPR’s PDF) prepared by...Read More

Implementation of Nagpur Metro Phase-II.

Implementation of Nagpur Metro Phase-II. The corridors include one from
Automotive Square to Kanhan – 13 km length and 12 stations. The...Read More

Development of Bhubaneswar Metro Rail Project.

Development of Bhubaneswar Metro Rail Project. On 07 October, 2023, the
Chief Minister approved the detailed project report (DPR) prepared by
DMRC. Chief Minister...Read More

Airport

Dholera international airport project.

Dholera SIR is proposed to be developed by the state government as a mega
industrial zone, along the Delhi-Mumbai Industrial Corridor...Read More

Development of second airport in Bengaluru, Karnataka.

Developmen of second airport in Bengaluru, Karnataka. The Karnataka
government has begun scouting for land for a second airport in Bengaluru.
It will...Read More

Development of new Airport at Kandla.

Development of new Airport at Kandla. Deendayal Port Authority (DPA),
which handles Kandla port has agreed in principle to allot 600-1,000 acres
for...Read More

Chemical derivatives

Special Blasts plans to set up nitric acid unit in Singrauli

Special Blasts plans to set up nitric acid unit in Singrauli, Madhya
Pradesh April 2015 :Project is in planning stage. Jan.2016: The work
on...Read More

Abhi Colchem is setting up formaldehyde mfg unit at Neja village, Anand.

Abhi Colchem is setting up formaldehyde mfg unit at Neja village,
Anand. manufacturing unit of Formaldehyde 37%, Phenol Formaldehyde,
Melamine Formaldehyde, Liquid urea...Read More

Mantung Organics is setting up new ethyl and butyl acetate plant at Meerut.

Mantung Organics is setting up new ethyl and butyl acetate plant at
Meerut. Aug 2024 Project is still in planning stage due...Read More

CMG Biotech is setting up Active Pharmaceutical Ingredient unit at Sansarpur.

CMG Biotech is setting up Active Pharmaceutical Ingredient unit at
Sansarpur. Aug 2024 : Project is still in planning stage due to...Read More

Runway & Terminal

Raja Bhoj Airport expansion project in Bhopal, Madhya Pradesh.

Raja Bhoj Airport expansion project. The project also will have modern
terminal building and well landscaped surrounding. Aug 2024: The Airport
Authority of India...Read More

Iron & Steel

Jai Raj Ispat is setting up an integrated steel unit Kurnool district of Andhra Pradesh.

Jai Raj Ispat is setting up an integrated steel unit at Orvakal Mega
Industrial Hub of the Andhra Pradesh Industrial Infrastructure...Read More

Gajkesari Steels And Alloys plans to set up Steel Plant M.S. Billet unit in Jalna

Gajkesari Steels And Alloys plans to set up an M.S billets in Jalna.
existing steel plant to increase M.S. Billets production...Read More

Manbhum Ispat is plans to set up Sponge Iron Unit In West Bengal

Manbhum Ispat is plans to set up Sponge Iron Unit In West
Bengal “Greenfield Project for Sponge Iron Production of 1,65,000 TPA
and WHRB...Read More

Jailaxmi Alloy Steels plans to manufacture Alloy steels, billets and ingots at Aurangabad, Maharashtra.

Jailaxmi Alloy Steels plans to manufacture Alloy steels, billets and ingots
at Aurangabad, Maharashtra. Manufacturing of alloys steel billets and
ingots (3,60,000 Tpa),...Read More

Indian Ispat Works is setting up existing steel plant located at Rawabhata.

Indian Ispat Works is setting up existing steel plant located at
Rawabhata. M. S Ingots/Billets from 59400 TPA to 155000 TPA; Re-Rolled
product...Read More

Ambey Metallic is setting up integrated steel plant in Goa.

Ambey Metallic is setting up integrated steel plant in Goa. DRI Plant
– 2 x 120 TPD (Sponge Iron-86,500 TPA), Iron Ore...Read More

Tunnel

Zojila tunnel project in J&K.

Zojila tunnel project in Jammu and Kashmir. The government ordered
"rebidding" of the strategic Rs 10,050-crore Zojila pass tunnel contract in
Jammu and...Read More

Rail-road

Construction of third line between Jhansi and Bina.

Construction of third line between Jhansi and Bina. The Cabinet
Committee on Economic Affairs has given its approval for construction of
third line...Read More

Construction of 4th line project between Chennai beach and Egmore.

Construction of 4th line project between Chennai beach and
Egmore. Southern Railway has made significant progress in the fourth
line project. The project is...Read More

New BG double railway line of Haryana Orbital Rail Corridor (HORC) project between stations Prithla and Dhulawat (Package C5).

New BG double railway line of Haryana Orbital Rail Corridor (HORC) project
between stations Prithla and Dhulawat (Package C5). Dilip Buildcon has
emerged...Read More

Development of new line from Gunupur-Therubali.

Development of new line from Gunupur-Therubali. The cabinet committee on
economic affairs chaired by the Prime Minister approved the project. ...Read More

Education

Construction Of Govt. Polytechnic Baram.

Construction Of Govt. Polytechnic Baram. Sept 2018 ; Work on project
is under construction. almost work is done. Mar 2019 ; Work on...Read More

Formulation

Rutu Chemicals plans to set up a bulk drugs and intermediates unit at GIDC, Panoli in Bharuch

Rutu Chemicals plans to set up a bulk drugs and intermediates unit at GIDC
Industrial Estate, Panoli in Bharuch district of...Read More

Sri Mahadev Industries is setting up an API in Nawabpet Village, Shivampet Mandal.

Sri Mahadev Industries is setting up an API in Nawabpet Village, Shivampet
Mandal. Aug 2023 : Project is under-constrcution and likely for
completion...Read More

Seema Finechem Industry Llp is setting up pharma intermediates at Raigarh.

Seema Finechem Industry Llp is setting up pharma intermediates at
Raigarh. Project is commissioned. ...Read More

Coke

Kiran Industries is planning to set up a coke manufacturing unit at Otha village, Mahuva in Bhavnagar.

