Published On:December 30 2025
Story Viewed 235 Times
"Waaree Power scales up: New 1.525 GW solar inverter facility officially goes live."
Waaree Power Private Limited, a wholly owned subsidiary of Waaree Energies Limited, has inaugurated its new solar inverter manufacturing facility at Sarodhi-Valsad, Gujarat. The facility comprises two production lines, each with an annual capacity of 1.525 GW, bringing the total capacity to 3.05 GW.
Operations at the facility officially commenced on December 29, 2025, at 10:00 am. The new plant is expected to strengthen Waaree Power’s manufacturing capabilities and support its expansion in the renewable energy sector.