Published On:April 8 2023
Story Viewed 1802 Times
Kalyani Steels Ltd. Commissions Coke Making Facility and partial commissioning of Waste Heat Recovery based Captive Power Plant.
Kalyani Steels Ltd. had planned to set up a 200,000 TPA Non-recovery / Heat recovery, stamp charged Coke Oven with Modified wet Quenching of hot coke and 17-18 MW captive power plant to be operated utilizing waste heat energy of flue gas generated from Coke Oven. The electrical power so produced shall be used for captive consumption and the surplus, if any, will be sold to external agencies. The Broad Specifications were as follows:
Coke Oven
- Annual capacity (Dry coke) - 0.2 MT
- No. of Ovens - 72 (Divided in two batteries of 36 ovens each)
Heat Recovery Captive Power Plant
- Power generation capacity - 17-18 MW
- Generation voltage - 11KV
Respecting its commitment to the Atmanirbhar Bharat campaign, the process technology adopted was indigenous coke-making technology with all latest innovations incorporated for a high degree of technological performance and product quality.
The Company has commissioned the Coke oven plant with all its auxiliaries and utility systems and started its commercial production from March 31, 2023. The production has already attained the designed capacity and the product quality is amongst the best in the industry.
The power plant with the turbine - generator with all the balance of plant (BOPs) with one of the two boilers has also been commissioned, while the second boiler to be added to the steam circuit is going to be commissioned shortly.