Kiran Industries is planning to set up a coke manufacturing unit at Otha
village, Mahuva in Bhavnagar. The project will spread over...Read More

Environmental

Sabarmati Riverfront Development Project Phase-II.

Sabarmati Riverfront Development Project Phase-II. Phase-II of the
project will have 180 high-rise residential complexes along the river
banks. The Sabarmati Riverfront is developing...Read More

Chemical

Mahaveer Surfactants plans to set up a linear alkyl benzene sulphonic acid unit at Gummidipondi village in Tiruvallur.

Mahaveer Surfactants plans to set up a linear alkyl benzene sulphonic acid
unit at Gummidipondi village in Tiruvallur. The project will...Read More

Krishna Intermediates is setting up Synthetic organic chemicals industry (dyes & dye intermediates; bulk at Gandhinagar.

Krishna Intermediates is setting up Synthetic organic chemicals industry
(dyes & dye intermediates; bulk at Gandhinagar. Feb 2023 : Project is
in planning...Read More

Vineela Biologics is plans to set up active pharmaceutical ingredients (API) unit at Kadechur Industrial Area in Karnataka.

Vineela Biologics is plans to set up active pharmaceutical ingredients
(API) unit at Kadechur Industrial Area in Karnataka. KIADB has allotted
2.0...Read More

Shubham Remedies is setting up active pharmaceutical ingredients 150 tpm API facility in Gujarat.

Shubham Remedies is setting up active pharmaceutical ingredients 150 tpm
API facility in Gujarat. Aug 2023 : Project work is under way....Read More

Projects and Development is set up High Ash Coal to Ammonium Nitrate Plant in Odisha

Projects and Development India Limited is set up High Ash Coal to Ammonium
Nitrate Plant , BCGCL in Odisha High...Read More

Archidpanel Industries is setting up resin derivatives at Udham Singh Nagar.

Archidpanel Industries is setting up resin derivatives at Udham Singh
Nagar. Project is commissioned and commercial production is started....Read More

Apartment

Panvelkar Group is developing a residential complex Panvelkar Nisarg at Juveli, Badlapur (east) in Thane.

Panvelkar Group is developing a residential complex Panvelkar Nisarg at
Juveli, Badlapur (east) in Thane. The project comprises five towers of
G+seven floors...Read More

JBR Nirmaan is constructing residential-cum-commercial complex 'Turquoise Greenz' Ahmedabad dist, Gujarat.

JBR Nirmaan is constructing residential-cum-commercial complex 'Turquoise
Greenz' Ahmedabad dist, Gujarat. The project will spread over 1.43 acre
of land parcel and...Read More

Shapoorji Pallonji Real Estate is developing a luxurious project 'Vanaha', a mixed-use development in Pune, Maharashtra.

Shapoorji Pallonji Real Estate is developing a luxurious project 'Vanaha',
a mixed-use development located near Bavdhan, Pune in Maharashtra. The
project, comprising...Read More

Construction of G plus 8 Storied Quarters and Infrastructure Facilities for IOCL Township Expansion of Paradip Refinery at Paradip, Odisha.

Construction of G plus 8 Storied Quarters and Infrastructure Facilities
for IOCL Township Expansion of Paradip Refinery at Paradip, Odisha. Bids
are...Read More

Anvita Group is setting up residential project Anvita Ivna located in Kollur, near Hyderabad.

Anvita Group is setting up residential project located in Kollur, near
Hyderabad. project will be executed in two phases, with the first...Read More

Development of a residential project in sector 63A at Gurgaon, Haryana.

Development of a residential project in sector 63A at Gurgaon,
Haryana. Company plans the project on a 12-acre land. ...Read More

Infrastructure

Construction of auditorium, market, and multi level parking in mc office, Ambala city.

Bids are invited for construction of auditorium, market, and multi level
parking in mc office, Ambala city. Aug 2023 : Project is...Read More

Construction of Fintech Digital Institute, Jodhpur.

Construction of Fintech Digital Institute, Jodhpur. Department of
Information Technology & Communication, Rajasthan has invited request for
proposal (RFP) for selecting construction...Read More

Development of Centre of Excellence in Corporate Forensics in GIFT City, Gandhinagar.

Development of Centre of Excellence in Corporate Forensics in GIFT City,
Gandhinagar. The Gujarat International Finance Tec-City (GIFT City) and
the National Forensic...Read More

Solar

Construction of floating solar project at Omkareshwar dam on Narmada river in Khandwa.

Construction of floating solar project at Omkareshwar dam on Narmada
river in Khandwa. The primary feasibility study of the project...Read More

Department of Irrigation is setting up Solar MDTW Scheme: Hajo Jalukbari Division.

Department of Irrigation is setting up Solar MDTW Scheme: Hajo Jalukbari
Division./amingaon Project is under-construction and expected to be
completed by Mar-April 2024. Aug...Read More

Development of a 75 MW (AC) grid-connected solar PV power plant along with a 132 kV Sub-Station in Jamui, Bihar.

Development of a 75 MW (AC) grid-connected solar PV power plant along with
a 132 kV Sub-Station in Jamui, Bihar. Hartek Power...Read More

Rudra Global Infra plans to set up a 30 MW captive solar project in Gujarat.

Rudra Global Infra plans to set up a 30 MW captive solar project in
Gujarat. Company plans to invest Rs. 190 crore...Read More

Distillary/Alcohol

Development of a 100 klpd grain-based ethanol plant at Nuakheta, Bantala in Angul district

Development of a 100 klpd grain-based ethanol plant at Nuakheta, Bantala in
Angul district A 100 klpd grain-based ethanol plant along...Read More

Vishwa Samudra Bio Energy is planning to set up ethanol manufacturing unit at Nellore dist, Andhra Pradesh.

Vishwa Samudra Bio Energy is planning to set up ethanol manufacturing unit
with a capacity of 200 klpd in Nellore dist,...Read More

Vibrant Spirits Pvt Ltd is plans to Set up ethonal unit in Bargarh

Vibrant Spirits Pvt Ltd is plans to Set up ethonal unit in
Bargarh Vibrant Spirits proposes to set up 100 KLPD...Read More

Satral Chemicals is setting up distilleries in Rahuri, Ahmednagar.

Satral Chemicals is setting up distilleries in Rahuri, Ahmednagar. Aug
2023 : Project is still in planning stage due to environmental clearances...Read More

Atthah Petrochem plans to set up grain-based distillery unit to produce ethanol at Nagdala in Banswara dist, Rajasthan.

Atthah Petrochem plans to set up a grain-based distillery unit to produce
ethanol at Nagdala in Banswara dist, Rajasthan. The proposed unit...Read More

Ramaya Distilleries & Bottlers plans to set up a grain-based distillery unit in Deoria dist, Uttar Pradesh.

Ramaya Distilleries & Bottlers plans to set up a grain-based distillery
unit at Kasia village, Kushinagar in Deoria dist, Uttar Pradesh. The
proposed...Read More

Atthah Petrochem Private Limited is set up Ethanol production unit at Banswara by Atthah

Atthah Petrochem Private Limited is set up Ethanol production unit at
Banswara by Atthah production of Ethanol from Rice and Maize...Read More

Cuttack Agrivet is setting up grain based distillery plant at Cuttack, Odisha.

Cuttack Agrivet is setting up grain based distillery plant of 200 KLD along
with Co-generation Power Plant of 4.0 MW located...Read More

Dhampur Sugar Mills Plans Major Expansion in Sambhal, UP

Dhampur Sugar Mills Limited is proposing a significant expansion of its
existing sugar unit in Sambhal, Uttar Pradesh. The expansion includes
increasing...Read More

Rajshree Fine Chemical Industries is setting up grain-based distillery plant in Shahjahanpur.

Rajshree Fine Chemical Industries is setting up grain-based distillery
plant in Salpur Navdia, Tehsil: Tilhar, District: Shahjahanpur. Aug
2024 : Project is still in...Read More

Lignopura Agrotech is setting up demo-scale 2G integrated bioethanol project at Kadegaon.

Lignopura Agrotech is setting up demo-scale 2G integrated bioethanol
project at Kadegaon. Project is still in planning stage due to got
approvals ,govt...Read More

Synthetic Chemicals

Ganesh Dye Chem Industries is plans to set up synthetic organic chemicals unit in Ahmedabad, Gujarat.

Ganesh Dye Chem Industries is plans to set up synthetic organic chemicals
unit in Ahmedabad, Gujarat. Aug 2023 : Project is still...Read More

Pentaphos Industries is setting up synthetic organic unit at Bharuch.

Pentaphos Industries is setting up synthetic organic unit at
Bharuch. Aug 2023 : Project is under-construction and scheduled to be
completed within 3-4...Read More

Sodium Metal is setting up synthetic organic chemical & in-organic chemical unit in GIDC Nandesari, Vadodara.

Sodium Metal is setting up synthetic organic chemical & in-organic chemical
unit in GIDC Nandesari, Vadodara. Aug 2024 : Project is still...Read More

Siddhant AMK Industries is setting up synthetic organic chemicals industry dyes & dye intermediates bulk unit in Ahmedabad.

Siddhant AMK Industries is setting up synthetic organic chemicals industry
dyes & dye intermediates bulk unit in Ahmedabad,Gujarat. Feb 2024 :
Project is...Read More

Grauer & Weil (India) is setting up surface finishing chemicals & intermediate chemicals in Samba, Jammu and Kashmir.

Grauer & Weil (India) is setting up surface finishing chemicals &
intermediate chemicals in Samba, Jammu and Kashmir. Aug 2024 :Project
is still in...Read More

Water Treatment

Samved Bio Medical Waste Management Pvt. Ltd. is Plans to Common Bio-Medical Waste Treatment And Disposal Facility at Gujarat.

Samved Bio Medical Waste Management Pvt. Ltd. is Plans to Common
Bio-Medical Waste Treatment And Disposal Facility at GIDC...Read More

Commissioning of 10.5 MLD capacity second module CETP at IMT Faridabad, Haryana.

Commissioning of 10.5 MLD capacity second module CETP at IMT Faridabad,
Haryana. Bids are invited for the project. The work involves
engineering, procurement,...Read More

NHPC is plans to set up Water treatment plant at Rambi

NHPC is plans to set up Water treatment plant at Rambi Water treatment
plant (20KLD) at cellular wall of TLD-III PS, Rambi....Read More

Drugs & Pharma

Viruj Chematrix is planning to set up Active pharmaceutical ingredients (API) manufacturing unit in Nalgonda district of Telangana.

Viruj Chematrix is planning to set up active pharmaceutical ingredients
(API) manufacturing unit at Pittampally in Nalgonda district of
Telangana. The proposed unit...Read More

Vivint Pharma plans to set up injectables manufacturing facility in Genome Valley, Hyderabad.

Vivint Pharma plans to set up injectables manufacturing facility in Genome
Valley, Hyderabad. Company will make an investment of Rs. 400...Read More

Park

Development of an information technology park at Maatuthavani, Tamil Nadu.

Development of an information technology park at Maatuthavani, Tamil
Nadu. The park will be set up by TIDEL in association with the...Read More

Construction

Ranawat Properties is setting up Aura Waters – 2 & 3 BHK apartments at Sinhagad Road Pune.

Ranawat Properties is setting up Aura Waters – 2 & 3 BHK apartments at
Sinhagad Road Pune. Dec 2022 : Project work...Read More

Panisagar Nagar Panchayat is setting up construction of hard drawn fencing work around the newly constructed swimming pool.

Panisagar Nagar Panchayat is setting up construction of hard drawn fencing
work around the newly constructed swimming pool in
Panisagar,Tripura. Feb 2024 :...Read More

Sagarmatha Ventures is setting up Ashiyana Heights project in Matigara.

Sagarmatha Ventures is setting up Ashiyana Heights project in
Matigara. The project offers 2, 3 BHK Apartment configuration. The
amenities and facilities include...Read More

Airports Authority of India is setting up construction of parking shed at Kolhapur Airport.

Airports Authority of India is setting up construction of parking shed of
New ATC Tower at Kolhapur Airport. Aug 2024...Read More

MSRDC is setting up construction of JNE 01 from Panshendra and JNE 02 packages in Jalna

MSRDC is setting up construction of JNE 01 from Panshendra and JNE 02
packages in Jalna of Access Controlled Expressway...Read More

Centre for Development of Telematics is setting up 4G control room at CDOT, Delhi.

Centre for Development of Telematics is setting up 4G control room at CDOT,
Delhi. Project is still in planning stage due to...Read More

Indian Institute of Astrophysics is setting up minor civil works at crest campus, IIA, Hosakaote, Bengaluru.

Indian Institute of Astrophysics is setting up minor civil works at crest
campus, IIA, Hosakaote, Bengaluru. Project is stlll in planning stage
due...Read More

Hon. Principal District Judge is setting up criminal court building at Yerwada.

Hon. Principal District Judge is setting up criminal court building at
Yerwada. Project is still in planning stage due to govt permission...Read More

Bhabha Atomic Research Centre is setting up precast panel boundary wall and watch towers at Trombay Hill.

Bhabha Atomic Research Centre is setting up precast panel boundary wall and
watch towers at Trombay Hill. from R-5 Gate to DEED...Read More

National Aluminium Company is setting up construction of NALCO Office Building at Kharghar, Mumbai.

National Aluminium Company is setting up construction of NALCO Office
Building at Kharghar, Mumbai. Project is still in planning stage due to
tender...Read More

Indian Institute of Technology Roorkee is setting up construction of Vikas Nagar Parking at IIT Roorkee.

Indian Institute of Technology Roorkee is setting up construction of Vikas
Nagar Parking at IIT Roorkee. Project is still in planning stage...Read More

Damodar Valley Corporation is setting up renovation & expansion of Banquet Hall at DVC Towers Kolkata.

Damodar Valley Corporation is setting up renovation & expansion of Banquet
Hall at DVC Towers Kolkata. Project in still in planning stage...Read More

MSRDC is setting up construction of PRR E1 and PRR E2 packages of access controlled Pune Ring Road.

MSRDC is setting up construction of PRR E1 and PRR E2 packages of access
controlled Pune Ring Road. Project is still in...Read More

MSRDC is setting up construction of PRR W4 and PRR W5 packages Access Controlled Pune Ring Road.

MSRDC is setting up construction of PRR W4 and PRR W5 packages Access
Controlled Pune Ring Road. Project is still in planning...Read More

MSRDC is setting up construction of PRR E3A, PRR E3B, and PRR E4 packages access controlled Pune Ring Road.

MSRDC is setting up construction of PRR E3A, PRR E3B, and PRR E4 packages
access controlled Pune Ring Road. Project is still...Read More

MSRDC is setting up construction of PRR W1, PRR W2, and PRR W3 packages of Access Controlled Pune Ring Road.

MSRDC is setting up construction of PRR W1, PRR W2, and PRR W3 packages of
Access Controlled Pune Ring Road. Project is...Read More

MSRDC is setting up construction of NG 01 and NG 02 packages, as part of Nagpur-Gondia Expressway, Tiroda connector and Gondia Bypass.

MSRDC is setting up construction of NG 01 and NG 02 packages, as part of
Nagpur-Gondia Expressway, Tiroda connector and Gondia...Read More

MSRDC is setting up construction of NG 04 and NG 05 packages, as part of Nagpur-Gondia Expressway, Tiroda connector and Gondia Bypass.

MSRDC is setting up construction of NG 04 and NG 05 packages, as part of
Nagpur-Gondia Expressway, Tiroda connector and Gondia...Read More

ITC Limited is plans to set up PSPD Residential Complex in Sarapaka

ITC Limited is plans to set up PSPD Residential Complex in Sarapaka
Village, Bhadradri Kothagudem project includes Manager Housing Building,
SR...Read More

Bulk Drug

Sand Chem India Ltd is plans to Expansion of Formaldehyde Manufacturing unit in Haryana

Sand Chem India Ltd is plans to Expansion of Formaldehyde Manufacturing
unit in Haryana Unit from 40 TPD to 200...Read More

Herbiside&Pesticide

Shreeji Pesticides is setting up a pesticides technical and intermediates manufacturing unit in Bharuch dist, Gujarat.

Shreeji Pesticides is setting up a pesticides technical and intermediates
manufacturing unit in Bharuch dist, Gujarat. The proposed project will
spread over 10.20...Read More

Building

Construction of Admin Building in Trichy

Construction of Admin Building in Trichy Construction of Admin Building
(Ground plus one) along with site development including internal electrical
installations, lightning...Read More

Suyojit Infrastructure is setting up commercial-cum-hostel building in Nashik.

Suyojit Infrastructure is setting up commercial-cum-hostel building in
Nashik. Project is still in planning stage due to govt permissions is
awaited. ...Read More

SSN Trust is setting up constructing a new building at Chengalpattu.

SSN Trust is setting up constructing a new building at Chengalpattu. o
expand its educational institution by constructing a new building with...Read More

Mining

Sreedhanya Metals is setting up mining of minerals at Thiruvananthapuram.

Sreedhanya Metals is setting up mining of minerals at
Thiruvananthapuram. Feb 2024 :Environmental cleranaces is received and
mining may start after 2 months. Aug...Read More

Quary

Atul Goyal is setting up Devdongar Limestone Quarry Atul Goyal at Rajnandgaon.

Atul Goyal is setting up Devdongar Limestone Quarry Atul Goyal at
Rajnandgaon. production Area - 1.67 ha., Production 18,000 Tons per
annum Aug 2024...Read More

Bhagchand Jain is setting up Chaweli Limestone Quarry at Rajnandgaon.

Bhagchand Jain is setting up Chaweli Limestone Quarry at
Rajnandgaon. Aug 2024 : Project is still in planning stage due to
awaiting...Read More

Machine Tools

Solar Diamond Tools plans for cutting Tools unit in Thane dist, Maharashtra.

Solar Diamond Tools plans for cutting Tools unit at Additional Ambernath
Industrial Area in Thane dist, Maharashtra. The proposed unit...Read More

Dyes & Pigments

Unity Chemicals is setting up Synthetic organic chemicals industry (dyes & dye intermediates; bulk unit at Bharuch.

Unity Chemicals is setting up Synthetic organic chemicals industry (dyes &
dye intermediates; bulk unit at syka Bharuch. Feb 2024 : Project...Read More

Macson Color Chem is setting up expansion project of dyes and dyes intermediate products at Dahej, Vagra, Bharuch.

Macson Color Chem is setting up expansion project of dyes and dyes
intermediate products at Dahej, Vagra, Bharuch. Aug 2023 : Project...Read More

Dycron Colour Chem is setting up dyes production in Ahmedabad.

Dycron Colour Chem is setting up dyes production in Ahmedabad. company
intends to increase its existing SO Dyes production to 6.5 MT/month...Read More

Tejal Industries is setting pigments and intermediates at Ankleshwar, Dist. Bharuch.

Tejal Industries is setting pigments and intermediates at Ankleshwar, Dist.
Bharuch. Project is cancelled....Read More

Solid Waste recyling

Devis Surgico is setting up common bio medical waste treatment facility

Devis Surgico is setting up common bio medical waste treatment facility in
Gwalior. 100kg per hour to 350kg per hour...Read More

DMIC Vikram Udyogpuri is setting up common effluent treatment plant in Ujjain.

DMIC Vikram Udyogpuri is setting up common effluent treatment plant in
Ujjain. Aug 2024 : Project is still in planning stage...Read More

Cement

Jabalpur Cement Industries is setting up clinker grinding unit 500 TPD in Jabalpur.

Jabalpur Cement Industries is setting up clinker grinding unit 500 TPD in
Nigri Jabalpur. Aug 2024 : Almost 10-20 % % work...Read More

JK Cement is plans to set up Clinker Grinding Unit in Bihar

JK Cement is plans to set up Clinker Grinding Unit in Bihar establish a
standalone clinker grinding unit with a cement...Read More

Hydel

Construction of a 382 MW Sunni dam hydro-electric project.

Construction of a 382 MW Sunni dam hydro-electric project. Rithwik
Projects will construct a 382 MW Sunni dam hydro-electric project for Rs
1,098...Read More

Plywood

Archidpanel Industries plans manufacturing of Medium Density Fibre Board & Particle Boards at Udhamsingh Nagar, Uttarakhand.

Archidpanel Industries plans manufacturing of Medium Density Fibre Board &
Particle Boards at Udhamsingh Nagar, Uttarakhand. Aug 2024 : Work on
project...Read More

Metalic ore

SFAL Metallics is setting up ferro silicon, silico manganese, ferro manganese, ferro chrome at Merakamudidam (Mandal), Vizianagaram.

SFAL Metallics is setting up ferro silicon (82,000 TPA), silico manganese
(1,76,000 TPA), ferro manganese (2,30,000 TPA) and ferro chrome(1,93,000
TPA) at...Read More

Water Supply

Andaman Public Works Department (APWD) is set up bachra pahar water supply scheme at Chouldari.

Andaman Public Works Department (APWD) is set up bachra pahar water supply
scheme at Chouldari in South Andaman Island Aug 2023...Read More

Road/Highway

2-lane upgradation of Patranga to Bahuvan Madar Majha stretch of NH-227B (84 Kosi Parikrama Marg) in Uttar Pradesh.

2-lane upgradation of Patranga to Bahuvan Madar Majha stretch of NH-227B
(84 Kosi Parikrama Marg) in Uttar Pradesh. Bids are invited for...Read More

Construction of Tadipatri Bypass Supervision, NH67, Andhra Pradesh

Construction of Tadipatri Bypass Supervision, NH67, Andhra
Pradesh Tadipatri bypass from Km 0/000 to Km 6/285 of 4 lane on NH67...Read More

2-laning with paved shoulder of NH-127B from km 31.500 to km 63.224 (Goeragre) in Meghalaya.

2-laning with paved shoulder of NH-127B from km 31.500 to km 63.224
(Goeragre) in Meghalaya. MIDAS Constructions has been declared as lowest
bidder...Read More

Rehabilitation and upgradation of Pratapgarh - Amethi - Gauriganj - Musafirkhana from design Km 0.000 to Km. 69.280 of NH-931, Multi dist, Uttar Pradesh.

Rehabilitation and upgradation of Pratapgarh - Amethi - Gauriganj -
Musafirkhana from design Km 0.000 to Km. 69.280 of NH-931, Multi...Read More

MSRDC is setting up multi modal corridor from Navghar to Balavali.

MSRDC is setting up multi modal corridor from Navghar to Balavali.
construction of MMC 09, MMC 10, and MMC 11 packages,...Read More

Hospital

Construction of JIPMER Karaikal Hospital in Puducherry.

Construction of JIPMER Karaikal Hospital in Puducherry. Bids are invited
for the project. The scope of work includes planning designing and
construction of this...Read More

Construction of a new district hospital in Reshipora area of Budgam dist, Jammu & Kashmir.

Construction of a new district hospital in Reshipora area of Budgam dist,
Jammu & Kashmir. The hospital building is one of the...Read More

Medanta plans to set up a super specialty hospital in Mumbai.

Medanta plans to set up a super specialty hospital in Mumbai. Medanta
has lined up an investment plan of Rs. 1,200 crore...Read More

Plastic

Ideal Packaging Industries plans set up a new PET bottles manufacturing unit in Sirmaur dist, Himachal Pradesh.

Ideal Packaging Industries plans set up a new PET bottles manufacturing
unit at Moginand village in Sirmaur dist, Himachal Pradesh. The proposed
project...Read More

Irrigation

Shaheed Ilap Singh Lift Micro Irrigation Project in Khargone dist, Madhya Pradesh.

Shaheed Ilap Singh Lift Micro Irrigation Project in Khargone dist, Madhya
Pradesh. Bids are invited for the project. The project will be
executed to...Read More

Construction of water lifting arrangement work for LIS 1-10-11-12,8, 9, 3 ,4-5-6 of submergence of Jigaon project in Maharashtra.

Construction of water lifting arrangement work for LIS 1-10-11-12,8, 9, 3
,4-5-6 of submergence of Jigaon project in Maharashtra. The Office...Read More

Commercial Complex

Construction of bus terminal-cum-commercial complex at Kanpur Central, Uttar Pradesh.

Construction of bus terminal-cum-commercial complex at Kanpur Central,
Uttar Pradesh. Bids are invited for the project. The work at
Jhakarkati in Kanpur will be...Read More

Nanis Buildcon is setting up Nanis Vedant Beryl project at Sonegaon.

Nanis Buildcon is setting up Nanis Vedant Beryl project at Sonegaon.
project offers 2, 3 BHK Apartment configuration. The amenities and
facilities...Read More

Krisna Nirmaan Skyscraper LLP is setting up Dhanori residential and commercial project in Dhanori, Pune.

Krisna Nirmaan Skyscraper LLP is setting up Dhanori residential and
commercial project in Dhanori, Pune. Project is under-construction and
expected for completion in...Read More

Commercial Complex

Construction of bus terminal-cum-commercial complex at Kanpur Central, Uttar Pradesh.

Construction of bus terminal-cum-commercial complex at Kanpur Central,
Uttar Pradesh. Bids are invited for the project. The work at
Jhakarkati in Kanpur will be...Read More

Nanis Buildcon is setting up Nanis Vedant Beryl project at Sonegaon.

Nanis Buildcon is setting up Nanis Vedant Beryl project at Sonegaon.
project offers 2, 3 BHK Apartment configuration. The amenities and
facilities...Read More

Krisna Nirmaan Skyscraper LLP is setting up Dhanori residential and commercial project in Dhanori, Pune.

Krisna Nirmaan Skyscraper LLP is setting up Dhanori residential and
commercial project in Dhanori, Pune. Project is under-construction and
expected for completion in...Read More

Geothermal

The WB Power Development Corporation is setting up Bakreswar thermal power station (1x660 MW) at Birbhum.

The WB Power Development Corporation is setting up Bakreswar thermal power
station (1x660 MW) at Birbhum. Project is still in planning stage...Read More

Construction

Ranawat Properties is setting up Aura Waters – 2 & 3 BHK apartments at Sinhagad Road Pune.

Ranawat Properties is setting up Aura Waters – 2 & 3 BHK apartments at
Sinhagad Road Pune. Dec 2022 : Project work...Read More

Panisagar Nagar Panchayat is setting up construction of hard drawn fencing work around the newly constructed swimming pool.

Panisagar Nagar Panchayat is setting up construction of hard drawn fencing
work around the newly constructed swimming pool in
Panisagar,Tripura. Feb 2024 :...Read More

Sagarmatha Ventures is setting up Ashiyana Heights project in Matigara.

Sagarmatha Ventures is setting up Ashiyana Heights project in
Matigara. The project offers 2, 3 BHK Apartment configuration. The
amenities and facilities include...Read More

Airports Authority of India is setting up construction of parking shed at Kolhapur Airport.

Airports Authority of India is setting up construction of parking shed of
New ATC Tower at Kolhapur Airport. Aug 2024...Read More

MSRDC is setting up construction of JNE 01 from Panshendra and JNE 02 packages in Jalna

MSRDC is setting up construction of JNE 01 from Panshendra and JNE 02
packages in Jalna of Access Controlled Expressway...Read More

Centre for Development of Telematics is setting up 4G control room at CDOT, Delhi.

Centre for Development of Telematics is setting up 4G control room at CDOT,
Delhi. Project is still in planning stage due to...Read More

Indian Institute of Astrophysics is setting up minor civil works at crest campus, IIA, Hosakaote, Bengaluru.

Indian Institute of Astrophysics is setting up minor civil works at crest
campus, IIA, Hosakaote, Bengaluru. Project is stlll in planning stage
due...Read More

Hon. Principal District Judge is setting up criminal court building at Yerwada.

Hon. Principal District Judge is setting up criminal court building at
Yerwada. Project is still in planning stage due to govt permission...Read More

Bhabha Atomic Research Centre is setting up precast panel boundary wall and watch towers at Trombay Hill.

Bhabha Atomic Research Centre is setting up precast panel boundary wall and
watch towers at Trombay Hill. from R-5 Gate to DEED...Read More

National Aluminium Company is setting up construction of NALCO Office Building at Kharghar, Mumbai.

National Aluminium Company is setting up construction of NALCO Office
Building at Kharghar, Mumbai. Project is still in planning stage due to
tender...Read More

Indian Institute of Technology Roorkee is setting up construction of Vikas Nagar Parking at IIT Roorkee.

Indian Institute of Technology Roorkee is setting up construction of Vikas
Nagar Parking at IIT Roorkee. Project is still in planning stage...Read More

Damodar Valley Corporation is setting up renovation & expansion of Banquet Hall at DVC Towers Kolkata.

Damodar Valley Corporation is setting up renovation & expansion of Banquet
Hall at DVC Towers Kolkata. Project in still in planning stage...Read More

MSRDC is setting up construction of PRR E1 and PRR E2 packages of access controlled Pune Ring Road.

MSRDC is setting up construction of PRR E1 and PRR E2 packages of access
controlled Pune Ring Road. Project is still in...Read More

MSRDC is setting up construction of PRR W4 and PRR W5 packages Access Controlled Pune Ring Road.

MSRDC is setting up construction of PRR W4 and PRR W5 packages Access
Controlled Pune Ring Road. Project is still in planning...Read More

MSRDC is setting up construction of PRR E3A, PRR E3B, and PRR E4 packages access controlled Pune Ring Road.

MSRDC is setting up construction of PRR E3A, PRR E3B, and PRR E4 packages
access controlled Pune Ring Road. Project is still...Read More

MSRDC is setting up construction of PRR W1, PRR W2, and PRR W3 packages of Access Controlled Pune Ring Road.

MSRDC is setting up construction of PRR W1, PRR W2, and PRR W3 packages of
Access Controlled Pune Ring Road. Project is...Read More

MSRDC is setting up construction of NG 01 and NG 02 packages, as part of Nagpur-Gondia Expressway, Tiroda connector and Gondia Bypass.

MSRDC is setting up construction of NG 01 and NG 02 packages, as part of
Nagpur-Gondia Expressway, Tiroda connector and Gondia...Read More

MSRDC is setting up construction of NG 04 and NG 05 packages, as part of Nagpur-Gondia Expressway, Tiroda connector and Gondia Bypass.

MSRDC is setting up construction of NG 04 and NG 05 packages, as part of
Nagpur-Gondia Expressway, Tiroda connector and Gondia...Read More

ITC Limited is plans to set up PSPD Residential Complex in Sarapaka

ITC Limited is plans to set up PSPD Residential Complex in Sarapaka
Village, Bhadradri Kothagudem project includes Manager Housing Building,
SR...Read More

Solar

Construction of floating solar project at Omkareshwar dam on Narmada river in Khandwa.

Construction of floating solar project at Omkareshwar dam on Narmada
river in Khandwa. The primary feasibility study of the project...Read More

Department of Irrigation is setting up Solar MDTW Scheme: Hajo Jalukbari Division.

Department of Irrigation is setting up Solar MDTW Scheme: Hajo Jalukbari
Division./amingaon Project is under-construction and expected to be
completed by Mar-April 2024. Aug...Read More

Development of a 75 MW (AC) grid-connected solar PV power plant along with a 132 kV Sub-Station in Jamui, Bihar.

Development of a 75 MW (AC) grid-connected solar PV power plant along with
a 132 kV Sub-Station in Jamui, Bihar. Hartek Power...Read More

Rudra Global Infra plans to set up a 30 MW captive solar project in Gujarat.

Rudra Global Infra plans to set up a 30 MW captive solar project in
Gujarat. Company plans to invest Rs. 190 crore...Read More

Elevator

PWD UT is setting up passenger lift installation in Leh Ladakh.

PWD UT is setting up passenger lift installation in Leh Ladakh. design,
supply, installation, testing, and commissioning of three 8-passenger lifts
(elevators) at...Read More

Centre for Development of Telematics is setting up installation of 2 Lifts with civil and electrical works at New Delhi.

Centre for Development of Telematics is setting up installation of 2 Lifts
with civil and electrical works at New Delhi. Aug 2024...Read More

MP Power Generating Company is setting up procurement of east india lift spares for lift 1 and 2 of Admin building, SSTPP, Dongalia.

MP Power Generating Company is setting up procurement of east india lift
spares for lift 1 and 2 of Admin building,...Read More

Energy

Development of renewable hybrid energy project at the Hinduhridaysamrat Shivsenapramukh Balasaheb Thackeray Middle Vaitarna Dam.

Independent Engineer for Development of renewable hybrid energy project
facilities at the Hinduhridaysamrat Shivsenapramukh Balasaheb Thackeray
Middle Vaitarna Dam. Aug 2024 : Project...Read More

Construction

Ranawat Properties is setting up Aura Waters – 2 & 3 BHK apartments at Sinhagad Road Pune.

Ranawat Properties is setting up Aura Waters – 2 & 3 BHK apartments at
Sinhagad Road Pune. Dec 2022 : Project work...Read More

Panisagar Nagar Panchayat is setting up construction of hard drawn fencing work around the newly constructed swimming pool.

Panisagar Nagar Panchayat is setting up construction of hard drawn fencing
work around the newly constructed swimming pool in
Panisagar,Tripura. Feb 2024 :...Read More

Sagarmatha Ventures is setting up Ashiyana Heights project in Matigara.

Sagarmatha Ventures is setting up Ashiyana Heights project in
Matigara. The project offers 2, 3 BHK Apartment configuration. The
amenities and facilities include...Read More

Airports Authority of India is setting up construction of parking shed at Kolhapur Airport.

Airports Authority of India is setting up construction of parking shed of
New ATC Tower at Kolhapur Airport. Aug 2024...Read More

MSRDC is setting up construction of JNE 01 from Panshendra and JNE 02 packages in Jalna

MSRDC is setting up construction of JNE 01 from Panshendra and JNE 02
packages in Jalna of Access Controlled Expressway...Read More

Centre for Development of Telematics is setting up 4G control room at CDOT, Delhi.

Centre for Development of Telematics is setting up 4G control room at CDOT,
Delhi. Project is still in planning stage due to...Read More

Indian Institute of Astrophysics is setting up minor civil works at crest campus, IIA, Hosakaote, Bengaluru.

Indian Institute of Astrophysics is setting up minor civil works at crest
campus, IIA, Hosakaote, Bengaluru. Project is stlll in planning stage
due...Read More

Hon. Principal District Judge is setting up criminal court building at Yerwada.

Hon. Principal District Judge is setting up criminal court building at
Yerwada. Project is still in planning stage due to govt permission...Read More

Bhabha Atomic Research Centre is setting up precast panel boundary wall and watch towers at Trombay Hill.

Bhabha Atomic Research Centre is setting up precast panel boundary wall and
watch towers at Trombay Hill. from R-5 Gate to DEED...Read More

National Aluminium Company is setting up construction of NALCO Office Building at Kharghar, Mumbai.

National Aluminium Company is setting up construction of NALCO Office
Building at Kharghar, Mumbai. Project is still in planning stage due to
tender...Read More

Indian Institute of Technology Roorkee is setting up construction of Vikas Nagar Parking at IIT Roorkee.

Indian Institute of Technology Roorkee is setting up construction of Vikas
Nagar Parking at IIT Roorkee. Project is still in planning stage...Read More

Damodar Valley Corporation is setting up renovation & expansion of Banquet Hall at DVC Towers Kolkata.

Damodar Valley Corporation is setting up renovation & expansion of Banquet
Hall at DVC Towers Kolkata. Project in still in planning stage...Read More

MSRDC is setting up construction of PRR E1 and PRR E2 packages of access controlled Pune Ring Road.

MSRDC is setting up construction of PRR E1 and PRR E2 packages of access
controlled Pune Ring Road. Project is still in...Read More

MSRDC is setting up construction of PRR W4 and PRR W5 packages Access Controlled Pune Ring Road.

MSRDC is setting up construction of PRR W4 and PRR W5 packages Access
Controlled Pune Ring Road. Project is still in planning...Read More

MSRDC is setting up construction of PRR E3A, PRR E3B, and PRR E4 packages access controlled Pune Ring Road.

MSRDC is setting up construction of PRR E3A, PRR E3B, and PRR E4 packages
access controlled Pune Ring Road. Project is still...Read More

MSRDC is setting up construction of PRR W1, PRR W2, and PRR W3 packages of Access Controlled Pune Ring Road.

MSRDC is setting up construction of PRR W1, PRR W2, and PRR W3 packages of
Access Controlled Pune Ring Road. Project is...Read More

MSRDC is setting up construction of NG 01 and NG 02 packages, as part of Nagpur-Gondia Expressway, Tiroda connector and Gondia Bypass.

MSRDC is setting up construction of NG 01 and NG 02 packages, as part of
Nagpur-Gondia Expressway, Tiroda connector and Gondia...Read More

MSRDC is setting up construction of NG 04 and NG 05 packages, as part of Nagpur-Gondia Expressway, Tiroda connector and Gondia Bypass.

MSRDC is setting up construction of NG 04 and NG 05 packages, as part of
Nagpur-Gondia Expressway, Tiroda connector and Gondia...Read More

ITC Limited is plans to set up PSPD Residential Complex in Sarapaka

ITC Limited is plans to set up PSPD Residential Complex in Sarapaka
Village, Bhadradri Kothagudem project includes Manager Housing Building,
SR...Read More

Building

Construction of Admin Building in Trichy

Construction of Admin Building in Trichy Construction of Admin Building
(Ground plus one) along with site development including internal electrical
installations, lightning...Read More

Suyojit Infrastructure is setting up commercial-cum-hostel building in Nashik.

Suyojit Infrastructure is setting up commercial-cum-hostel building in
Nashik. Project is still in planning stage due to govt permissions is
awaited. ...Read More

SSN Trust is setting up constructing a new building at Chengalpattu.

SSN Trust is setting up constructing a new building at Chengalpattu. o
expand its educational institution by constructing a new building with...Read More

Township

Development of new residential township 'Harnadnipuram' near the Delhi Meerut Road in Ghaziabad.

Development of new residential township 'Harnadnipuram' near the Delhi
Meerut Road in Ghaziabad. The board of the Ghaziabad Development
Authority (GDA) has cleared...Read More

Railway

Construction of roadbed, minor bridges, and other works on Indore-Budni section of Bhopal Division West Central Railway in Madhya Pradesh. (Package 1B)

Construction of roadbed, minor bridges, and other works on Indore-Budni
section of Bhopal Division West Central Railway in Madhya Pradesh. (Package
1B) Bids...Read More

Ground infrastructure works for provision of Kavach and laying of 4G LTE-R in South Central Railway.

Ground infrastructure works for provision of Kavach and laying of 4G LTE-R
in South Central Railway. Bids are invited for the project. The...Read More

Natural Gas

Coal India joint venture (JV) with GAIL (INDIA) plans to set up a coal-to-synthetic natural gas (SNG) plant in Raniganj area of Eastern Coalfields, West Bengal.

Coal India joint venture (JV) with GAIL (INDIA) plans to set up a
coal-to-synthetic natural gas (SNG) plant in Raniganj area...Read More

Packaged Food

Pramod Confectionery & Food Industries plans for expansion for bakery products in Bihta, Patna dist, Bihar.

Pramod Confectionery & Food Industries plans for expansion for bakery
products in Bihta, Patna dist, Bihar. The company plans to set...Read More

Engineering

Travancore Titanium Products is setting up engineering design of plaster of paris plant in Thiruvananthapuram.

Travancore Titanium Products is setting up engineering design of plaster of
paris plant in Thiruvananthapuram. Project is still in planning stage
due to...Read More

Roadways

Development of shifting of line crossing in Nashik and Ahamednagar dist.

Development of shifting of line crossing in Nashik and Ahamednagar
dist. Bids are invited for the project. The contract comprises
shifting of Lt Ht...Read More

Development of shifting of line crossing in Sangli Kolhapur dist, Maharashtra.

Development of shifting of line crossing in Sangli Kolhapur dist,
Maharashtra. Bids are invited for the project. Tender is floated at a
cost of...Read More

Electrical Products

Indian Institute of Management Udaipur is setting up high mast towers at IIM Udaipur.

Indian Institute of Management Udaipur is setting up high mast towers at
IIM Udaipur. 16 meter and 12.5 meter High Mast towers...Read More

Transformer

Nuclear Fuel Complex is setting up transformers & HT cables, augmentation loads, OPF

Nuclear Fuel Complex is setting up transformers & HT cables, augmentation
loads, OPF SITC of Transformers, 11 KV HT cables and associated...Read More

Auto Ancillaries

Uno Minda plans to set up a greenfield sunroof manufacturing facility at Bawal, Haryana.

Uno Minda plans to set up a greenfield sunroof manufacturing facility at
Bawal, Haryana. Company's board has given its nod for a...Read More

Rail Electrificat

Upgradation of electric traction system between Jharsuguda-Raigarh section of Bilaspur division.

Upgradation of electric traction system between Jharsuguda-Raigarh section
of Bilaspur division. Bids are invited for the project. The contract
valued at Rs. 105.1 crore...Read More

Upgradation of OHE in Gudur-Tirupati double line section in Andhra Pradesh.

Upgradation of OHE in Gudur-Tirupati double line section in Andhra
Pradesh. Bids are invited for the project. The commissioning work,
valued at Rs. 80.58...Read More

Refinery

Godrej Agrovet plans to establish an oil palm processing milling unit in Dhalai dist, Tripura

Godrej Agrovet plans to establish an oil palm processing milling unit in
Dhalai dist, Tripura Company will also set up an advanced...Read More

For Advertisement, please contact +91-9751178830 or send your enquiry at marketing@newsonprojects.com

To ensure you receive our Weekly newsletter, make sure you add info@newsonprojects.com to your address book. If you prefer not to receive future email from the newsonprojects.com, please unsubscribe here.